Search results

From Blue Gold Program Wiki
  • gained during the development of a ‘Theory of Change’ (ToC) in 2016. The 2016 Theory of Change (ToC) describes five main development pathways that comprise
    46 KB (6,223 words) - 15:49, 16 December 2021
  • In the ToC, this link is explored and provides an important step towards understanding the processes involved.’ Although the benefits of the ToC and the
    29 KB (4,086 words) - 16:03, 16 December 2021
  • activities listed above, this section also looks at how BGP operationalised the PWM concept and it concludes with a section on a way forward for participatory
    10 KB (1,236 words) - 05:50, 19 December 2021
  • this report to operate between 0.5 acres and 2.5 acres (0.2 to 1.0 ha) SO Section Officer (BWDB) SRP Systems Rehabilitation Project SSSFCDI Second Small Scale
    52 KB (7,933 words) - 10:45, 12 January 2022
  • interventions of Blue Gold, which are reported in sections C, D, E and F. Since the perspective of Section G is project management, this chapter on capacity
    24 KB (2,655 words) - 15:51, 16 December 2021
  • within the polder. Later sections cover water management partnerships (Section D), commercialisation of agriculture (Section E) and sustainability and
    13 KB (1,815 words) - 11:26, 19 December 2021
  • Netherlands and Bangladesh". The section is based inter alia on Kingdom of Netherlands website. "কৃষি মন্ত্রণালয়". The section reflects information found on
    32 KB (3,802 words) - 11:05, 19 December 2021
  • its interventions by taking notice of their differing requirements. In Section E the focus was on the first category of households and Blue Gold interventions
    70 KB (8,460 words) - 15:42, 16 December 2021
  • adaptation of new technologies 2.4.1 (a) Khulna 2.4.2 (b) Satkhira 2.4.3 (c) Patuakhali 3 Notes 4 See more One of the central objectives of the Blue Gold
    30 KB (3,551 words) - 11:17, 19 December 2021
  • Call for Action 2.2 Section A: Background and context 2.3 Section B: Development Outcomes 2.4 Section C: Water Infrastructure 2.5 Section D: Participatory
    5 KB (673 words) - 04:15, 22 December 2021
  • Work Plans 8 Polder Development Plans 9 Progress Reports 10 See more This section of the report aims to set out the arrangements for implementing the Blue
    16 KB (2,029 words) - 03:32, 9 November 2021
  • 43/2D, 43/2E and 43/2F P27/1 and P27/2, P28/1 and P28/2, P34/2, P55/2A,  P55/2C, 25, 47/3, 47/4
    7 KB (705 words) - 16:07, 16 December 2021
  • not exceeding 150mm thickness with clod breaking to a max size of 100mm Section C Chapter 12
    44 KB (4,821 words) - 06:00, 19 December 2021
  • use of different types of land 1.2.1 (a) Highland 1.2.2 (b) Lowland 1.2.3 (c) Fresh water ghers 1.2.4 (d) Saline water ghers 1.3 Changes in overall land
    44 KB (4,611 words) - 08:48, 14 December 2021
  • to be the driving force for change. This section supplements the discussion under ‘Previous History’ in Section A Chapter 4 The present Bangladesh Water
    10 KB (1,237 words) - 08:57, 14 December 2021
  • agricultural development- as the core elements of Blue Gold’s approach. This section E focuses on BGP’s agricultural development interventions which sought to
    16 KB (2,433 words) - 05:52, 19 December 2021
  • to participatory monitoring and eventually to self-assessment. The final sections of this chapter account for the development of a polder dashboard to provide
    22 KB (2,464 words) - 16:06, 16 December 2021
  • it shares with several other donor-funded water sector projects – this section provides an overview of the policy, legal and regulatory provisions, which
    19 KB (1,598 words) - 11:13, 19 December 2021
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    19 KB (2,179 words) - 07:36, 8 December 2021
  • and to comment on lessons learnt in designing future projects. The final section of the chapter emphasises the importance of budgeting for emergency repairs
    37 KB (4,767 words) - 02:42, 7 December 2021
  • areas in both P47/3 and P47/4 being served by irrigation facilities. This section describes the social context of the livelihood of coastal Bangladesh. To
    72 KB (7,650 words) - 11:09, 19 December 2021
  • focusing mainly on the new polders. This report is laid out in eight sections (Sections A to H), as described in Table 1.2.
    12 KB (1,467 words) - 11:01, 19 December 2021
  • the primary level; b)   Water Management Association (WMA) at mid-level; and c)   Water Management Federation (WMF) at the apex level As BGP continued where
    30 KB (4,038 words) - 14:56, 16 December 2021
  • 5 Monitoring, Reflection and Learning 3.6 Miscellaneous 4 See more This section of the report sets out to provide the context within which the EKN-funded
    11 KB (1,065 words) - 11:26, 22 November 2021
  • Project T&C Training & Communications TA Technical Assistance T-Aman Transplanted Aman Rice TL Team Leader TNA Training Needs Assessment ToC Theory of
    9 KB (1,138 words) - 06:09, 4 February 2021
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    5 KB (612 words) - 16:11, 16 December 2021
  • This section provides background and context for lessons learnt during the Blue Gold Program by providing a description of the project, its ambitions,
    8 KB (665 words) - 10:59, 19 December 2021
  • attributed second priority in the water resources management section, while the environmental section emphasises the benefits of re-excavation of khals for drainage
    11 KB (1,418 words) - 14:42, 16 December 2021
  • interventions in primary infrastructure (see Section C) and from involvement and capacity building of WMOs (see Section D Chapters 14 and 15) which in turn provides
    71 KB (10,547 words) - 14:33, 16 December 2021
  • Earlier sections in BGP’s lessons learnt report have consistently demonstrated how the project concept evolved from complementary interventions in community
    7 KB (979 words) - 05:57, 19 December 2021
  • small-scale water infrastructure investment program (see section D). From the previous section it should be clear that technology transfer messages must
    42 KB (5,160 words) - 11:50, 21 November 2021
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    8 KB (1,141 words) - 16:00, 16 December 2021
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    12 KB (1,648 words) - 14:38, 16 December 2021
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    5 KB (554 words) - 14:58, 16 December 2021
  • original allocation of €4.4 million (ref Program Document, August 2012 - Section 5.2.5 pp 60/61) was made for “services providers under the Water Innovation
    20 KB (2,745 words) - 16:13, 16 December 2021
  • treated as a method in its own right and is discussed at greater length in Section G Chapter 33. Videos – the BGP TA team developed a number of videos and
    21 KB (2,509 words) - 15:58, 16 December 2021
  • on-the-job, with explanations culminating in the making of a model cross-section of the earthwork to be implemented. The Gender and Leadership Development
    15 KB (2,018 words) - 14:40, 16 December 2021
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    16 KB (2,332 words) - 16:23, 16 December 2021
  • would be by LCS groups, in particular the re-excavation of khals and re-sectioning of embankments. Initially the contracts were directly between BWDB and
    23 KB (3,334 words) - 05:54, 19 December 2021
  • doubling since the start of BGP, while male wages have only gone up by 50%.  Section B Introduction and Summary provides an overview of the studies conducted
    20 KB (2,385 words) - 11:49, 14 December 2021
  • that are more inclusive and gender-responsive, and more sustainable. This section presents how BGP enhanced inclusiveness and sustainability and reviews the
    31 KB (4,504 words) - 15:47, 16 December 2021
  • members. When the purchase of inputs was coordinated across a WMG or a sub-section thereof, this led to a stronger relationship with market partners; where
    11 KB (1,423 words) - 14:52, 16 December 2021
  • This section presents the outcomes and impacts of the BGP interventions based on independently collected survey data. In other words, this section assesses
    27 KB (4,162 words) - 11:15, 19 December 2021
  • shifts across the polders on the basis of the WMG surveys, see also Section B. This section presents the direct qualitative outcomes of the commercialisation
    35 KB (4,537 words) - 15:07, 16 December 2021
  • of the water management fund or the productive sector fund. In this sub-section we look at which projects were funded by these two funding windows and what
    33 KB (4,397 words) - 16:21, 16 December 2021
  • security on the basis of homestead production described in chapter 25 of Section F. Both strategies are based upon the FFS approach and both include market
    41 KB (5,154 words) - 15:00, 16 December 2021
  • positive about paddy production, but less enthusiastic about expanding fish. Section B Introduction and Summary provides an overview of the studies conducted
    32 KB (3,385 words) - 11:19, 19 December 2021
  • also to draw conclusions for LCS work in the future, see the below section. This section provides the findings of a study on LCSs commissioned by Blue Gold
    47 KB (6,336 words) - 15:44, 16 December 2021
  • international gender expert. The Inception Report of Blue Gold included a section on gender as part of the cross-cutting themes, whereas gender concerns were
    92 KB (11,673 words) - 08:08, 19 November 2021
  • agricultural and non-agricultural endeavours and in their children’s education. Section B Introduction and Summary provides an overview of the studies conducted
    67 KB (5,353 words) - 11:24, 19 December 2021
  • other projects followed as can be seen below in Section 5.2.2 Table 1, with brief descriptions. This sub-section lists of the 21 projects which have contributed
    35 KB (3,682 words) - 16:50, 26 November 2020
  • equipment 10.4 Maps and statistics (in annex) 11    Reimbursement process C      BGP Interventions: PARTICIPATORY WATER MANAGEMENT SUMMARY – PARTICIPATORY
    11 KB (1,507 words) - 09:47, 19 February 2020
  • Section H innovation fund (category Section H)
    This article "Section H - Innovation fund" is part of the articles on Section A-H, based on the Lessons Learnt report of the Blue Gold Program. The original
    15 KB (1,101 words) - 06:49, 28 July 2020
  • this report to operate between 0.5 acres and 2.5 acres (0.2 to 1.0 ha) SO Section Officer (BWDB) SRP Systems Rehabilitation Project SSSFCDI Second Small Scale
    13 bytes (7,933 words) - 11:32, 21 April 2021
  • water resource management systems with special attention to the poorer section of the population. The purpose is being achieved by: Developing improved
    76 KB (11,297 words) - 11:04, 23 November 2020
  • Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure Summary Chapter
    10 KB (28 words) - 05:09, 1 April 2021
  • direction of the overall governance in the country’s water sector, this section recalls for the purpose of this BGP Final Report those policy elements that
    32 KB (4,632 words) - 06:53, 23 November 2020
  • Polder 43/2B 4.3 Polder 43/2D 4.4 Polder 43/2E 4.5 Polder 55/2A 4.6 Polder 55/2C 5 Barguna O&M 5.1 Polder 43/1A 5.2 Polder 43/2F 6 Kalapara 6.1 Polder 47/3
    20 KB (196 words) - 11:13, 31 October 2021
  • File:ARM Aide Memoire 2-14oct 2016 31oct 16.pdf (category File used in Section G: Project Management) (matches file content)
    and recommendations are discussed in Section 3 below. In response to the terms of reference of the mission Section 4 lists the additional requirements that
    (1,239 × 1,754 (4.25 MB)) - 10:54, 22 July 2020
  • problem ranking of 1 to 5. The section of BP’s lessons learnt report on participatory water management sections (Section D, chapters 14-20) elaborate how
    48 KB (5,884 words) - 12:21, 2 September 2021
  • File:WP9 Gender Approach v1 19sep 16.pdf (matches file content)
    of male and female WMO members had made the difference. 7 Dewan, C; Buisson, M.-C. and Mukherji, A. 2014. The Imposition of participation? The case of
    (1,239 × 1,754 (984 KB)) - 19:50, 16 December 2020
  • File:ARM Aide Memoire 27Sep-13Oct 2015.pdf (category Files not used by any section) (matches file content)
     change   Section  4   Location  should  be  based  in  harmony  with  the  polder  area  of  the  project     Section  5
    (1,240 × 1,753 (6.1 MB)) - 06:55, 15 April 2020
  • agricultural development- as the core ingredients to Blue Gold’s approach. This section focuses on BGP’s agricultural development interventions which sought to
    16 KB (2,437 words) - 06:27, 23 May 2021
  • File:Bgp-llr-printable-edition-20211219.pdf (matches file content)
    Standards� 135 Section C: Water Infrastructure� 143 Section C: Summary� 145 C.1 Context� 145 C.2 Purpose of Polder Infrastructure� 146 C.3 Infrastructure
    (1,240 × 1,753 (20.78 MB)) - 06:04, 20 December 2021
  • and context 2.2 Part B - BGP Interventions: Water infrastructure 2.3 Part C - BGP Interventions: Participatory Water Management 2.4 Part D - BGP Interventions:
    19 KB (821 words) - 11:21, 27 April 2020
  • risky and suitable working area;  (b) Availability of earth and laborers; (c) Handing over the work site by the concerned BWDB field officials to WMGs/LCSs
    4 KB (695 words) - 10:32, 16 May 2021
  • File:TR27 Impact of Blue Gold Program draft final 24apr 21.pdf (matches file content)
    Program 3 Demography This section provides the demographic profile of the rural coastal households of BGP areas. This section describes the demographic
    (1,240 × 1,754 (3.04 MB)) - 08:46, 11 May 2021
  • for promulgating legal provisions for PWM. The chapter concludes with a section that zooms-out again to reflect on today’s context for Participatory Water
    41 KB (6,021 words) - 17:46, 21 November 2020
  • File:GoB WARPO Water Rules Bidhimala aug 18 (Bangla).pdf (matches file content)
    \9tc"±ii c\9q mrfe gqTz¥ aTeniT xp dr th fror \giciczii c\9fl qi\9it2q. aqtcH ftf69tai qfaed rfu th ¢fa3ii c`; flae acan fflfi rfu, apse 4a un sO c5 aw apli\9i<cci
    (912 × 1,427 (20.9 MB)) - 19:59, 8 July 2020
  • File:PP TA ARM Discussion Paper 2016 1oct 16.pdf (matches file content)
    of WM interventions  not internally  circulated  2c. CWM area  selection done,  budget update still  required  12 3a. see 1a, b, c  3b. done; mid July  onwards ‐ UP & 
    (1,239 × 1,754 (812 KB)) - 09:40, 2 July 2020
  • File:WP01 Theory of Change 30nov 15.pdf (category ToC) (matches file content)
    a tree today! Mott Mac cDonald is committed c to integrating ssustainability y into our operational praactices and culture. c As a world lead ding consulta
    (1,239 × 1,754 (245 KB)) - 10:05, 20 July 2020
  • File:WP6 MRL Plan 31aug 16.pdf (category File used in Section G: Project Management) (matches file content)
    MRL Plan 23 v1 - August 2016 Annex II: Indicator & Tools Matrix ToC Level ToC Summary Indicator Tools Block Improved Livelihoods Impact (12 indicators)
    (1,239 × 1,754 (940 KB)) - 13:20, 20 April 2021
  • File:GoN Program Document BGP 28Aug12.pdf (matches file content)
    undertaken in the context of the WASH component (see section 5.1) and in the gender component (see section 5.2.2). 5.2.4 Climate change Climate change has
    (1,239 × 1,754 (3.77 MB)) - 19:23, 8 July 2020
  • File:GoB BWDB PWMR 2014 (english) 11feb 14.pdf (matches file content)
    by any organization under Section 49; (7) “Labour Contracting Society” (LCS) means group of landless women and men under Section 43; (8) “Group” means Water
    (1,240 × 1,754 (998 KB)) - 12:39, 8 July 2020
  • File:PR jul dec 2015 HPR-Half-Yearly Progress Report Jul-Dec 2015.Final.pdf (matches file content)
    FTR 29 C4 to Khulna C3 to Khulna C1 to Khulna C4 to Patuakhali C3 to Patuakhali C1+C5 to Patuakhali C5 to Patuakhali C1 + C5 to Patuakhali C1 + C2 + BWDB
    (1,240 × 1,754 (3.83 MB)) - 19:25, 8 July 2020
  • File:PR jan jun 2016 HYPR Jan-Jun 2016 9sep 16.pdf (category File used in Section G: Project Management) (matches file content)
    FTR 01 C4 to Khulna FTR 02 C3 to Khulna FTR 03 C1 to Khulna FTR 04 C4 to Patuakhali FTR 05 C3 to Patuakhali FTR 06 C1+C5 to Patuakhali FTR 07 C5 to Patuakhali
    (1,240 × 1,754 (3.36 MB)) - 10:40, 22 July 2020
  • File:IR Inception Report, revised March 2014.pdf (category File used in Section G: Project Management) (matches file content)
    com 2. 3 c) Md. Masud Ahmed c) Md. Asaduzzaman d) Nityananda Chakravorty and 2 other staff 4 a) Md. Salim Bhuiyan Blue Gold Program c) Director
    (1,275 × 1,650 (4.35 MB)) - 10:48, 22 July 2020
  • File:TR14 Phase 1 Baseline Survey Report.pdf (category File used in Section G: Project Management) (matches file content)
    the training on the paper based questionnaire be completed section by section as each section was finalized in conjunction with the BG M&E Team. There were
    (1,240 × 1,754 (4.44 MB)) - 04:15, 10 March 2021
  • File:BGIF22C 25jun 20 Final Report WBC Phase 3 United Purpose.pdf (category File used in Section H: Innovation Fund)
    Women's Business Centres (WBCs) Final Report Phase III BGIF22C 25jun_20 Final Report_WBC Phase 3 United Purpose
    (1,240 × 1,754 (2.83 MB)) - 13:49, 9 December 2020
  • File:PP TA ARM position paper 2018 3nov 18.pdf (matches file content)
    AeKvVv‡gv ev¯Íevq‡b c‡ivÿ cÖwµqv 1 v1.2 – 16th September 2018 3| c‡ivÿ c×wZ: D‡jøwLZ b~Zb c×wZ‡Z AeKvVv‡gv ev¯Íevq‡bi `vwqZ¡ cÖavbZt cvwb e¨e¯’vcbv
    (1,240 × 1,754 (31.43 MB)) - 09:52, 2 July 2020
  • File:BGIF26C 23jun 20 SWIFT Phase III Final Report United Purpose.pdf (category File used in Section H: Innovation Fund)
    BGIF26C 23jun_20 SWIFT Phase III Final Report United Purpose.pdf SWIFT Phase III Final Report BGIF26C
    (1,240 × 1,754 (2.58 MB)) - 19:42, 9 December 2020
  • File:BGIF27B Innovision Final Report Pangasius aquaculture 31jan 19.pdf (category File used in Section H: Innovation Fund) (matches file content)
    evÂbxq mßv‡n 04 w`b m¤ú~iK Lv`¨ cÖ‡qvM Ki‡Z nq| †cvbv gRy‡`i ci †_‡K Avni‡Yi c~e© ch©šZ c×wZ-2 • • • • • • c×wZ-1 cyKzi cÖ¯‘wZi ci Dc‡hvwMZv Abyhvqx
    (1,275 × 1,650 (5.23 MB)) - 10:57, 22 July 2020
  • File:BGIF32 29nov 20 Final Report BGIF-KU WH project.pdf (category File used in Section H: Innovation Fund) (matches file content)
    described in section three. In this section, the rationale, goal, objectives and approach of the project are described. The fourth section presents the
    (1,240 × 1,754 (1.61 MB)) - 19:52, 9 December 2020
  • File:BGIF27A Innovision - Feasibility Study Pangasius aquaculture 21may 18.pdf (category File used in Section H: Innovation Fund) (matches file content)
    ……………………… 1.8 gvQ Pv‡l †Kvb cÖKvi cÖvwZôvwbK mn‡hvwMZv (cÖwkÿY/Avw_©K) jvf K‡i‡Qb (grm¨ Awa`ßi/weGdAviAvB/ GbwRI/ mwgwZ/cÖKí? 2. cyKz‡ii Z_¨ welq cyKz‡ii
    (1,275 × 1,650 (1,004 KB)) - 10:57, 22 July 2020
  • File:BGIF20 WorldFish - Ecopond and Empowerment Project II 8jan 18.pdf (category File used in Section H: Innovation Fund) (matches file content)
    Vennabunia H. S. C.; Start work: 17 April, 2017 3. Lucky Mondal M: Bolabunia,Mailmara, Britti Kholshibunia, 01732934772 Charkhali Machalia, H.S.C Shukdara Start
    (1,275 × 1,650 (2.19 MB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19 edited.pdf (category File used in Section G: Project Management) (matches file content)
    80% of WMGs report an increase in c.i., 11% no change and 8% decrease. The proportion of WMGs with an increase in c.i. was highest in Satkhira at 92% and
    (1,240 × 1,754 (3.77 MB)) - 08:20, 18 May 2021
  • File:BGIF26A United Purpose - Feasibility study SWIFT 17apr 18.pdf (category File used in Section H: Innovation Fund) (matches file content)
    (prioritised) concrete drain for irrigation/Micro dam construction) C.7 C.7.1 C.7.4 # Unit Justification Parishad for tappinginto resources from the
    (1,240 × 1,754 (2.36 MB)) - 10:57, 22 July 2020
  • File:BGIF10 Nice Foundation - Improved Pig Hygiene in Kawra Community 13nov 16.pdf (category File used in Section H: Innovation Fund) (matches file content)
    week Temperature 28.9°C Piglet for a month Piglet for two month 35°C 20-27.8°C Adult pigs weighing 90 kg or above 17.8-22.2°C Reproduction of pigs
    (1,240 × 1,754 (2.93 MB)) - 10:57, 22 July 2020
  • File:WP03 Building organisation 2jun 16.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    ld e r T A key partners C lu ste r P ro c e ss S te p code 1 2 12 1 1 1 1 1 1 1 1 1 1 Narrative Similar to process C. this process establishes a
    (1,239 × 1,754 (1.31 MB)) - 10:59, 22 July 2020
  • File:BGIF07 World Fish - Ecopond Project - Women-Headed Small Household Ponds 28Dec2015.pdf (category File used in Section H: Innovation Fund) (matches file content)
    the fish belongs in 1 sqm diagram of a cross section of a pond, showing various levels. This pond cross-section has been used throughout the entire PAR process
    (1,275 × 1,650 (4.3 MB)) - 10:57, 22 July 2020
  • File:BGIF05 CDI WUR - Opportunities for development of the Moringa sector Jul2015.pdf (category File used in Section H: Innovation Fund) (matches file content)
    Leader, C-4 Investment Specialist, C-4 Deputy Component Leader, C-3 Business Development Coordinator, C-4 Business Development Coordinator, C-4 Agriculturist
    (1,240 × 1,753 (1.54 MB)) - 10:58, 22 July 2020
  • File:BGIF14 FHRC - Pilot Community Based Water Management P43 2 and P29 Sep2017.pdf (category File used in Section H: Innovation Fund) (matches file content)
    ig a tio n R e s o u rc e s c a r c ity 3 . H o u s e h o ld c e n s u s nn - e co re s a n c l a is o c ia s ey rv su C o m m u n it y o r g a n is
    (1,240 × 1,754 (3.57 MB)) - 10:57, 22 July 2020
  • File:BGIF28 BSMRAU P2 Pen Culture mar 18.pdf (category File used in Section H: Innovation Fund) (matches file content)
    5. Results 5.1 Chaler beel (Degur beel WMG) 90 35 80 34 Temperature ( C) Water depth (cm) At the time of fish stocking (31 July 2017), average water
    (1,275 × 1,650 (1.58 MB)) - 10:57, 22 July 2020
  • File:BGIF01 IWM - Planning design and monitoring of community based WM systems in P30 .Jan2014.pdf (category File used in Section H: Innovation Fund) (matches file content)
    12Ø@200c/c 12Ø@200c/c 12Ø@200c/c 200 12Ø@250c/c 12Ø@250c/c 12Ø@150c/c 12Ø@250c/c 12Ø@200c/c 12Ø@250c/c 12Ø@250c/c 100mm CC (1:3:6) 12Ø@250c/c 12Ø@250c/c
    (1,240 × 1,754 (5.15 MB)) - 10:58, 22 July 2020
  • File:TR25 Outcomes report WMG survey 2018 29oct 18.pdf (category File used in Section G: Project Management) (matches file content)
    higher increase in c.i. Both sources of data show that polder 30 only had a small increase in c.i. and here 45% of WMG reported a decline in c.i. with another
    (1,240 × 1,754 (1.76 MB)) - 10:37, 22 July 2020
  • File:BGIF24 Moringa Ltd - Moringa Business Plan 11feb 18.pdf (category File used in Section H: Innovation Fund) (matches file content)
    Avenue 6, Pallabi, Dhaka - 1216 Factory: Shoilakupa, Jhenaidah, Gaibandha c. The project : Private Limited Company registered into the Joint Stock Company
    (1,240 × 1,753 (1.43 MB)) - 10:57, 22 July 2020
  • File:GoB WARPO Bangladesh Water Act 2013 (English).pdf (matches file content)
    plan approved by the Council under section 15; (9) “Executive Committee” means the committee constituted under section 9; (10) “control” shall also include
    (1,240 × 1,754 (432 KB)) - 05:48, 28 June 2020
  • File:BGIF17 No9 - Promoting Dutch SME entrepreneurship 23oct 17.pdf (category File used in Section H: Innovation Fund) (matches file content)
    9 B)​ ​Sector 10 C)​ ​Job​ ​titles 10 D)​ ​Gender 11 4.​ ​Looking​ ​ahead 11 A)​ ​Lessons​ ​learned B)​ ​Recommendations C)​ ​Next​ ​steps 5.​
    (1,241 × 1,756 (1.28 MB)) - 10:57, 22 July 2020
  • File:BGIF03 IMARES WUR Quickscan Freswater Pearl Culture Feasibility 21jan 15.pdf (category File used in Section H: Innovation Fund) (matches file content)
    T, Buschmann A.H., Halling C., Troell M., Kautsky N., Neori A., Kraemer G.P., Zertuche-Gonzalez J.A., Yarish C. and Neefus C. (2001). Integrating seaweeds
    (1,240 × 1,754 (569 KB)) - 10:58, 22 July 2020
  • File:BGIF11 Deltares - Water App tool for water management decision making in P43 2B Jan2017.pdf (category File used in Section H: Innovation Fund) (matches file content)
    Patuakhali BMD station (Figure 2) varies from 29°C (January) to 36°C (April) and minimum from 10.3°C (January) to 24°C (August). Figure 7.2 Average maximum and
    (1,240 × 1,754 (5.39 MB)) - 10:57, 22 July 2020
  • File:BGIF09 nhc FRERMIP - Final report Emergency protection works P29 23jun 18.pdf (category File used in Section H: Innovation Fund) (matches file content)
    issues of hard point designs described in section 4.2. Figure 5.2-4 Design of emergency works at location C P29 emergency interventions 26 v5 – 30th
    (1,240 × 1,754 (7.01 MB)) - 10:57, 22 July 2020
  • File:BGIF13 MarGen - Promoting Natural Cold Store mar 17.pdf (category File used in Section H: Innovation Fund) (matches file content)
    annual average temperature of 26.3 °C (79.3 °F) and monthly means varying between 12.4 °C (54.3 °F) in January and 34.3 °C (93.7 °F) in May. Feasibility
    (1,240 × 1,753 (3.71 MB)) - 10:57, 22 July 2020
  • File:TM Field Manual BGP PWM Eng 1feb 17.pdf (matches file content)
    on.  PWM Field Manual 1 1 February 2017       Work Process This section describes the main steps for establishing participatory water management in the polder 
    (1,239 × 1,754 (292 KB)) - 09:58, 2 July 2020
  • File:TNR int5 Training Report AIWW water policy 6dec 15.pdf (matches file content)
    Objects and systems Function, Risks and Costs 2. Life Cycle Costs a. b. c. Investments Operation and maintenance Risks 3. Life Cycle Designing a. b
    (1,239 × 1,754 (5.25 MB)) - 05:00, 6 May 2021
  • File:C-9.2 Water and Land Use Workshop P 55-2C.pdf
    Workshop Report on Water and Land Use Planning Polder-55/2C
    (1,240 × 1,754 (4.77 MB)) - 05:52, 20 April 2021
  • File:WP5 - Theory of Change rev 2 25may 16.pdf (category File used in Section A: Background and context) (matches file content)
    Geert Rhebergen, Guy Jones Shital Das and Proteeti Masud First full ToC WP Niels van den Berge This document is issued for the party which commissioned
    (1,240 × 1,754 (3.13 MB)) - 03:56, 24 November 2020
  • File:TR29 outcomes report 2021 11nov 21.pdf (matches file content)
    WMGs had an increase in c.i.,. Significant numbers of WMG reported decreases in c.i. in polders 28/2 (50%), 43/2A (25%), 55/2C (25%), 43/2E (17%), and
    (1,240 × 1,754 (4.6 MB)) - 08:27, 15 December 2021
  • File:B-5.3 PDP Polder 22 April 23, 2014.pdf (matches file content)
    22 Org’l Mgt. Cat Cat C B - - Cat A - O&M Cat B 3 Cat C - Cat A 4 Cooperative Cat Cat C B - - Conflict Mgt. Cat Cat C B Cat A 4 - - Average
    (1,240 × 1,754 (3.51 MB)) - 10:57, 19 April 2021
  • File:BGIF16 Aspire-Insectsforall - Fish Feed using Insect Larvae 1nov 17.pdf (category File used in Section H: Innovation Fund) (matches file content)
    developing the technology, the focus of this section will be the decentralised model (discussed in section 6). A sound business case for the decentralised
    (1,239 × 1,754 (902 KB)) - 10:57, 22 July 2020
  • File:ARM Aide Memoire 25Nov-4Dec 2017 26feb 18.pdf (category File used in Section G: Project Management) (matches file content)
    the impact on labour demand, labour wages and tenure arrangements (see section 3.5). This will support the understanding and upscaling of the improved
    (1,240 × 1,754 (1.43 MB)) - 10:54, 22 July 2020
  • File:WP09H 30oct 19 WP9H WMG Tracker FINAL Report jun 19.pdf (category File used in Section G: Project Management) (matches file content)
    Farmgate, Dhaka-1215 (M) +88 01534006158 Blue Gold Office 148 Motijheel C/A, BCIC Building (new) 4th Floor Motijheel, Dhaka-1000 (T) +88 02 951 28 23
    (1,240 × 1,754 (1.91 MB)) - 10:37, 22 July 2020
  • File:PR Jan-Mar 2014 14may 14.pdf (category File used in Section G: Project Management) (matches file content)
    Cooperative Officer b) Upazila Cooperative Officer c) District Inspector Resource persons from DoC at the district and Upazila level were invited during
    (1,240 × 1,754 (1.89 MB)) - 10:40, 22 July 2020
  • File:OT Hague Academy Multi-level Water Governance 26Oct-6Nov2015.pdf (category File used in Section G: Project Management) (matches file content)
    main topics and learning points covered by the course are summarized in Section 2. TNR1_Multi-level Water Governance 3 V2 – 03 December 2015 Blue Gold
    (1,240 × 1,754 (868 KB)) - 04:57, 6 May 2021
  • File:TM Field Manual BGP PWM Bangla 28feb 17.pdf (matches file content)
    Kivt Dc‡ii av‡c eøy ‡Mvì c×wZ‡K we`¨gvb †h․_ Kvh©µ‡gi mv‡_ mshy³ Kivi ci GLb cÖwµqvwU A`~i fwel¨‡Zi my‡hvM wPwýZKiY Ges Kv‡R jvMv‡bvi c‡_ AMÖmi n‡e| GB
    (1,240 × 1,754 (758 KB)) - 09:56, 2 July 2020
  • File:Bengali-agricultural-calendar.pdf (matches file content)
    clockwise T. tu m ce Bo if I ar M Ash October ve De Ch Kh h c ar No shin r be em pt Se April oitro u (A y h I if I ot Ma
    (2,480 × 1,753 (109 KB)) - 11:47, 21 November 2021
  • File:PR jul dec 2017 BGP HYPR July-Dec 2017.pdf (category File used in Section G: Project Management) (matches file content)
    This Re por t has be en p rep are d solely for use by t he p arty w hich c om mission ed it (the 'Client') i n co nnecti on wit h the cap tione d p roject
    (1,240 × 1,754 (1.89 MB)) - 10:41, 22 July 2020
  • File:TR24 2018 2019 CAWM Strategic Plan 16sep 18.pdf (matches file content)
    (2018-2019) Project budget C06 INFRASTRUCTURE Infrastructural improvements Sites No. sessions 50 AGRICULTURE C07 C07 T02 T04 T04 T07 C09 1 100,000 5,000
    (1,240 × 1,754 (1.1 MB)) - 02:06, 12 July 2020
  • File:PR 28jul 20 HYPR January-June 2020.pdf (category File used in Section G: Project Management) (matches file content)
    ...... B-1 Annex C: Reports and videos ........................................................................................... C-1 HYPR January-June
    (1,240 × 1,754 (1.52 MB)) - 16:52, 10 December 2020
  • File:BGIF31 1jun 20 PCR Sustaining Sack Farming Practices Practical Action.pdf (category File used in Section H: Innovation Fund) (matches file content)
    viability through judicious use of watering. 3.1 SPECIFIC ACTIVITIES In this section we detail out all the major activities carried out under the project to
    (1,240 × 1,753 (18.16 MB)) - 19:49, 9 December 2020
  • File:BGIF33 17aug 20 FINAL PROJECT REPORT BG CAMASMA CIMMYT BD.pdf (category File used in Section H: Innovation Fund) (matches file content)
    53. Gulshan-2. Dhaka, 1213, Bangladesh Contributors: T.J. Krupnik, F. Khan, C. Montes, I. Siddiquee, H. Nath, RK Morshed, K. Hossain, M. Billah, T.S. Amjath
    (1,275 × 1,650 (2.06 MB)) - 19:54, 9 December 2020
  • File:B-3 ToT on CM&QC 2014.pdf (matches file content)
    01717459787 01716060769 SocioEconomist SocioEconomist Civil Engineer Q. C. Engineer Q. C. Engineer Sub Asst. Engineer CO CO CO Blue Gold, Patuakhali 01822-807827
    (1,275 × 1,650 (597 KB)) - 10:52, 19 April 2021
  • File:BGIF00 Twynstra&Gudde - study of WMOs as cooperatives.pdf (category File used in Section H: Innovation Fund) (matches file content)
    more detail and these will be strengthened to fulfil these responsibilities. c) The WMG’s and their associations have established effective partnerships
    (1,275 × 1,650 (762 KB)) - 10:58, 22 July 2020
  • File:Gender 15apr 18 Report IFMC Gender Activities Review.pdf (matches file content)
    review (section 2), analyses the gender strategy (section 3), presents findings on how gender equality is addressed in project implementation (section 4),
    (1,275 × 1,650 (1.22 MB)) - 16:37, 3 November 2021
  • File:BGIF12 MetaMeta - Roads for Water Management and Flood Protection Nov2017.pdf (category File used in Section H: Innovation Fund) (matches file content)
    high areas) while reducing drainage congestion and waterlogging in lowlands. (c) Re-excavate khals to reconnect drainage ways and retain more water for multiple
    (1,753 × 1,240 (24.68 MB)) - 10:57, 22 July 2020
  • File:BGIF15 Just Farming - Increasing Quality in Mungbean Production 23oct 17.pdf (category File used in Section H: Innovation Fund) (matches file content)
    branding of the company and its products. This will result in a B2B and B2C brand in the future. Most importantly, Just Farming will focus less on building
    (1,239 × 1,754 (640 KB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19.pdf (category File used in Section G: Project Management) (matches file content)
    80% of WMGs report an increase in c.i., 11% no change and 8% decrease. The proportion of WMGs with an increase in c.i. was highest in Satkhira at 92% and
    (1,240 × 1,754 (1.86 MB)) - 10:37, 22 July 2020
  • File:Research 2014 Imposition of Participation dewan buisson mukherji.pdf (matches file content)
    www.water-alternatives.org Volume 7 | Issue 2 Dewan, C.; Buisson, M.-C. and Mukherji, A. 2014. The imposition of participation? The case of participatory
    (1,240 × 1,754 (921 KB)) - 19:40, 16 December 2020
  • File:BGIF04 Groenemeijer WUR - Baseline P30 Community Water Management Pilot 28feb 15.pdf (category Files not used by any section) (matches file content)
    Figure 5, Southern section of internal drain Figure 6, Northern section of internal drain 12 Figure 7, Culvert at the Northern section of internal drain
    (1,240 × 1,754 (6.13 MB)) - 07:05, 12 July 2020
  • File:BGIF18 Consiglieri - Renewable Energy-Based Solutions 8aug 16.pdf (category File used in Section H: Innovation Fund) (matches file content)
    Screening by Environmental and Policy criteria iv. Screening by Financial criteria c. Shortlisting technologies for feasibility analysis 2. Technology Feasibility
    (1,275 × 1,650 (2.37 MB)) - 10:57, 22 July 2020
  • File:F-2 Refrshers training on Improved Water Magmt for COs-May 5-7 & 10-12, 2015.pdf (matches file content)
    will be submit in 25/05/15 Do Do Do Do Do Do Discontinued of Bank A/C No Bank A/C do do do do do Basurabad Baguladangha Kashiardangha KathamaryGhupalkhali
    (1,240 × 1,754 (1.78 MB)) - 19:08, 20 April 2021
  • File:P29 Lower Bhadra IWM river survey report 23jul 17.pdf (matches file content)
    Track: 13-May 2509000 Se c Se c ¯ Legend ... ... ... ... Se c Float Track: 14-May Bank Line Se c Se c Se c Se c Runlines Se c (-8.0) to (-6.0) (-6
    (1,275 × 1,650 (8.99 MB)) - 19:46, 8 July 2020
  • File:TR20 2016 17 CAWM Strategic Plan 22 Sep 16.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    The next sections make a distinction between the institutions and staff who are expected to take the lead and execute the core activities (section 6.3), and
    (1,239 × 1,754 (1.25 MB)) - 10:59, 22 July 2020
  • File:P29 BWDB design drawings groynes 1nov 16.pdf (matches file content)
    010@75C/C -- -- 020 SPACER FORKS @ 1200 C/C -4-016 010 LINK @ 1200 C/C r ~ L >-( -- - - 010@90C/C 010 @ 150 C/C SECTION X-X SECTION -- y-y
    (1,770 × 1,297 (4.69 MB)) - 19:34, 8 July 2020
  • File:TR23 Phase II Socio-Economic Baseline Survey 31may 18.pdf (category File used in Section G: Project Management) (matches file content)
    Indicator C_2: Area (ha) affected by poor drainage / waterlogging পচরমাপক C_2: দুবেয রনষ্কােন/জোবদ্ধিাি কািনি ক্ষরিগ্রস্থ জরিি পসর োণ (শহক্টি) C5 Did any
    (1,275 × 1,650 (5.24 MB)) - 10:37, 22 July 2020
  • File:BGIF30 MetaMeta-JJS-AA Horizontal Learning Evaluation Report 17feb 20.pdf (category File used in Section H: Innovation Fund) (matches file content)
    staff. Award ceremony for the video competition in Polder 43/2D (Patuakhali) c) Online: A significant number of people were reached through videos and other
    (1,240 × 1,754 (2.35 MB)) - 10:57, 22 July 2020
  • File:EIA Report Polder 55 2C aug 20.pdf (category File used in Section G: Project Management)
    EIA Report - Polder 55/2C EIA Report Polder 55_2C aug_20.pdf
    (1,240 × 1,754 (8.87 MB)) - 20:29, 9 December 2020
  • File:P29 IWM Lower Bhadra Survey Report 3rd Cycle nov 17.pdf (matches file content)
    2017 Se c_ 62 Se c_ 61 Se c_ 60 Se c_ 59 Se c_ 58 Se c_ 57 Se c_ 56 S Se ec_ c 5 S _5 5 Se ec_ 4.5 c_ 54 5 Se Sec 3.5 c_ _5 3 5 Se Sec 2.5 c_ _5 2 S 5
    (1,240 × 1,754 (14.29 MB)) - 19:52, 8 July 2020
  • File:GoB BWDB Act 2000 (english translation).pdf (matches file content)
    the activities stated in Section 6. (2). Without impairing the generality of the power and authority given under sub-section (1), the Board shall exercise
    (1,239 × 1,754 (54 KB)) - 05:18, 28 June 2020
  • File:WP08C participatory monitoring oct nov 2017 5apr 18.pdf (category File used in Section D: Participatory Water Management)
    WP8C: Participatory Monitoring Oct-Nov 2017 WP08D
    (1,240 × 1,754 (1.56 MB)) - 10:59, 22 July 2020
  • File:AWP 2014 blue-gold-annual-plan-2014.pdf (category File used in Section G: Project Management) (matches file content)
    GT C1 staff with support of TT and GT C1, C2 and TT, with some GT follow-up / support x x x Throughout program. C1 and C2 x x x By C3 and C4, with
    (1,240 × 1,754 (4.84 MB)) - 10:54, 22 July 2020
  • File:AWP 2016 AnnualPlan201617V2.pdf (category File used in Section G: Project Management) (matches file content)
    Embankment: 3.900Km re-sectioning work completed. 3.540 km embankment re-sectioning work is ongoing. 14.90km embankment re-sectioning work have been planned
    (1,240 × 1,754 (9.75 MB)) - 10:53, 22 July 2020
  • File:PP TA ARM position paper 2017 18nov 17.pdf (matches file content)
    KZ„©c‡¶i AbygwZ mv‡c‡¶ e¨envi Ki‡Z cvi‡e| 7| cÖK‡íi Aaxb¯’ grm¨ Pvl Dc‡hvMx Rjvk‡q cvwb PjvP‡j †Kvbiƒc evav weNœ bv NwU‡q 2q c¶ 1g c‡¶i m¤§wZ mv‡c‡¶ wewa
    (1,240 × 1,754 (9.32 MB)) - 09:45, 2 July 2020
  • File:AWP 2018 19 Annual Work Plan 2018-2019 1aug 18.pdf (category File used in Section G: Project Management) (matches file content)
    August 2018 Blue Gold Program Maintenance Planning Process 6.a 6.b 6.c 7 8 9 C 8 D Practical Training on Gate Operation for Gatekeepers (half day)
    (1,240 × 1,754 (2.84 MB)) - 10:53, 22 July 2020
  • File:AWP 2015 16 Annual Work Plan 2015 - 2016 14 July 2015.pdf (category File used in Section G: Project Management) (matches file content)
    46.3 Khulna Producer Groups Tentative dates Joint activity C3 & C4 Joint activity C3 & C4 224 46.6 Follow up on sesame producer groups MFS module backyard
    (1,240 × 1,754 (4.77 MB)) - 10:54, 22 July 2020
  • File:EIA P43 2E CEGIS Apr 16.pdf (category File used in Section G: Project Management) (matches file content)
    ranges from 29°C (January) to 36°C (April). Significant fluctuations in average minimum temperatures have been observed, which varies from 10.3°C (January)
    (1,240 × 1,754 (9.99 MB)) - 10:49, 22 July 2020
  • File:P29 Deltares review of BWDB designs 30may 17.pdf (matches file content)
    sampling B.8 Drilling B-1 B-1 B-1 B-1 B-2 B-2 B-2 B-3 B-3 C Mission report 23-25 April 2017 C-1 Review of BWDB designs for river bank erosion management
    (1,240 × 1,754 (1.53 MB)) - 18:29, 8 July 2020
  • File:EIA P43 2B CEGIS Apr 16.pdf (category File used in Section G: Project Management) (matches file content)
    temperature varies from 29°C (January) to around 36°C (April) and minimum temperature varies from 10.3°C (January) to 24°C (August).The maximum rainfall
    (1,240 × 1,754 (14.46 MB)) - 10:49, 22 July 2020
  • File:EIA P30 CEGIS Sep 15.pdf (category File used in Section G: Project Management) (matches file content)
    maximum temperature varies from 19.3°C to 30.4°C and monthly minimum temperature varies within the range of 15.37°C to 25.2°C. The maximum rainfall ever recorded
    (1,240 × 1,754 (14.5 MB)) - 10:49, 22 July 2020
  • File:AWP 2017 18 BGPAnnualPlan20172018.pdf (category File used in Section G: Project Management) (matches file content)
    field operation. Accordingly, T&C Team also changed it strategy and approach for effective support service to the project. T&C Team provided support to BGP
    (1,240 × 1,754 (6.78 MB)) - 10:53, 22 July 2020
  • File:EIA P34-2 jan 20.pdf (category File used in Section G: Project Management) (matches file content)
    maximum temperature varies from 19.3°C to 30.4°C and monthly minimum temperature varies within the range of 15.37°C to 25.2°C. The maximum rainfall ever recorded
    (1,240 × 1,754 (9.2 MB)) - 20:20, 9 December 2020
  • File:EIA P29 CEGIS Jun 16.pdf (matches file content)
    Mimisaceae C 2 T Rutaceae C 1 T Dumur( Ficus religiosa) Moraceae C 2 S Mahogany mahagoni) Meliaceae C 2 T Malvaceae C 4 T Mimosaceae
    (1,240 × 1,754 (20.54 MB)) - 11:20, 1 July 2020
  • File:EIA P31 part CEGIS Jun 16.pdf (category File used in Section G: Project Management) (matches file content)
    temperature ranges from 19.3°C (January) to around 30.4°C (April) while average minimum temperatures varies from 15.37°C (January) to 25.2°C (August). The maximum
    (1,240 × 1,754 (33.56 MB)) - 10:48, 22 July 2020
  • File:EIA P28-2 jan 20.pdf (category File used in Section G: Project Management) (matches file content)
    Cr Cr Vu Vu Vu En Vu IUCN Status C En Vu Vu Cr En En C C C En Vu Vu C C En Vu - Source: Field Survey, 2017; Here- C-common, Vu- Vulnerable, En- Endangered
    (1,240 × 1,754 (8.64 MB)) - 20:16, 9 December 2020
  • File:22dec 20 bgp-sswmi-guidelines-v1.4.4-reduced.pdf (matches file content)
    @ 150mm c/c 10mm Ø @ 200mm c/c REINFORCEMENT DETAIL FOR TOP SLAB Slab Thickness=150mm 12mm Ø @ 100mm c/c At Alt. Ckd. 10mm Ø @ 150mm c/c 1-10mm Ø
    (1,240 × 1,753 (6.3 MB)) - 07:37, 18 March 2021
  • File:EIA P22 CEGIS Sep 15.pdf (category File used in Section G: Project Management) (matches file content)
    maximum temperature varies from 19.3°C to 30.4°C and monthly minimum temperature varies within the range of 15.37°C to 25.2°C. The maximum rainfall ever recorded
    (1,240 × 1,754 (12.37 MB)) - 10:49, 22 July 2020
  • File:WP08F report on Participatory Monitoring Apr 2019 v1 10jul 19.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    Selfassessm ent by WMGs D E C D C C C C C D D E D B B C D B C Polder Team’s Assessment (indicated where it differs) D C B C D C April 2019 Blue Gold Program
    (1,240 × 1,754 (2.07 MB)) - 10:59, 22 July 2020
  • File:EIA P2 CEGIS Jun 16.pdf (category File used in Section G: Project Management) (matches file content)
    Cr Cr Vu Vu Vu En Vu IUCN Status C En Vu Vu Cr En En C C C En Vu Vu C C En Vu - Source: Field Survey, 2015; Here- C-common, Vu- Vulnerable, En- Endangered
    (1,240 × 1,754 (9.51 MB)) - 10:53, 22 July 2020
  • File:EIA P43 2F CEGIS Jun 15.pdf (category File used in Section G: Project Management) (matches file content)
    maximum temperature varies from 29°C to 36°C and monthly minimum temperature varies within the range of 10.3°C to 24°C. The maximum rainfall ever recorded
    (1,240 × 1,754 (15.27 MB)) - 10:49, 22 July 2020
  • File:WP10A WMA Participatory Monitoring May 2019 5aug 19.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    Participatory Monitoring at WMA level Grade Polder Team’s assessment E C D B E B D C C 5 August 2019 10 Blue Gold Program Fig. 4.1.1 Hethalia-Charabunia
    (1,240 × 1,754 (11.83 MB)) - 10:59, 22 July 2020
  • File:O&M Guideline v5 5jan 18.pdf (matches file content)
    Routine b) Periodic c) Emergency a) Routine b) Periodic c) Emergency a) Routine b) Periodic c) Emergency a) Routine b) Periodic c) Emergency WMG / WMA
    (1,240 × 1,754 (6.6 MB)) - 16:24, 10 December 2020
  • File:EIA P43 1A CEGIS Apr 16.pdf (category File used in Section G: Project Management) (matches file content)
    temperature varies from 29°C (January) to around 36°C (April) and minimum temperature within the varies from 10.3°C (January) to 24°C (August).The maximum rainfall
    (1,240 × 1,754 (12.93 MB)) - 10:49, 22 July 2020
  • File:EIA P28-1 jan 20.pdf (category File used in Section G: Project Management) (matches file content)
    Rhamnaceae Gramineae VC C C C VC C VC 2 1 1 1 2 2 1 Tall monocot T T T T H T CL Mimisaceae C 2 T Rutaceae C 1 T Meliaceae C 2 T Khai Babla (Pithecolobium
    (1,240 × 1,754 (8.95 MB)) - 20:15, 9 December 2020
  • File:WP08D Report on Participatory Monitoring Apr-May 2018 v1 24jul 18.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    ent by WMGs (indicated where it differs) B C B - C - C - B - A - B - B - C B B C C B C B B - 12 July 2018 40 Blue Gold Program
    (1,240 × 1,754 (2.04 MB)) - 10:59, 22 July 2020
  • File:TN06 Sajna (Moringa Oleifera) Cuttings 23dec 15.pdf (category Files not used by any section) (matches file content)
    Content Sajna Other food Vitamin A 6,780 mg Carrot: 1,890 mg Vitamin C 220 mg Orange: 30 mg Calcium 440 mg Cow milk: 120 mg Potassium 259 mg
    (1,239 × 1,754 (480 KB)) - 10:11, 2 July 2020
  • File:EIA Report Polder 25 aug 20.pdf (category File used in Section G: Project Management) (matches file content)
    Aam(Mangifera indica) Anacardiaceae C 1 T Jam (Syzygium sp) Myrtaceae C 1 T Kola (Musa sp) Musaceae C 2 H Safeda(Manilkara zapota) Tulshi(Ocimum
    (1,240 × 1,754 (10.03 MB)) - 20:23, 9 December 2020
  • File:WP08A participatory monitoring red 28feb 17.pdf (category File used in Section E: Agricultural Development) (matches file content)
    er�management�partnership,�� (b)�agriculture�and�economic�development,�� (c)�community�participation�in�planning�and�implementation�of�water�management�infrastructures
    (1,239 × 1,754 (5.98 MB)) - 04:46, 28 July 2020
  • File:EIA P27 jan 20.pdf (category File used in Section G: Project Management) (matches file content)
    Mahogany (Swietenia mahagoni) Myrtaceae Musaceae Rhamnaceae Gramineae C C C C 1 2 2 1 T H T CL thatching Fruit Fencing and Medicine Fencing Fruit and
    (1,240 × 1,754 (8.04 MB)) - 20:12, 9 December 2020
  • File:WP10B WMA Participatory Monitoring Oct 2019 23dec 19 opt.pdf (category File used in Section E: Agricultural Development) (matches file content)
    Performance grade D 2 WMAs Performance grade C 5 WMAs Performance grade A 16 WMAs Performance grade C 4 WMAs Performance grade B 11 WMAs Performance
    (1,240 × 1,754 (12.09 MB)) - 04:46, 28 July 2020
  • File:EIA P26 CEGIS Jun 16.pdf (matches file content)
    Anacardiaceae C 1 T Jam (Syzygium sp) Myrtaceae C 1 T Kola (Musa sp) Musaceae C 2 H Rhamnaceae C 2 T Gramineae C 1 Mimisaceae C Rutaceae
    (1,240 × 1,754 (51.83 MB)) - 09:54, 30 June 2020
  • File:EIA P43 2A CEGIS Jun 15.pdf (category File used in Section G: Project Management) (matches file content)
    around 27°C (January) to around 36°C (April). Significant fluctuations in average minimum temperatures have been found, which vary from 12°C (January)
    (1,240 × 1,754 (15.37 MB)) - 10:48, 22 July 2020
  • File:AWP 2015 Annual Plan 2015 v5 241214.pdf (category File used in Section G: Project Management) (matches file content)
    Description of items Type Participants C-2 Construction Management for LCS (01 day) Training Module LCS Members C-2 Construction Management & Quality
    (1,240 × 1,754 (6.3 MB)) - 10:53, 22 July 2020
  • File:EIA Report Polder 47 3 aug 20.pdf (category File used in Section G: Project Management) (matches file content)
    around 29°C (January) to around 36°C (April). Significant fluctuations in average minimum temperatures have been found, which varies from 10.3°C (January)
    (1,240 × 1,754 (7.4 MB)) - 20:26, 9 December 2020
  • File:EIA P55 2A jan 20.pdf (category File used in Section G: Project Management) (matches file content)
    around 29°C (January) to around 36°C (April). Significant fluctuations in average minimum temperatures have been found, which varies from 10.3°C (January)
    (1,240 × 1,754 (6.86 MB)) - 20:21, 9 December 2020
  • File:EIA P43 2D CEGIS Jun 15.pdf (category File used in Section G: Project Management) (matches file content)
    around 29°C (January) to around 36°C (April). Significant fluctuations in average minimum temperatures have been found, which varies from 10.3°C (January)
    (1,240 × 1,753 (16.63 MB)) - 10:49, 22 July 2020
  • File:EIA Report Polder 47-4 aug 20.pdf (category File used in Section G: Project Management) (matches file content)
    around 29°C (January) to around 36°C (April). Significant fluctuations in average minimum temperatures have been found, which varies from 10.3°C (January)
    (1,240 × 1,754 (7.75 MB)) - 20:27, 9 December 2020
  • File:BGIF19 Practical Action - Floating Cage Aquageoponics 8dec 17.pdf (category File used in Section H: Innovation Fund) (matches file content)
    92 7.06 6.95 7.15 DEC-16 JAN-17 FEB-17 OCT-16 NOV-16 Temperature °C 27.03 25.41 21.56 PH Figure 17: Temperature and pH in canal, pH didn’t
    (1,240 × 1,754 (2.26 MB)) - 10:57, 22 July 2020
  • File:AWP 2019 20 Annual Work Plan 2019-2020 10jul 19.pdf (category File used in Section G: Project Management) (matches file content)
    37 km c/o work 404.53 km 131 nos. 81 nos. new & 50 nos. c/o 6 nos. 6 nos. new work 24 nos. new work & 6 nos. c/o work 3 nos. new work & 3 nos. c/o work
    (1,275 × 1,650 (3.06 MB)) - 10:53, 22 July 2020
  • File:WP7 Polder Growth & Business Development.KtJ 31aug 16.pdf (category File used in Section E: Agricultural Development) (matches file content)
    Mott Mac cDonald is committed to integrating sustainability s y into our operational practices aand culture. As a world d leading consultancy c business
    (1,239 × 1,754 (1.39 MB)) - 19:45, 16 December 2020
  • File:16jan 19 LCS Guiding Note BANGLA.pdf (matches file content)
    Memoire Section 3.5) 1. GjwmGm Gi gva¨‡g gvwU KvUvi Rb¨ wbe©vnx cÖ‡KŠkjx Ges cvwb e¨e¯’vcbv `‡ji g‡a¨ Pzw³ m¤úv`‡bi c~‡e© wbe©vnx cÖ‡KŠkjx KZ©„K cÖK‡íi civgk©K
    (1,240 × 1,753 (245 KB)) - 08:34, 11 May 2021
  • File:WP02A Exit Strategy feb 16 v2.pdf (category File used in Section G: Project Management) (matches file content)
    a tree today! Mott Mac cDonald is committed c to integrating ssustainability y into our operational praactices and culture. c As a world lead ding consulta
    (1,239 × 1,754 (562 KB)) - 03:59, 24 November 2020
  • File:WP04 Vocational Training 23aug 16.pdf (category File used in Section G: Project Management) (matches file content)
    proposed strategies and actions. These mismatches were in the area of a. b. c. d. flexibility to offer courses at polder level and not just at divisional
    (1,240 × 1,754 (1.87 MB)) - 10:37, 22 July 2020
  • File:16jan 19 LCS Guiding Note ENGLISH.pdf (matches file content)
    groups and its implementation (This note addresses 2018 ARM Aide Memoire Section 3.5) 1 Before signing of LCS contract between Executive Engineer and Water
    (1,240 × 1,753 (243 KB)) - 08:36, 11 May 2021
  • File:ARM Aide Memoire 9-20Nov 2018 11jan 19.pdf (category File used in Section G: Project Management) (matches file content)
    of the reviews and the recommendations. Section 2 brings the highlight on the impact and progress of BGP. Section 3 discusses the main operational areas
    (1,240 × 1,754 (1.2 MB)) - 10:54, 22 July 2020
  • File:WP09D WMG Tracker Report up to JUNE 2018 v4 27 08 2018 SKD.pdf (category File used in Section G: Project Management) (matches file content)
    activities centre around: (a) Economic Development, (b) Water Management, (c) Organizational Management and (d) Capacity Development. Table 1: Achievement
    (1,240 × 1,754 (2.21 MB)) - 10:37, 22 July 2020
  • File:MF P43 2A master file 26apr 15.pdf (category File used in Section G: Project Management) (matches file content)
    climate. Maximum temperature of this district is 33.3°C and appears in the month of May, minimum 12.1°C appears usually in January. Annual rainfall is 2506
    (1,275 × 1,650 (2.51 MB)) - 13:35, 20 April 2021
  • File:MF P22 master file 15jun 14.pdf (category File used in Section G: Project Management) (matches file content)
    16 16 16 17 17 17 17 18 Vi vii viii Ix X c. i. ii. iii. iv. v. B. I Ii Iii iv 4. 4.a 4.b 4.c 5. 6. a. b. c. d. 7. 8. 8.1 8.2 9. 10. 11. 12. Farmers Category
    (1,240 × 1,754 (2.11 MB)) - 13:28, 20 April 2021
  • File:O&M Agreement Signing Ceremony Satkhira.pdf (matches file content)
    2017. b) Crop Production is increased in agricultural land under CAWM by BGP. c) Cultivation of HYV, Summer Tomato and Vegetables in the yard have increased
    (1,240 × 1,753 (3.1 MB)) - 06:02, 21 April 2021
  • File:ARM Aide Memoire 23Aug-5Sep 2014.pdf (category Files not used by any section) (matches file content)
    concern: - Section 1: Blue Gold Program Objectives Section 2: Overall Progress Section 3: Blue Gold Activities Section 4: Project organization Section 5: Reflections
    (1,240 × 1,753 (1.05 MB)) - 10:04, 13 April 2020
  • File:CAWM 26mar 20 gajendrapur design report.pdf (matches file content)
    determined as follows: Allowable flow velocity (m/s) = V basic * A*B*C*D. Where Vbasic A B C D = = = = = Basic velocity Correction factor for void ratio Correction
    (1,240 × 1,754 (3.72 MB)) - 20:00, 9 December 2020
  • File:BGIF08 Acacia - Feasibility study Aquifer Recharge for Agriculture 25feb 15.pdf (category File used in Section H: Innovation Fund) (matches file content)
    of Bangladesh during 2009-2014 action research program for UNICEF (see section 1.1). The project has shown that the MAR technique is feasible very useful
    (1,240 × 1,754 (1.6 MB)) - 10:57, 22 July 2020
  • File:EXT Agro-Insight report v13 3may 18.pdf (category File used in Section G: Project Management) (matches file content)
    Md. Shafiqul Islam In three sections A. Organisational related responsibilities B. Water management related responsibilities C. Agriculture and business-related
    (1,240 × 1,754 (2.15 MB)) - 10:49, 22 July 2020
  • File:WP09E WMG Tracker Report up to SEPT 2018 iss 26jan 19.pdf (category File used in Section G: Project Management) (matches file content)
    activities centre around: (a) Economic Development, (b) Water Management, (c) Organizational Management and (d) Capacity Development. Table 1: Achievement
    (1,240 × 1,754 (2.18 MB)) - 10:37, 22 July 2020
  • File:A1-1 Community Organization & Cooperatives Aug 25-30 2013.pdf (matches file content)
    need his/her presence in the community. C. Steps/ Process and Methods in Community Organizing This section deals with the how of organizing. It should
    (1,275 × 1,650 (1.25 MB)) - 07:28, 18 March 2021
  • File:WP09C WMG Tracker Report to MARCH 2018 v5 20 06 2018 SKD.pdf (category File used in Section G: Project Management)
    WP9C: WMG Tracker Report to March 2018 WP09C
    (1,240 × 1,754 (1.31 MB)) - 10:37, 22 July 2020
  • File:MF P31-part master file 6apr 15.pdf (category File used in Section G: Project Management) (matches file content)
    annual average temperature of 26.3 °C (79.4 °F) and monthly means varying between 12.4 °C (54.3 °F) in January and 34.3 °C (93.7 °F) in May. Annual average
    (1,240 × 1,754 (5.12 MB)) - 13:47, 20 April 2021
  • File:WP09G WMG Tracker Report up to MARCH 2019 v3 16 05 2019 SKD.pdf (category File used in Section G: Project Management) (matches file content)
    Farmgate, Dhaka-1215 (M) +88 01534006158 Blue Gold Office th 148 Motijheel C/A, BCIC Building (new) 4 Floor Motijheel, Dhaka-1000 (T) +88 02 951 28 23
    (1,240 × 1,754 (3.15 MB)) - 10:37, 22 July 2020
  • File:WP9A WMG Tracker Report without annexes to June 2017 23nov 17.pdf (category File used in Section G: Project Management) (matches file content)
    various activities related to: (a) Economic Development, (b) Water Management, (c) Organizational Management and (d) Capacity Development. Mostly positive results
    (1,240 × 1,754 (1.6 MB)) - 13:18, 20 April 2021
  • File:MF P26 master file 30sep 15.pdf (category File used in Section G: Project Management) (matches file content)
    annual average temperature of 26.3 °C (79.4 °F) and monthly means varying between 12.4 °C (54.3 °F) in January and 34.3 °C (93.7 °F) in May. Annual average
    (1,240 × 1,754 (2.1 MB)) - 13:25, 20 April 2021
  • File:2jun 20 LCS report Final Formatted.pdf (matches file content)
    are not formed in the BGP area. 8 GPWM, 2000; Part-1: section 4.5. PWMR, 2014; Chapter 2: section 3.3.8 and Chapter 7.18; Chapter 6. 9 LGED website: http://www
    (1,240 × 1,754 (1.54 MB)) - 11:52, 9 March 2021
  • File:P29 FRERMIP Final report Emergency protection works P29 v5 23jun 18.pdf (matches file content)
    issues of hard point designs described in section 4.2. Figure 5.2-4 Design of emergency works at location C P29 emergency interventions 26 v5 – 30th
    (1,240 × 1,754 (3.09 MB)) - 19:10, 8 July 2020
  • File:BGIF Call for Proposals - Funding Window 1.pdf (matches file content)
    In order to facilitate th he developme ent of these ssolutions, Blu e Gold has laaunched the C Call for Propo osals –  Funding W Window 1. , aallowing the  Blue Gold Inn
    (1,275 × 1,650 (229 KB)) - 04:31, 10 March 2021
  • File:TM fisheries FFS 16apr 19.pdf (category File used in Section G: Project Management) (matches file content)
    aviYv cÖ`vb Ges GdGdGm cwiwPwZ| DcKiY t †cv÷vi †ccvi, gvK©vi, Kjg, nvW© wK¬c, `wo/iwk, wd¬c PvU©, e¨vjU e·, euvwk w`e‡mi Kg©m~Px BZ¨vw`| cÖwk¶Y c×wZ t
    (1,240 × 1,687 (29.32 MB)) - 05:53, 25 June 2021
  • File:P29 FRERMIP visit 13 March2017 v3 11apr 17.pdf (matches file content)
    structured in three main sections: Section I Data Collection looks at the data needs for meaningful designs and monitoring. Section II Emergency Works discusses
    (1,239 × 1,754 (1,005 KB)) - 12:42, 8 July 2020
  • File:WP09F WMG Tracker Report to Dec 2018 iss 20feb 19 opt.pdf (category File used in Section G: Project Management) (matches file content)
    activities centre around: (a) Economic Development, (b) Water Management, (c) Organizational Management and (d) Capacity Development. Table 1: Progress
    (1,240 × 1,754 (2.96 MB)) - 10:37, 22 July 2020
  • File:17sep 20 Annual Work Plan 2020-21.pdf (matches file content)
    Embankment Re-sectioning 2.32 km c/o 2 Embankment Retirement 2.09 km c/o 3 Canal Re-excavation 4 Repair of Sluice 20 nos. new & 12 nos. c/o 5 Repair
    (1,275 × 1,650 (4.01 MB)) - 08:42, 11 May 2021
  • File:TR19 Mustard Value Chain Analysis 22feb 17.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    for Fertilizers in Tk. c Pest Management c.1 Insect killer (depends on insect attack) Insecticides c.2 c.3 Thiovit Fungicides c.4 Amister Top Sub-Total
    (1,240 × 1,754 (1.78 MB)) - 10:59, 22 July 2020
  • File:TN 04 Local Poultry Value chain Analysis.pdf (category File used in Section E: Agricultural Development) (matches file content)
    budget (increase outreach) -Support WMG members to use funds from the WMG S&C 23 -Initiate discussion with different MFI for creating collaboration and
    (1,240 × 1,754 (957 KB)) - 04:46, 28 July 2020
  • File:19dec 19 BGIF Lessons Learnt draft v3.pdf
    Original PDF report Section H innovation fund
    (1,240 × 1,754 (2.12 MB)) - 04:34, 23 February 2020
  • File:WP09B 11apr 18 WP9B WMG tracker to Dec 2017.pdf (category File used in Section G: Project Management) (matches file content)
    activities centre around: (a) Economic Development, (b) Water Management, (c) Organizational Management and (d) Capacity Development. Table 1: Achievement
    (1,240 × 1,754 (2.34 MB)) - 10:37, 22 July 2020
  • File:P29 IWM Final Report polder29 red 24may 16.pdf (matches file content)
    of the year. The temperature in May averages 29.7 °C. In January, the average temperature is 18.9 °C. It is the lowest average temperature of the whole
    (1,239 × 1,754 (4.02 MB)) - 19:29, 8 July 2020
  • File:MF P29 master file 4nov 14.pdf (category File used in Section G: Project Management) (matches file content)
    annual average temperature of 26.3 °C (79.4 °F) and monthly means varying between 12.4 °C (54.3 °F) in January and 34.3 °C (93.7 °F) in May. Annual average
    (1,240 × 1,754 (3.97 MB)) - 13:43, 20 April 2021
  • File:MF P43 2F 27sep 18.pdf (category File used in Section G: Project Management) (matches file content)
    contri bution (b) contri bution (b) contrib bution (a) bution (a) ution C=a C=a C=ax xb xb b 1 22.00 59.75 1 59.75 15.75 1 15.75 1 39.5 32.75 1 32.75 7.25
    (1,240 × 1,754 (3.37 MB)) - 13:38, 20 April 2021
  • File:PDP P25 22mar 17.pdf (category File used in Section G: Project Management) (matches file content)
    Parishad (UP) Union Parishad means the Union Parishad formulated under section 10 of the Local Government (Union Parishad) Act, 2009.” It is the lowest
    (1,240 × 1,754 (1.16 MB)) - 10:48, 22 July 2020
  • File:WP11B WMO self-monitoring Q4-2020 25mar 21 opt.pdf (matches file content)
    Total The detailed results of WMO self-assessment are given polder-wise in Section 4. The charts below show the distribution of 35 WMAs and 509 WMGs into performance
    (1,240 × 1,754 (1.86 MB)) - 16:05, 20 April 2021
  • File:DFID Conceptual Framework on Agriculture.pdf (matches file content)
    University Press and in B.J. Ndulu, S.A. O’Connell, R.H. Bates, P. Collier, and C.C. Soludo eds. (2008), The Political Economy of Economic Growth in Africa, 1960–2000
    (1,239 × 1,754 (2.51 MB)) - 05:30, 10 March 2021
  • File:Feb 15 CAWM P30 baseline pilot martina groenemeijer feb 15.pdf (matches file content)
    Figure 5, Southern section of internal drain Figure 6, Northern section of internal drain 12 Figure 7, Culvert at the Northern section of internal drain
    (1,240 × 1,754 (6.08 MB)) - 13:49, 20 April 2021
  • File:MF P43 2B master file 7jul 15.pdf (category File used in Section G: Project Management) (matches file content)
    last four years average maximum temperature is 33.3°C and appears in the month of May, minimum 12.1°C appears usually in January. Annual rainfall is 2506
    (1,275 × 1,650 (3.47 MB)) - 13:40, 20 April 2021
  • File:WP08E Report on Participatory Monitoring Oct 2018 iss 26jan 19.pdf (matches file content)
    SelfAssessm assessment ent by WMGs (indicated where it differs) B C B B C B B C B B D B -A B -A B -A C 21 January 2019 44 Blue Gold Program Theme-wise Progress
    (1,240 × 1,754 (2.12 MB)) - 08:49, 24 November 2020
  • File:MF P2 master file 29jul 15.pdf (category File used in Section G: Project Management) (matches file content)
    2 annual averages maximum temperature reaches 35.5 °C (95.9 °F); and minimum temperature is 12.5 °C (54.5 °F). The annual rainfall is 1710 mm (67 in). Map-03:
    (1,240 × 1,754 (2.8 MB)) - 13:37, 20 April 2021
  • File:TN14 FFS Trial fish ponds 2017 16apr 17.pdf (category Files not used by any section) (matches file content)
    by female, the highest was recorded from polder -2, followed by polder 55/2C, and the lowest in Polder-31 part. Mostly they were involved in cleaning the
    (1,240 × 1,754 (1.48 MB)) - 10:46, 2 July 2020
  • File:SVC 20mar 16 Information needs of smallholder sesame farmers.pdf (matches file content)
    explained in the methodology section. The methods of obtaining the information and data are elaborated as well. The following section, results, will be structured
    (1,240 × 1,754 (2.09 MB)) - 19:42, 16 December 2020
  • File:WP11A WMO self-monitoring Q3-2020 28dec 20.pdf (matches file content)
    The detailed results of self-assessment by WMGs are given polder-wise in Section 4. The charts below show the distribution of 35 WMAs and 507 WMGs into performance
    (1,240 × 1,754 (1.72 MB)) - 16:05, 20 April 2021
  • File:BGIF29 mPower breeed identification and digital registry FINAL REPORT 11nov 19.pdf (category File used in Section H: Innovation Fund) (matches file content)
    ......................... 34 COORDINATION WITH ARTIFICIAL INSEMINATION SECTION DLS ....................................... 34 STRATEGIC PLAN .........
    (1,275 × 1,650 (3.03 MB)) - 10:57, 22 July 2020
  • File:Tab 11 3 Polder Level Investments 24mar 21.pdf (matches file content)
    SI. No 1 2 3 4 5 6 8 7 9 10 11 12 13 14 15 16 Work Items Work Items Re‐sectioning of Embankment (km) Retired Embankment (km) Re‐excavation of khals (km)
    (1,650 × 1,275 (113 KB)) - 05:38, 17 May 2021
  • File:BGIF Procedures Manual v8 22may 18.pdf (category Files not used by any section) (matches file content)
    Program 1. Application process for the Blue Gold Innovation Fund This section systematizes and presents the steps to be followed, the forms to be used
    (1,240 × 1,754 (2.41 MB)) - 09:44, 24 June 2020
  • File:WP08G Report on Participatory Monitoring Oct 2019 15dec 19.pdf (matches file content)
    Assessme nt (indicated where it differs) C - B - B - C - C - A B C B D - A - C - A B C - A - D - B - The progress achieved
    (1,240 × 1,754 (2 MB)) - 18:42, 8 July 2020
  • File:27feb 21 WMO unified development of WMOs.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    of water management system for the completed polder system where large section of people’s community is living. The Blue Gold Program operates in the southern
    (1,240 × 1,754 (658 KB)) - 05:46, 9 March 2021
  • File:BGIF06 Greyshack - Feasibility study on renewable energy Dec2015.pdf (category File used in Section H: Innovation Fund) (matches file content)
    contemporarily development challenges. Section 3, provides some basic information on energy use patterns in selected rural areas. Section 4 account findings based on
    (1,275 × 1,650 (7.82 MB)) - 10:57, 22 July 2020
  • File:MF P43 1A master file 4aug 15.pdf (category File used in Section G: Project Management) (matches file content)
    climate. Maximum temperature of this district is 33.3°C and appears in the month of May, minimum 12.1°C appears usually in January. Annual rainfall is 2506
    (1,275 × 1,650 (2.51 MB)) - 13:32, 20 April 2021
  • File:TN08 Nursery Management in Khulna and Patuakhali 6jan 16.pdf (category Files not used by any section) (matches file content)
    following activities should be ensured to develop a good business enterprise a. b. c. d. e. Pond preparation activities should be followed in proper way Ensure
    (1,240 × 1,754 (798 KB)) - 10:20, 2 July 2020
  • File:WP08B participatory monitoring v4 20nov 17.pdf (category File used in Section D: Participatory Water Management) (matches file content)
    and water management partnership, (b) agriculture and economic development, (c) community participation in planning, implementation and use of water management
    (1,240 × 1,754 (2.3 MB)) - 10:59, 22 July 2020
  • File:MF P43 2D master file 20apr 15.pdf (category File used in Section G: Project Management) (matches file content)
    5. Jainkati (Part). Maximum temperature of this district is 33.3°C and minimum 12.1°C. Annual rainfall is 2506 mm. The region is beside the sea. So Patuakhali
    (1,240 × 1,754 (4.51 MB)) - 13:46, 20 April 2021
  • File:TN 02 Tilapia Value Chain Analysis July 13 2015.pdf (category File used in Section E: Agricultural Development) (matches file content)
    budget (increase outreach) - Support WMG members to use funds from the WMG S&C -Initiate discussion with different MFI and commercial banks for creating
    (1,240 × 1,754 (899 KB)) - 04:46, 28 July 2020
  • File:TN10 FFD for FFS Cycle 6 Patuakhali 15jun 16.pdf (category Files not used by any section) (matches file content)
    Also different tools/equipment and materials used in IPM process. IPM Booth c. Improved Rearing Practice of Backyard Poultry Booth – demonstrated ideal poultry
    (1,240 × 1,754 (1.32 MB)) - 10:36, 2 July 2020
  • File:TN13 P22 Mini Ponds for Watermelon and Fish 13nov 16.pdf (category Files not used by any section) (matches file content)
    (20g) - Sweet gourd 1 small packet (10g) - Yard long bean 1 small pack (10g). c) Inputs (seeds and fertilizer) provided to each farmer for Water melon production
    (1,275 × 1,650 (791 KB)) - 10:44, 2 July 2020
  • File:Research 8feb 12 less noise in the household the impact of farmer field schools on gender relations.pdf (matches file content)
    typical FFS graduates in terms of social and economic characteristics and (c) ensuring gender balance among respondents. The in-depth interviews followed
    (1,275 × 1,650 (129 KB)) - 16:55, 10 December 2020
  • Files that are used in Section C: Water Infrastructure
    0 members (0 subcategories, 0 files) - 10:38, 21 July 2020
  • File:MF P43 2E master file 24jun 15.pdf (category File used in Section G: Project Management) (matches file content)
    high. Especially, females are suffering for vitamin C and iron. Chili and Vegetable contain huge Vit. C and Banana contain enough iron. Tilapia and Native
    (1,240 × 1,754 (2.37 MB)) - 13:29, 20 April 2021
  • File:TN07 FFS Cycle 4 Mar-Sep 2015 23dec 15.pdf (category File used in Section F: Responsible Development) (matches file content)
    577 W www.mottmac.com Gree en co orner – Sav ve a tree today! Mott Mac cDonald is co ommitted to integrating ssustainability into our ope erational
    (1,239 × 1,754 (890 KB)) - 04:47, 28 July 2020
  • File:TW01 Trend Watcher Issue 1 Dec 2016.pdf (matches file content)
    Patuakhali 1,981 43/1A Patuakhali 4,385 55/2A Patuakhali 11,941 55/2C Patuakhali 8,698 Remarks Source of data: These are estimates and calculations
    (1,275 × 1,650 (555 KB)) - 09:57, 1 July 2020
  • File:Barta 05 June 2016.pdf (category File used in Section G: Project Management) (matches file content)
    msiwÿZ Avm‡bi Rb¨ wbe©vPb Kwi| wbe©vP‡b Avwg cÖvq 5 nvRvi †fvU †c‡qwQ Avi Avgvi wbKUZg cÖwZØ›Øx †fvU †c‡q‡Qb gvÎ 500 †fvU| cvwb e¨e¯’vcbv `‡j `xN©w`b RwoZ
    (1,425 × 1,875 (631 KB)) - 10:53, 22 July 2020
  • File:Barta 03.pdf (category File used in Section G: Project Management) (matches file content)
    ch©v‡q Avmvi c_ Zvi Rb¨ †gv‡UB gm„Y wQj bv| bvix n‡q †bZ…‡Z¡ Avmv I cyiæl‡`i mv‡_ mfvcwZ c‡` cÖwZØw›ØZv Kivi Rb¨ Zv‡K wbKU AvZ¥xqmn ¯’vbxq cÖfvekvjx‡`i evavi
    (1,425 × 1,875 (979 KB)) - 10:53, 22 July 2020
  • File:Barta 11 Blue Gold Barta 11th Issue.pdf (category File used in Section G: Project Management) (matches file content)
    K‡i| c‡i AskMÖnYKvixiv Zv‡`i wbR wbR cvwb e¨e¯’vcbv `‡j GB km¨ wbweoZv e„w×KiY c`‡ÿc m¤úªmvi‡Yi Rb¨ GKwU cwiKíbv cÖYqb K‡ib| cÖKvkK: eøy †Mvì †cÖvMÖvg
    (1,425 × 1,875 (1.23 MB)) - 10:53, 22 July 2020
  • File:Barta 02 2015.pdf (category File used in Section G: Project Management) (matches file content)
    cvwb weï×KiY c×wZ ïaygvÎ my‡h©i Av‡jv e¨envi K‡i ev®úxfeb I Nbxfeb cÖwµqvq cvwb weï× K‡i| Gi Rb¨ †Kvb RwUj hš¿, ivmvqwbK c`v_©, M¨vm I we`y¨‡Zi cÖ‡qvRb nq
    (1,425 × 1,875 (933 KB)) - 10:53, 22 July 2020
  • File:Barta 06 September 2016.pdf (category File used in Section G: Project Management) (matches file content)
    wbb| 10 b¤^i gnvwec` ms‡KZ cÖPv‡ii ci cwiw¯’wZ ¯^vfvweK nIqv ch©šÍ AvkÖq‡K‡›`ª A_ev wbivc` RvqMvq A‡c¶v Kiæb| Avkªq‡K‡›`ª hvIqvi c~‡e© †g‡qiv Pzj I Kvco k³
    (1,425 × 1,875 (3.24 MB)) - 10:53, 22 July 2020
  • File:Barta 07 December 2016.pdf (category File used in Section G: Project Management) (matches file content)
    K‡i‡Q| GB `jwUi 25wU K…lK cwievi DbœZ c×wZ‡Z nvum gyiMx cvjb Ges mewR Pvl wel‡q cÖwkÿY †c‡q‡Q| GLb GjvKvi A‡bK cwievi DbœZ c×wZ‡Z nvum gyiMx cvjb Ges mewR Pvl
    (1,425 × 1,875 (1.2 MB)) - 10:53, 22 July 2020
  • File:PDP P55-2C 15jun 17.pdf (category File used in Section G: Project Management)
    Polder Development Plan for Polder 55/2C PDP
    (1,240 × 1,754 (2.61 MB)) - 10:40, 22 July 2020
  • File:Barta 08.pdf (category File used in Section G: Project Management) (matches file content)
    Kv‡Q webv Pv‡l imyb Avev‡`i K_v Rvb‡Z †c‡i Pv‡l AvMÖn cÖKvk K‡ib| Avãyj Lv‡jK Zv‡K exR Ges Pvlvev` c×wZ m¤ú‡K© mnvqZv cÖ`vb K‡ib| 2015 mv‡j Agi ivq webv Pv‡l
    (1,425 × 1,875 (1.14 MB)) - 10:53, 22 July 2020

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)