Views
Actions
Unused files
From Blue Gold Program Wiki
The following files exist but are not embedded in any page. Please note that other web sites may link to a file with a direct URL, and so may still be listed here despite being in active use.
Showing below up to 500 results in range #1 to #500.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- Good Catchment(5).jpg 2,518 × 1,648; 428 KB
- Appendix 7 BGIF project locations.png 1,131 × 799; 1.06 MB
- Appendix 8 BGIF project locations pilot and integrated.png 1,187 × 839; 1.15 MB
- Appendix 3 fig 1 BGIF projects per sector per project type.png 685 × 391; 31 KB
- Appendix 3 fig 2 BGIF allocations.png 715 × 356; 35 KB
- 19dec 19 BGIF Lessons Learnt draft v3.pdf 1,240 × 1,754, 43 pages; 2.12 MB
- ARM Aide Memoire 2-14oct 2016 31oct 16.pdf 1,239 × 1,754, 80 pages; 4.25 MB
- ARM Aide Memoire 9-20Nov 2018 11jan 19.pdf 1,240 × 1,754, 48 pages; 1.2 MB
- ARM Aide Memoire 23Aug-5Sep 2014.pdf 1,240 × 1,753, 89 pages; 1.05 MB
- ARM Aide Memoire 27Sep-13Oct 2015.pdf 1,240 × 1,753, 85 pages; 6.1 MB
- BGP Barta Issue - 1.pdf 1,425 × 1,875, 4 pages; 2.99 MB
- AWP 2019 20 Annual Work Plan 2019-2020 10jul 19.pdf 1,275 × 1,650, 173 pages; 3.06 MB
- WP08A participatory monitoring red 28feb 17.pdf 1,239 × 1,754, 114 pages; 5.98 MB
- PR Apr-Sep 2013 10dec 13.pdf 1,240 × 1,754, 49 pages; 1.5 MB
- WP10B WMA Participatory Monitoring Oct 2019 23dec 19 opt.pdf 1,240 × 1,754, 94 pages; 12.09 MB
- BGIF Procedures Manual v8 22may 18.pdf 1,240 × 1,754, 45 pages; 2.41 MB
- BGIF QPR Apr-Jun 2016 2sep 16.pdf 1,754 × 1,239, 19 pages; 234 KB
- AWP 2014 blue-gold-annual-plan-2014.pdf 1,240 × 1,754, 79 pages; 4.84 MB
- GoB BWDB Act 2000 (english translation).pdf 1,239 × 1,754, 13 pages; 54 KB
- WP01 Theory of Change 30nov 15.pdf 1,239 × 1,754, 22 pages; 245 KB
- P29 Lower Bhadra float tracking Ghani 24apr 17.pdf 1,754 × 1,239; 340 KB
- GoB WARPO Bangladesh Water Act 2013 (English).pdf 1,240 × 1,754, 18 pages; 432 KB
- P29 BGP preemptive actions to avoid erosion damage 25apr 17.pdf 1,240 × 1,754; 489 KB
- WP02A Exit Strategy feb 16 v2.pdf 1,239 × 1,754, 32 pages; 562 KB
- BGIF QPR Apr-Jun 2017 9aug 17.pdf 1,754 × 1,240, 31 pages; 616 KB
- P29 Deltares Erik Mosselmann P29 Review of IWM study 8jan 16.pdf 1,240 × 1,753, 23 pages; 683 KB
- TR 15 Communications Strategy 2015.pdf 1,240 × 1,754, 25 pages; 724 KB
- BGIF QPR Apr-Jun 2018 2aug 18.pdf 1,240 × 1,754, 24 pages; 890 KB
- EXT Strategic Action plan for Extension Methodology rev 15may 18.pdf 1,240 × 1,754, 14 pages; 867 KB
- TN 02 Tilapia Value Chain Analysis July 13 2015.pdf 1,240 × 1,754, 29 pages; 899 KB
- BGIF QPR Jan-Mar 2017 29may 17.pdf 1,650 × 1,275, 30 pages; 353 KB
- BGIF QPR Jan-Mar 2018 30apr 18.pdf 1,240 × 1,754, 19 pages; 686 KB
- BGIF QPR Jan-Mar 2019 18jun 19.pdf 1,240 × 1,754, 15 pages; 502 KB
- BGIF QPR Jul-Sep 2016 29sep 16.pdf 1,754 × 1,239, 24 pages; 277 KB
- BGIF QPR Jul-Sep 2017 26oct 17.pdf 1,240 × 1,754, 22 pages; 832 KB
- BGIF QPR Jul-Sep 2018 15Oct 18.pdf 1,240 × 1,754, 23 pages; 880 KB
- BGIF QPR Oct-Dec 2016 7feb 17.pdf 1,754 × 1,239, 32 pages; 300 KB
- BGIF QPR Oct-Dec 2017 12Feb 18.pdf 1,240 × 1,754, 19 pages; 941 KB
- BGIF QPR Oct-Dec 2018 15feb 19.pdf 1,240 × 1,754, 17 pages; 479 KB
- EIA P2 CEGIS Jun 16.pdf 1,240 × 1,754, 251 pages; 9.51 MB
- EIA P22 CEGIS Sep 15.pdf 1,240 × 1,754, 256 pages; 12.37 MB
- EIA P26 CEGIS Jun 16.pdf 1,240 × 1,754, 251 pages; 51.83 MB
- EIA P27 BWDB Sep 19.pdf 1,240 × 1,754, 158 pages; 7.81 MB
- Barta 02 2015.pdf 1,425 × 1,875, 4 pages; 933 KB
- Barta 03.pdf 1,425 × 1,875, 4 pages; 979 KB
- Barta 04 March 2016.pdf 1,425 × 1,875, 4 pages; 3.63 MB
- Barta 05 June 2016.pdf 1,425 × 1,875, 4 pages; 631 KB
- Barta 06 September 2016.pdf 1,425 × 1,875, 4 pages; 3.24 MB
- Barta 07 December 2016.pdf 1,425 × 1,875, 4 pages; 1.2 MB
- Barta 08.pdf 1,425 × 1,875, 4 pages; 1.14 MB
- Barta 09.pdf 1,425 × 1,875, 4 pages; 1.17 MB
- Barta 10 December 2017.pdf 1,425 × 1,875, 4 pages; 1.15 MB
- GoB DAE CAWM FFS Module.pdf 1,124 × 1,493, 202 pages; 1.95 MB
- GoB DAE BGP Field School Session Guide.pdf 1,240 × 1,753, 418 pages; 8.21 MB
- TW01 Trend Watcher Issue 1 Dec 2016.pdf 1,275 × 1,650, 7 pages; 555 KB
- Satelliegence MTR v2.0 opt 29sep 18.pdf 1,275 × 1,650, 55 pages; 9.75 MB
- Satelligence final report 9jul 19.pdf 1,275 × 1,650, 58 pages; 5.2 MB
- DEM Khulna 2, 26 & 31part IWM (Jul 2015).pdf 1,240 × 1,754, 34 pages; 3.48 MB
- EIA P28 1 BWDB Sep 19.pdf 1,240 × 1,754, 170 pages; 7.9 MB
- PR Oct-Dec 2013 26feb 14.pdf 1,240 × 1,754, 74 pages; 2.06 MB
- PR Jan-Mar 2014 14may 14.pdf 1,240 × 1,754, 77 pages; 1.89 MB
- PR Apr-Jun 2014 4aug 14.pdf 1,275 × 1,650, 96 pages; 1.06 MB
- PR Jul-Sep 2014 19nov 14.pdf 1,240 × 1,754, 57 pages; 1.75 MB
- EIA P28 2 BWDB Sep 19.pdf 1,240 × 1,754, 174 pages; 7.01 MB
- PR Oct-Dec 2014.pdf 1,240 × 1,754, 94 pages; 3.24 MB
- PR Jan-Mar 2015.pdf 1,240 × 1,754, 88 pages; 3.6 MB
- PR Apr-Jun 2015 5aug 15.pdf 1,240 × 1,754, 98 pages; 4.11 MB
- EIA P29 CEGIS Jun 16.pdf 1,240 × 1,754, 256 pages; 20.54 MB
- EIA P30 CEGIS Sep 15.pdf 1,240 × 1,754, 285 pages; 14.5 MB
- EIA P31 part CEGIS Jun 16.pdf 1,240 × 1,754, 248 pages; 33.56 MB
- EIA P34 2 BWDB Sep 19.pdf 1,240 × 1,754, 190 pages; 7.54 MB
- EIA P43 1A CEGIS Apr 16.pdf 1,240 × 1,754, 255 pages; 12.93 MB
- EIA P43 2A CEGIS Jun 15.pdf 1,240 × 1,754, 254 pages; 15.37 MB
- EIA P43 2B CEGIS Apr 16.pdf 1,240 × 1,754, 248 pages; 14.46 MB
- EIA P43 2D CEGIS Jun 15.pdf 1,240 × 1,753, 262 pages; 16.63 MB
- DEM Patuakhali 55-2A-&-55-2C-CEGIS-(Nov-2015).pdf 1,275 × 1,650, 47 pages; 2.01 MB
- DEM-Patuakhali-47-3-&-47-4-CEGIS-(Jan-2018).pdf 1,250 × 1,793, 76 pages; 11.96 MB
- DEM Patuakhali 43-2A,-43-2B,-43-2D-&-43-2E-CEGIS-(Nov-2016).pdf 1,273 × 1,822, 89 pages; 5.55 MB
- DEM-Patuakhali 43-1A-&-43-2F-CEGIS-(Nov-2016).pdf 1,273 × 1,821, 50 pages; 3.63 MB
- DEM-Khulna 22 CEGIS-(Nov-2016).pdf 1,277 × 1,822, 21 pages; 1.41 MB
- DEM Khulna 25, 27-1, 27-2, 28-1 & 28-2 CEGIS (Jan 2018).pdf 1,250 × 1,767, 73 pages; 15.88 MB
- DEM-Khulna 29-&-30-CEGIS-(Jun-2017).pdf 1,250 × 1,889, 66 pages; 4.8 MB
- EIA P43 2E CEGIS Apr 16.pdf 1,240 × 1,754, 260 pages; 9.99 MB
- EIA P43 2F CEGIS Jun 15.pdf 1,240 × 1,754, 270 pages; 15.27 MB
- EIA P55 2A BWDB Sep 19.pdf 1,240 × 1,754, 164 pages; 6.23 MB
- PP TA ARM Discussion Paper 2016 1oct 16.pdf 1,239 × 1,754, 85 pages; 812 KB
- PP TA ARM position paper 2017 18nov 17.pdf 1,240 × 1,754, 82 pages; 9.32 MB
- PP TA ARM position paper 2018 3nov 18.pdf 1,240 × 1,754, 265 pages; 31.43 MB
- TM Field Manual BGP PWM Bangla 28feb 17.pdf 1,240 × 1,754, 21 pages; 758 KB
- TM Field Manual BGP PWM Eng 1feb 17.pdf 1,239 × 1,754, 14 pages; 292 KB
- TN01 Use of ODK Software in FFS Cycle 3 Sep 2014-Mar 2015 6Jun 15.pdf 1,240 × 1,754, 41 pages; 1.05 MB
- TN06 Sajna (Moringa Oleifera) Cuttings 23dec 15.pdf 1,239 × 1,754, 18 pages; 480 KB
- TN07 FFS Cycle 4 Mar-Sep 2015 23dec 15.pdf 1,239 × 1,754, 28 pages; 890 KB
- TN08 Nursery Management in Khulna and Patuakhali 6jan 16.pdf 1,240 × 1,754, 14 pages; 798 KB
- TN09 FFS Fish Trial Ponds 2015 20mar 16.pdf 1,240 × 1,754, 16 pages; 915 KB
- TN10 FFD for FFS Cycle 6 Patuakhali 15jun 16.pdf 1,240 × 1,754, 17 pages; 1.32 MB
- TN11 FFS Cycle 5 Mar-Nov 2015 29may 16.pdf 1,240 × 1,754, 25 pages; 1.1 MB
- TN12 FFS Cycle 6 Oct 2015-Mar 2016 28sep 16.pdf 1,240 × 1,754, 55 pages; 1.91 MB
- TN13 P22 Mini Ponds for Watermelon and Fish 13nov 16.pdf 1,275 × 1,650, 16 pages; 791 KB
- TN14 FFS Trial fish ponds 2017 16apr 17.pdf 1,240 × 1,754, 19 pages; 1.48 MB
- TN15 FFS Cycle 7 Apr-Dec 2016 5may 17.pdf 1,240 × 1,754, 21 pages; 1.3 MB
- TN16 FFS Cycle 8 Oct 2016 - Mar 2017 22may 17.pdf 1,240 × 1,754, 49 pages; 2.32 MB
- TN17 FFS Cycle 1 follow up 6jun 17.pdf 1,240 × 1,754, 36 pages; 1.1 MB
- TN18 FFS Cycle 2 follow up 12jul 17.pdf 1,240 × 1,754, 37 pages; 1.59 MB
- TN20 FFS Cycle 9 May-Nov 2017 4apr 18.pdf 1,240 × 1,754, 73 pages; 2.32 MB
- TN21 FFS Cycle 10 Oct-Apr 2018 25sep 18.pdf 1,240 × 1,754, 65 pages; 1.66 MB
- TN22 FFS Cycle 11 Apr-Nov 2018 19sep 2019.pdf 1,240 × 1,754, 49 pages; 1.01 MB
- TN23 FFS Cycle 12 Nov 2018 - Mar 2019 3Oct 19.pdf 1,240 × 1,754, 35 pages; 1.09 MB
- TN24 13th cycle FFS 13feb 20.pdf 1,240 × 1,754, 48 pages; 933 KB
- Barta 11 Blue Gold Barta 11th Issue.pdf 1,425 × 1,875, 4 pages; 1.23 MB
- Barta 12 Blue Gold Barta 12th Issue.pdf 1,425 × 1,875, 4 pages; 1.2 MB
- Barta 13 Blue Gold Barta 13th Issue.pdf 1,425 × 1,875, 4 pages; 1.16 MB
- Barta 14 21jan 19 Blue Gold Barta 14th issue.pdf 1,425 × 1,875, 4 pages; 1.13 MB
- AWP 2015 Annual Plan 2015 v5 241214.pdf 1,240 × 1,754, 82 pages; 6.3 MB
- AWP 2015 16 Annual Work Plan 2015 - 2016 14 July 2015.pdf 1,240 × 1,754, 85 pages; 4.77 MB
- AWP 2016 AnnualPlan201617V2.pdf 1,240 × 1,754, 126 pages; 9.75 MB
- AWP 2017 18 BGPAnnualPlan20172018.pdf 1,240 × 1,754, 171 pages; 6.78 MB
- AWP 2018 19 Annual Work Plan 2018-2019 1aug 18.pdf 1,240 × 1,754, 177 pages; 2.84 MB
- BARTA 15 10jun 19.pdf 1,440 × 1,875, 4 pages; 28.49 MB
- BARTA 16 final pdf version 11sep 19.pdf 1,199 × 1,559, 4 pages; 16.56 MB
- TW02 Trend Watcher 2 17oct 17.pdf 1,238 × 1,754, 8 pages; 974 KB
- TW03 final 20mar 18.pdf 1,275 × 1,800, 8 pages; 1.3 MB
- TW04 30aug 18.pdf 1,240 × 1,753, 8 pages; 7.39 MB
- TW05 8may 19.pdf 1,240 × 1,753, 8 pages; 7.05 MB
- TW06 17dec 19 Trends Watcher 6 Final.pdf 1,240 × 1,754, 12 pages; 14.73 MB
- Booklet beef fattening FFS jul 18.pdf 1,286 × 1,073, 38 pages; 8.81 MB
- Booklet fish FFS jul 18.pdf 1,287 × 1,073, 34 pages; 9.29 MB
- Booklet homestead garden FFS jul 18.pdf 1,275 × 1,050, 48 pages; 6.26 MB
- Booklet nutrition FFS jul 18.pdf 1,275 × 1,050, 26 pages; 7.74 MB
- Booklet poultry FFS jul 18.pdf 1,275 × 1,050, 22 pages; 5.67 MB
- EXT Agro-Insight report v13 3may 18.pdf 1,240 × 1,754, 98 pages; 2.15 MB
- TN 04 Local Poultry Value chain Analysis.pdf 1,240 × 1,754, 34 pages; 957 KB
- GoB BWDB PWMR 2014 (english) 11feb 14.pdf 1,240 × 1,754, 29 pages; 998 KB
- P29 FRERMIP visit 13 March2017 v3 11apr 17.pdf 1,239 × 1,754, 17 pages; 1,005 KB
- P29 Breach- Background Note.pdf 1,275 × 1,650, 7 pages; 1.08 MB
- TN 05 Mung bean VCA.pdf 1,240 × 1,754, 39 pages; 1.08 MB
- TR 13 BlueGold WMG LGI cooperation Report 05.pdf 1,240 × 1,754, 41 pages; 1.17 MB
- TN 03 Benchmark Report on Mung Bean Patu MFS-final.pdf 1,240 × 1,754, 36 pages; 1.19 MB
- TR 08 Operational Manual for Output and Outcome Monitoring.pdf 1,240 × 1,754, 26 pages; 1.25 MB
- WP03 Building organisation 2jun 16.pdf 1,239 × 1,754, 47 pages; 1.31 MB
- WP09C WMG Tracker Report to MARCH 2018 v5 20 06 2018 SKD.pdf 1,240 × 1,754, 75 pages; 1.31 MB
- P29 Lower Bhadra IWM borehole investigation 23jul 17.pdf 1,275 × 1,650, 43 pages; 1.42 MB
- TR 03 WMO Functionality Assessment Polders 22,30, 43.2D and 43.2F.pdf 1,275 × 1,650, 68 pages; 1.51 MB
- P29 Deltares review of BWDB designs 30may 17.pdf 1,240 × 1,754, 30 pages; 1.53 MB
- TR 10 WMO Functionality Assessment Vol 2 Sept 2014.pdf 1,275 × 1,650, 66 pages; 1.53 MB
- WP08C participatory monitoring oct nov 2017 5apr 18.pdf 1,240 × 1,754, 61 pages; 1.56 MB
- WP04 Vocational Training 23aug 16.pdf 1,240 × 1,754, 41 pages; 1.87 MB
- PR jul dec 2017 BGP HYPR July-Dec 2017.pdf 1,240 × 1,754, 67 pages; 1.89 MB
- WP09H 30oct 19 WP9H WMG Tracker FINAL Report jun 19.pdf 1,240 × 1,754, 40 pages; 1.91 MB
- WP08G Report on Participatory Monitoring Oct 2019 15dec 19.pdf 1,240 × 1,754, 70 pages; 2 MB
- WP08D Report on Participatory Monitoring Apr-May 2018 v1 24jul 18.pdf 1,240 × 1,754, 81 pages; 2.04 MB
- WP08F report on Participatory Monitoring Apr 2019 v1 10jul 19.pdf 1,240 × 1,754, 72 pages; 2.07 MB
- WP09E WMG Tracker Report up to SEPT 2018 iss 26jan 19.pdf 1,240 × 1,754, 53 pages; 2.18 MB
- WP09D WMG Tracker Report up to JUNE 2018 v4 27 08 2018 SKD.pdf 1,240 × 1,754, 45 pages; 2.21 MB
- PR jul dec 2019 HYPR jul dec19 final.pdf 1,240 × 1,754, 99 pages; 2.29 MB
- WP08B participatory monitoring v4 20nov 17.pdf 1,240 × 1,754, 74 pages; 2.3 MB
- WP09B 11apr 18 WP9B WMG tracker to Dec 2017.pdf 1,240 × 1,754, 86 pages; 2.34 MB
- PR jan jun 2018 HYPR Jan-June 2018 26jul 18.pdf 1,240 × 1,754, 76 pages; 2.35 MB
- PR jan jun 2017 HYPR jan jun 2017 FINAL.pdf 1,240 × 1,754, 56 pages; 2.37 MB
- PR jul dec 2018 BGP HYPR Jul-Dec 2018 final opt.pdf 1,240 × 1,754, 86 pages; 2.81 MB
- PR jan jun 2019 Half Yearly Progress Report Jan-Jun 2019.docx.pdf 1,240 × 1,754, 98 pages; 2.85 MB
- WP09F WMG Tracker Report to Dec 2018 iss 20feb 19 opt.pdf 1,240 × 1,754, 54 pages; 2.96 MB
- P29 FRERMIP Final report Emergency protection works P29 v5 23jun 18.pdf 1,240 × 1,754, 36 pages; 3.09 MB
- WP09G WMG Tracker Report up to MARCH 2019 v3 16 05 2019 SKD.pdf 1,240 × 1,754, 55 pages; 3.15 MB
- PR jan jun 2016 HYPR Jan-Jun 2016 9sep 16.pdf 1,240 × 1,754, 84 pages; 3.36 MB
- P29 FRERMIP Top Blocked Spur Numerical Modelling v3 12jul 17.pdf 1,239 × 1,754, 21 pages; 3.2 MB
- GoN Program Document BGP 28Aug12.pdf 1,239 × 1,754, 111 pages; 3.77 MB
- PR jul dec 2015 HPR-Half-Yearly Progress Report Jul-Dec 2015.Final.pdf 1,240 × 1,754, 114 pages; 3.83 MB
- P29 IWM Final Report polder29 red 24may 16.pdf 1,239 × 1,754, 118 pages; 4.02 MB
- IR Inception Report, revised March 2014.pdf 1,275 × 1,650, 326 pages; 4.35 MB
- P29 BWDB design drawings groynes 1nov 16.pdf 1,770 × 1,297, 9 pages; 4.69 MB
- PR jul dec 2016 HYPR July to Dec 2016.04Aprl 17.pdf 1,240 × 1,754, 91 pages; 5.05 MB
- TM beef fattening mar 19.pdf 1,275 × 1,650, 110 pages; 6.77 MB
- GoB MoWR National Water Policy January 1999.pdf 1,240 × 1,758, 26 pages; 6.9 MB
- GoB MoWR GPWM April 2001.pdf 984 × 1,332, 91 pages; 7.78 MB
- P29 Lower Bhadra IWM river survey report 23jul 17.pdf 1,275 × 1,650, 90 pages; 8.99 MB
- WP10A WMA Participatory Monitoring May 2019 5aug 19.pdf 1,240 × 1,754, 77 pages; 11.83 MB
- P29 IWM Lower Bhadra Survey Report 3rd Cycle nov 17.pdf 1,240 × 1,754, 121 pages; 14.29 MB
- TM MOVCD training manual 27may 18.pdf 1,275 × 1,651, 76 pages; 15.46 MB
- GoB WARPO Water Rules Bidhimala aug 18 (Bangla).pdf 912 × 1,427, 92 pages; 20.9 MB
- TM fisheries FFS 16apr 19.pdf 1,240 × 1,687, 123 pages; 29.32 MB
- OT Study tour Indonesia 19-27Apr2015.pdf 1,275 × 1,650, 5 pages; 173 KB
- TR01 Proceedings Inception Report Workshop on 26 Jun 2013.pdf 1,275 × 1,650, 27 pages; 197 KB
- BGIF00 Twynstra&Gudde - study of WMOs as cooperatives.pdf 1,275 × 1,650, 74 pages; 762 KB
- TR12 Partnership Strategy 2014-2019 11jan 15.pdf 1,240 × 1,754, 32 pages; 329 KB
- TR17A - Semi Annual OUTCOME Monitoring Report (Sep Oct 2015) nov 15.pdf 1,275 × 1,650, 25 pages; 686 KB
- TR02 H&S measures 18Dec 13.pdf 1,240 × 1,754, 37 pages; 704 KB
- TR11 Training Plan 2013-2019 19nov 14.pdf 1,240 × 1,753, 55 pages; 704 KB
- TR09 WMOs Comparative Analysis 28apr 14.pdf 1,240 × 1,754, 24 pages; 741 KB
- TR17 Semi Annual Outcome Monitoring Report (Jan Feb 2015) 1may 15.pdf 1,240 × 1,754, 25 pages; 802 KB
- TR04 Introduction to ME manual 11dec 13.pdf 1,240 × 1,754, 81 pages; 934 KB
- TR24 2018 2019 CAWM Strategic Plan 16sep 18.pdf 1,240 × 1,754, 37 pages; 1.1 MB
- TR20 2016 17 CAWM Strategic Plan 22 Sep 16.pdf 1,239 × 1,754, 56 pages; 1.25 MB
- TR05 Inventory Geoinformation Dec2013.pdf 1,240 × 1,754, 38 pages; 1.29 MB
- TR25 Outcomes report WMG survey 2018 29oct 18.pdf 1,240 × 1,754, 89 pages; 1.76 MB
- TR19 Mustard Value Chain Analysis 22feb 17.pdf 1,240 × 1,754, 36 pages; 1.78 MB
- TR26 outcomes report WMG survey 2019 final 18nov 19.pdf 1,240 × 1,754, 85 pages; 1.86 MB
- TR07 Field Trip Reports 2013 15apr 14.pdf 1,275 × 1,650, 108 pages; 2.21 MB
- TR18 Improved Water Management Pilot CWM P30 11jul 16.pdf 1,240 × 1,754, 28 pages; 2.51 MB
- TR16A Field Trip Reports from 2014 5may 15.pdf 1,240 × 1,754, 96 pages; 3.05 MB
- TR16B Field Trip Reports from 2014 5may 15.pdf 1,240 × 1,754, 97 pages; 3.83 MB
- TR22 Agric changes 2013 to 2017 v2 25mar 18.pdf 1,240 × 1,754, 57 pages; 4.56 MB
- TR23 Phase II Socio-Economic Baseline Survey 31may 18.pdf 1,275 × 1,650, 183 pages; 5.24 MB
- TR06 Household Survey Report P22 30 43 2D 43 2F 31mar 14.pdf 1,275 × 1,650, 52 pages; 4.02 MB
- OT AIWW and Water Management Policy Approaches in Netherlands and UK 1-12nov2015.pdf 1,239 × 1,754, 156 pages; 5.25 MB
- OT Hague Academy Multi-Level Water Governance 4-15Apr2016.pdf 1,240 × 1,753, 29 pages; 1.41 MB
- OT Hague Academy Multi-level Water Governance 26Oct-6Nov2015.pdf 1,240 × 1,754, 26 pages; 868 KB
- TM Flipchart - women leaders in agriculture jun 18.pdf 1,987 × 1,455, 22 pages; 7.43 MB
- TM Flipchart - gender awareness jun 18.pdf 1,987 × 1,455, 36 pages; 2.68 MB
- GoB National Water Policy 1999 bangla.pdf 1,120 × 1,539, 27 pages; 438 KB
- GoB WARPO Water Rules - Union Parishad Guideline 2019 bangla.pdf 1,240 × 1,753, 43 pages; 1.46 MB
- GoB WARPO Water Rules District Guideline 2019.pdf 1,240 × 1,753, 49 pages; 1.49 MB
- GoB WARPO Water Rules Upazila Parishad Guidelines 2019 bangla.pdf 1,240 × 1,753, 48 pages; 1.65 MB
- BGIF01 IWM - Planning design and monitoring of community based WM systems in P30 .Jan2014.pdf 1,240 × 1,754, 39 pages; 5.15 MB
- BGIF02 Deltares - Feasibility pump drainage system BG Polders Dec2014.pdf 1,275 × 1,650, 51 pages; 5.27 MB
- BGIF03 IMARES WUR Quickscan Freswater Pearl Culture Feasibility 21jan 15.pdf 1,240 × 1,754, 16 pages; 569 KB
- BGIF04 Groenemeijer WUR - Baseline P30 Community Water Management Pilot 28feb 15.pdf 1,240 × 1,754, 53 pages; 6.13 MB
- BGIF05 CDI WUR - Opportunities for development of the Moringa sector Jul2015.pdf 1,240 × 1,753, 49 pages; 1.54 MB
- BGIF06 Greyshack - Feasibility study on renewable energy Dec2015.pdf 1,275 × 1,650, 44 pages; 7.82 MB
- BGIF07 World Fish - Ecopond Project - Women-Headed Small Household Ponds 28Dec2015.pdf 1,275 × 1,650, 126 pages; 4.3 MB
- PDP P55-2C 15jun 17.pdf 1,240 × 1,754, 36 pages; 2.61 MB
- PDP P55-2A 15jun 17.pdf 1,240 × 1,754, 33 pages; 2.33 MB
- PDP P47-4 27aug 17.pdf 1,240 × 1,754, 36 pages; 2.57 MB
- PDP P47-3 27aug 17.pdf 1,240 × 1,754, 33 pages; 2.11 MB
- PDP P43-2F 5feb 17.pdf 1,240 × 1,754, 37 pages; 1.88 MB
- PDP P43-2E 5feb 17.pdf 1,240 × 1,754, 37 pages; 2.32 MB
- PDP P43-2D 5feb 17.pdf 1,240 × 1,754, 36 pages; 3.22 MB
- PDP P43-2B 5feb 17.pdf 1,240 × 1,754, 38 pages; 2.56 MB
- PDP P43-2A 5feb 17.pdf 1,240 × 1,754, 36 pages; 2.67 MB
- PDP P43-1A 5feb 17.pdf 1,240 × 1,754, 35 pages; 2.49 MB
- PDP P34-2part 20aug 17.pdf 1,240 × 1,754, 35 pages; 2.48 MB
- PDP P31part 5feb 17.pdf 1,240 × 1,754, 35 pages; 2.02 MB
- PDP P30 5feb 17.pdf 1,240 × 1,754, 37 pages; 2.4 MB
- PDP P29 5feb 17.pdf 1,240 × 1,754, 36 pages; 2.5 MB
- PDP P28-2 15jun 17.pdf 1,240 × 1,754, 34 pages; 2.14 MB
- PDP P28-1 22mar 17.pdf 1,240 × 1,754, 35 pages; 1.16 MB
- PDP P27-2 15jun 17.pdf 1,240 × 1,754, 33 pages; 1.93 MB
- PDP P27-1 22mar 17.pdf 1,240 × 1,754, 34 pages; 1.17 MB
- PDP P26 5feb 17.pdf 1,240 × 1,754, 35 pages; 2.12 MB
- PDP P22 5feb 17.pdf 1,240 × 1,754, 35 pages; 2.09 MB
- PDP P25 22mar 17.pdf 1,240 × 1,754, 34 pages; 1.16 MB
- MoU DoF 25nov 14.pdf 1,272 × 1,754, 5 pages; 3.18 MB
- MoU DLS 30apr 14.pdf 1,277 × 1,756, 4 pages; 688 KB
- BGIF08 Acacia - Feasibility study Aquifer Recharge for Agriculture 25feb 15.pdf 1,240 × 1,754, 27 pages; 1.6 MB
- BGIF09 nhc FRERMIP - Final report Emergency protection works P29 23jun 18.pdf 1,240 × 1,754, 38 pages; 7.01 MB
- BGIF10 Nice Foundation - Improved Pig Hygiene in Kawra Community 13nov 16.pdf 1,240 × 1,754, 97 pages; 2.93 MB
- BGIF11 Deltares - Water App tool for water management decision making in P43 2B Jan2017.pdf 1,240 × 1,754, 99 pages; 5.39 MB
- BGIF12 MetaMeta - Roads for Water Management and Flood Protection Nov2017.pdf 1,753 × 1,240, 30 pages; 24.68 MB
- BGIF13 MarGen - Promoting Natural Cold Store mar 17.pdf 1,240 × 1,753, 56 pages; 3.71 MB
- BGIF14 FHRC - Pilot Community Based Water Management P43 2 and P29 Sep2017.pdf 1,240 × 1,754, 41 pages; 3.57 MB
- BGIF15 Just Farming - Increasing Quality in Mungbean Production 23oct 17.pdf 1,239 × 1,754, 21 pages; 640 KB
- BGIF16 Aspire-Insectsforall - Fish Feed using Insect Larvae 1nov 17.pdf 1,239 × 1,754, 85 pages; 902 KB
- BGIF17 No9 - Promoting Dutch SME entrepreneurship 23oct 17.pdf 1,241 × 1,756, 15 pages; 1.28 MB
- BGIF18 Consiglieri - Renewable Energy-Based Solutions 8aug 16.pdf 1,275 × 1,650, 70 pages; 2.37 MB
- BGIF19 Practical Action - Floating Cage Aquageoponics 8dec 17.pdf 1,240 × 1,754, 36 pages; 2.26 MB
- BGIF20 WorldFish - Ecopond and Empowerment Project II 8jan 18.pdf 1,275 × 1,650, 47 pages; 2.19 MB
- BGIF21 WorldFish - Low-Cost Tilapia Feed 30sep 17.pdf 1,240 × 1,754, 39 pages; 3.32 MB
- BGIF22A United Purpose - Feasibility Study WBCs Khulna 29oct 17.pdf 1,275 × 1,650, 23 pages; 509 KB
- BGIF22B United Purpose Phase II WBCs Final 16 Jan 19.pdf 1,240 × 1,754, 34 pages; 1.42 MB
- BGIF23 SBYA - Blue Gold Innovation Challange 12dec 17.pdf 1,240 × 1,754, 28 pages; 1.23 MB
- BGIF24 Moringa Ltd - Moringa Business Plan 11feb 18.pdf 1,240 × 1,753, 31 pages; 1.43 MB
- BGIF25 ProPortion& GrameenIntel - Commercialising Agricultural Extension Services Feb2018.pdf 1,239 × 1,754, 39 pages; 3.22 MB
- BGIF26A United Purpose - Feasibility study SWIFT 17apr 18.pdf 1,240 × 1,754, 57 pages; 2.36 MB
- BGIF26B United Purpose SWIFT Phase II Completion Report (May 2018 - Feb 2019) mar 19.pdf 1,275 × 1,650, 37 pages; 4.58 MB
- BGIF27A Innovision - Feasibility Study Pangasius aquaculture 21may 18.pdf 1,275 × 1,650, 40 pages; 1,004 KB
- BGIF27B Innovision Final Report Pangasius aquaculture 31jan 19.pdf 1,275 × 1,650, 48 pages; 5.23 MB
- BGIF28 BSMRAU P2 Pen Culture mar 18.pdf 1,275 × 1,650, 30 pages; 1.58 MB
- BGIF29 mPower breeed identification and digital registry FINAL REPORT 11nov 19.pdf 1,275 × 1,650, 38 pages; 3.03 MB
- BGIF30 MetaMeta-JJS-AA Horizontal Learning Evaluation Report 17feb 20.pdf 1,240 × 1,754, 22 pages; 2.35 MB
- BGIF QPR Jan-Mar 2015 apr 15.pdf 1,275 × 1,650, 4 pages; 232 KB
- BGIF QPR Apr-Jun 2015 jul 15.pdf 1,275 × 1,650, 4 pages; 251 KB
- BGIF QPR Oct-Dec 2015 3mar 16.pdf 1,240 × 1,754, 21 pages; 658 KB
- BGIF booklet 29may 18.pdf 1,240 × 1,754, 26 pages; 10.28 MB
- BGIF booklet Jan 2020.pdf 1,240 × 1,753, 24 pages; 6.68 MB
- Bgp-sec-a-ch01-fig-map-01.jpg 1,858 × 1,312; 902 KB
- Fig 2 -1 BGP with BWDB divi boundaries.png 843 × 596; 681 KB
- Test 20201117.png 200 × 200; 2 KB
- Icon-farm.png 512 × 512; 25 KB
- Icon-wage.png 512 × 512; 16 KB
- Icon-migration.png 512 × 512; 28 KB
- Error creating thumbnail: File with dimensions greater than 12.5 MPBGP district upazila opt 3oct 18.png 6,622 × 4,677; 8.08 MB
- Blue gold program overview map.jpg 4,960 × 3,507; 1.57 MB
- WP5 - Theory of Change rev 2 25may 16.pdf 1,240 × 1,754, 42 pages; 3.13 MB
- Overview.jpg 4,960 × 3,507; 2.02 MB
- Water level pressure divers (April 2018 - June 2019).png 605 × 393; 227 KB
- Figure 17.5.png 851 × 436; 239 KB
- Figure 17.5 (updated).png 1,174 × 657; 423 KB
- WP08E Report on Participatory Monitoring Oct 2018 iss 26jan 19.pdf 1,240 × 1,754, 89 pages; 2.12 MB
- Gender 3apr 17 guideline for courtyard sessions.pdf 1,240 × 1,754, 6 pages; 943 KB
- Gender 3mar 18 experience sharing event P55 2A.pdf 1,240 × 1,754, 12 pages; 1 MB
- Gender 6mar 19 proposed approach to GLD training.pdf 1,240 × 1,754, 11 pages; 775 KB
- Gender 7nov 16 feminization of agriculture.pdf 1,240 × 1,754, 4 pages; 821 KB
- BGIF22C 25jun 20 Final Report WBC Phase 3 United Purpose.pdf 1,240 × 1,754, 20 pages; 2.83 MB
- BGIF26C 23jun 20 SWIFT Phase III Final Report United Purpose.pdf 1,240 × 1,754, 24 pages; 2.58 MB
- BGIF31 1jun 20 PCR Sustaining Sack Farming Practices Practical Action.pdf 1,240 × 1,753, 32 pages; 18.16 MB
- BGIF32 29nov 20 Final Report BGIF-KU WH project.pdf 1,240 × 1,754, 50 pages; 1.61 MB
- BGIF33 17aug 20 FINAL PROJECT REPORT BG CAMASMA CIMMYT BD.pdf 1,275 × 1,650, 37 pages; 2.06 MB
- CAWM 2nov 20 Case Study gajendrapur bangla.pdf 1,240 × 1,753, 4 pages; 16.81 MB
- CAWM 26mar 20 gajendrapur design report.pdf 1,240 × 1,754, 39 pages; 3.72 MB
- CAWM 29oct 20 gajendrapur final construction report.pdf 1,275 × 1,650, 14 pages; 7.79 MB
- CGIAR 2014 Unlocking the production potential of the polders of coastal zone of Bangladesh.pdf 1,240 × 1,753, 32 pages; 1.15 MB
- DoF Fisheries Consultant Final Report Mar02,2020.pdf 1,240 × 1,753, 88 pages; 3 MB
- DoF Presentation Mar 02, 2020.pdf 1,500 × 1,125, 43 pages; 4.43 MB
- EIA P27 jan 20.pdf 1,240 × 1,754, 159 pages; 8.04 MB
- EIA P28-1 jan 20.pdf 1,240 × 1,754, 165 pages; 8.95 MB
- EIA P28-2 jan 20.pdf 1,240 × 1,754, 161 pages; 8.64 MB
- EIA P34-2 jan 20.pdf 1,240 × 1,754, 177 pages; 9.2 MB
- EIA P55 2A jan 20.pdf 1,240 × 1,754, 153 pages; 6.86 MB
- EIA Report Polder 25 aug 20.pdf 1,240 × 1,754, 155 pages; 10.03 MB
- EIA Report Polder 47 3 aug 20.pdf 1,240 × 1,754, 146 pages; 7.4 MB
- EIA Report Polder 47-4 aug 20.pdf 1,240 × 1,754, 148 pages; 7.75 MB
- EIA Report Polder 55 2C aug 20.pdf 1,240 × 1,754, 147 pages; 8.87 MB
- Gender 7oct 18 summary of PSTU students' report.pdf 1,240 × 1,754, 4 pages; 662 KB
- Gender 8mar 18 celebrating international women's day.pdf 1,240 × 1,754, 2 pages; 691 KB
- Gender 8mar 20 celebrating international women's day.pdf 1,240 × 1,754, 3 pages; 952 KB
- Gender 9nov 18 pilot joint UP WMG WE workshops.pdf 1,240 × 1,754, 8 pages; 1.01 MB
- Gender 11mar 14 gender approach based on inception report.pdf 1,754 × 2,480, 12 pages; 935 KB
- Gender 12nov 13 network meeting gender water management and food security.pdf 1,240 × 1,754, 15 pages; 2.34 MB
- Gender 15apr 18 PSTU final report of gender analysis.pdf 1,240 × 1,754, 29 pages; 1.58 MB
- Gender 15apr 18 Report IFMC Gender Activities Review.pdf 1,275 × 1,650, 25 pages; 1.22 MB
- Gender 17may 18 earning money is key to WE hilde janssen.pdf 2,480 × 1,753; 206 KB
- Gender 21jan 18 rapid assessment GLD mourie nishad.pdf 1,240 × 1,754, 12 pages; 952 KB
- Gender 23oct 17 antiharassment policy.pdf 1,240 × 1,754, 2 pages; 546 KB
- Gender 24may 19 women's workload.pdf 1,240 × 1,754, 15 pages; 196 KB
- Gender 24oct 18 women's wages compared to men.pdf 1,240 × 1,754; 429 KB
- Gender 26jul 19 impact of HL poultry rearing.pdf 1,240 × 1,754, 3 pages; 494 KB
- Gender 30may 16 feedback on pilot GLD and 3 month planning.pdf 1,240 × 1,754, 7 pages; 798 KB
- Gender 2016 report on pilot GLD training.pdf 1,240 × 1,754, 8 pages; 1.09 MB
- Gender jun 18 BWDB gender action plan draft final.pdf 1,240 × 1,754, 20 pages; 989 KB
- Gender jun 18 flipchart.pdf 1,987 × 1,455, 36 pages; 2.68 MB
- Gender jun 18 women in agriculture flipchart.pdf 1,987 × 1,455, 22 pages; 7.43 MB
- GoB National Agricultural Extension Policy (NAEP) 2012.pdf 1,275 × 1,722, 53 pages; 3.04 MB
- GoB National Agricultural Policy 2018.pdf 1,240 × 1,754, 35 pages; 657 KB
- O&M 16jul 19 evolution of catchment planning.pdf 1,240 × 1,754, 2 pages; 587 KB
- O&M Guideline v5 5jan 18.pdf 1,240 × 1,754, 77 pages; 6.6 MB
- OT int7 Proposal Training Life Cycle Costing and Design for Water Systems.pdf 1,240 × 1,754, 6 pages; 108 KB
- PR 28jul 20 HYPR January-June 2020.pdf 1,240 × 1,754, 96 pages; 1.52 MB
- Research 8feb 12 less noise in the household the impact of farmer field schools on gender relations.pdf 1,275 × 1,650, 12 pages; 129 KB
- Research 30mar 17 summary impact of FFSs on gender relations in Kenya.pdf 1,240 × 1,754, 2 pages; 439 KB
- UN nov 15 Satkhira Waterlogging Meta-Review Report.pdf 1,275 × 1,650, 55 pages; 2.65 MB
- Figure 24.4.jpg 1,517 × 1,073; 545 KB
- Section e diagram@2x.png 3,539 × 1,952; 173 KB
- Gender IFMC-II proposed Gender Strategy Final.pdf 1,240 × 1,754, 7 pages; 982 KB
- Gender KNKS apr 17 GLD report with annexes.pdf 1,275 × 1,650, 290 pages; 2.26 MB
- Research 2014 Imposition of Participation dewan buisson mukherji.pdf 1,240 × 1,754, 25 pages; 921 KB
- SVC 20mar 16 Information needs of smallholder sesame farmers.pdf 1,240 × 1,754, 58 pages; 2.09 MB
- WB may 16 Dynamics of Rural Growth in Bangladesh-final-Booklet.pdf 2,876 × 12,844; 3.4 MB
- WP7 Polder Growth & Business Development.KtJ 31aug 16.pdf 1,239 × 1,754, 29 pages; 1.39 MB
- WP9 Gender Approach v1 19sep 16.pdf 1,239 × 1,754, 61 pages; 984 KB
- OT int8 SIIL workshop bangkok Polder tidings v1 nr2 dec 16.pdf 1,275 × 1,650, 16 pages; 6.89 MB
- OT int9 OPPO course Wageningen syllabus.pdf 1,240 × 1,754, 2 pages; 103 KB
- Figure 32.1.png 753 × 425; 51 KB
- Bgif-project-locations.jpg 1,659 × 1,172; 464 KB
- Bgif-project-locations-pi.jpg 1,741 × 1,230; 478 KB
- Bengali-agricultural-calendar-v2.2-secured.pdf 0 × 0; 495 KB
- BGP slide deck women's empowerment in BGP v6.pdf 1,500 × 843, 27 pages; 11.22 MB
- BGP case study water heroes v2.1.pdf 1,240 × 1,753, 2 pages; 2.4 MB
- BGP case study collective action v2.3.pdf 1,240 × 1,753, 2 pages; 1.8 MB
- BGP case study women's empowerment and gender equality v4.pdf 1,240 × 1,753, 2 pages; 1.5 MB
- 14jan 21 DAE Shafoloter Shat Kahon.pdf 1,087 × 1,425, 162 pages; 19.72 MB
- Bgp-llr-call-for-action-8p-v1.7.pdf 1,240 × 1,753, 8 pages; 1.73 MB
- 27feb 21 WMO unified development of WMOs.pdf 1,240 × 1,754, 5 pages; 658 KB
- 2jun 20 LCS report Final Formatted.pdf 1,240 × 1,754, 74 pages; 1.54 MB
- 6feb 20 O&M Agreement signing ceremony Khulna.pdf 1,275 × 1,756, 9 pages; 6.44 MB
- TR14 Phase 1 Baseline Survey Report.pdf 1,240 × 1,754, 115 pages; 4.44 MB
- P29 BGP erosion presentation.pdf 1,754 × 1,240, 9 pages; 3.49 MB
- O&M Agreement signing ceremony Patuakhali.pdf 1,240 × 1,754, 7 pages; 1.37 MB
- OT DWA Advanced Level Design and LCC syllabus.pdf 1,240 × 1,754, 26 pages; 694 KB
- BGIF Call for Proposals - Funding Window 1.pdf 1,275 × 1,650, 18 pages; 229 KB
- O&M Agreement Signing Ceremony Satkhira.pdf 1,240 × 1,753, 14 pages; 3.1 MB
- 23jan 19 O&M Agreement signing ceremony Patuakhali.pdf 1,275 × 1,650, 6 pages; 1.26 MB
- 23sep 18 O&M Agreement signing ceremony Khulna.pdf 1,275 × 1,650, 5 pages; 1.03 MB
- P29 key messages to workshop with slides.pdf 1,240 × 1,754, 10 pages; 1.89 MB
- BGIF Evaluation Process First Call for Proposals v2.0.pdf 1,275 × 1,650, 6 pages; 409 KB
- TN FFS Cycle 14.pdf 1,240 × 1,754, 27 pages; 1.11 MB
- O&M Agreement approved Eng ver recd 6aug 18.pdf 1,240 × 1,754, 8 pages; 445 KB
- DFID Conceptual Framework on Agriculture.pdf 1,239 × 1,754, 36 pages; 2.51 MB
- OT DWA Mission Report - Reconnaissance mission Bangladesh - 16-28 January 2015 ....pdf 1,239 × 1,754, 31 pages; 486 KB
- O&M Agreement P47 3 Bangla version.pdf 1,275 × 1,435, 8 pages; 4.23 MB
- Evolution of water management in coastal Bangladesh.pdf 1,027 × 1,464, 18 pages; 406 KB
- 19feb 21 BGP cap build courses.pdf 1,240 × 1,754; 222 KB
- BGP 4 pager commercialisation of farming v8.pdf 1,240 × 1,753, 4 pages; 5.39 MB
- BGP 4 pager Fisheries v3.8.pdf 1,240 × 1,753, 4 pages; 9.37 MB
- BGP 4 pager IPWM v3.pdf 1,240 × 1,753, 4 pages; 7.56 MB
- BGP 4 pager lessons learnt v7.pdf 1,240 × 1,753, 4 pages; 6.43 MB
- BGP 4 pager Livestock v9.4.pdf 1,240 × 1,753, 4 pages; 6.76 MB
- BGP 4 pager food security v2.10.pdf 1,240 × 1,753, 4 pages; 4.31 MB
- BGP 4 pager WMO v3.pdf 1,240 × 1,753, 4 pages; 5.52 MB
- Bgp-4-pager-outcomes-v9.pdf 1,240 × 1,753, 4 pages; 5.59 MB
- Bgp-4-pager-wrm-v1.1.pdf 1,240 × 1,753, 4 pages; 7.64 MB
- Bgp-slide-deck-ipwm-v2.pdf 1,500 × 843, 28 pages; 12.73 MB
- BGP slide deck lessons learnt v8.pdf 1,500 × 843, 31 pages; 13.98 MB
- BGP slide deck outcomes v8.pdf 1,500 × 843, 24 pages; 9.09 MB
- Bgp-slide-deck-commercialisation-of-farming-base-slides-v1.3.pdf 1,500 × 843, 11 pages; 3.45 MB
- Bgp-slide-deck-commercialisation-of-farming-long-v4.1.pdf 1,500 × 843, 36 pages; 13.81 MB
- BGP slide deck WMO v4.pdf 1,500 × 843, 15 pages; 5.64 MB
- Bgp-slide-deck-homestead-ffs-v2.pdf 1,500 × 843, 16 pages; 7.17 MB
- BGP case study Rudhaghara CII v3.pdf 1,240 × 1,753, 2 pages; 2.81 MB
- BGP case study CAWM Uttar Khekuani v4.pdf 1,240 × 1,753, 2 pages; 1.85 MB
- BGP case study SVC fisheries v5.pdf 1,240 × 1,753, 2 pages; 3.09 MB
- BGP case study commercialisation of farming activities in polder 22 v5.pdf 1,240 × 1,753, 2 pages; 3.04 MB
- Bgp-case-study-lcs-v3.pdf 1,240 × 1,753, 2 pages; 3.32 MB
- Bgp-case-study-svc-rice-v3.1.pdf 1,240 × 1,753, 2 pages; 8.8 MB
- BGP case study impact of WRM at Amodkhali Satkhira v1.pdf 1,240 × 1,753, 2 pages; 2.49 MB
- BGP case study women in leadership v3.0.pdf 1,240 × 1,753, 2 pages; 1.77 MB
- BGP case study horizontal learning poultry v4.2.pdf 1,240 × 1,753, 2 pages; 2.46 MB
- BGP case study WMO v2.pdf 1,240 × 1,753, 2 pages; 2.33 MB
- A1-1 Community Organization & Cooperatives Aug 25-30 2013.pdf 1,275 × 1,650, 25 pages; 1.25 MB
- 3dec 20 WM Manual picture based-reduced.pdf 1,753 × 1,240, 56 pages; 16.28 MB
- 3dec 20 WM Manual text based-reduced.pdf 1,240 × 1,753, 60 pages; 11.26 MB
- A1-3.1 OM Training polder-22.pdf 1,240 × 1,753, 38 pages; 2.29 MB
- 22dec 20 bgp-sswmi-guidelines-v1.4.4-reduced.pdf 1,240 × 1,753, 29 pages; 6.3 MB
- A1-3.2 OM Trg completion Re (P-43 2A).pdf 1,240 × 1,753, 43 pages; 2.26 MB
- A1-3.3 OM Training SUS.pdf 1,240 × 1,754, 3 pages; 956 KB
- A1-3.4 OM Training Performance Evaluation.pdf 1,240 × 1,754, 35 pages; 1.36 MB
- A1-4 Crash Training Program on BGP UA Jan15 2017.pdf 1,240 × 1,754, 51 pages; 2.49 MB
- 26feb 21 WMO alt developing WMOs.pdf 1,275 × 2,100, 4 pages; 661 KB
- A1-5 Workshop on Refocussing WMG Capacity Building.pdf 1,240 × 1,754, 28 pages; 1.5 MB
- A1-8 Action Planning Workshop for WMA Apr-Jun 2019.pdf 1,275 × 1,650, 16 pages; 857 KB
- A1-9 ToF on Community Development Facilitators.pdf 1,275 × 1,650, 8 pages; 873 KB
- A2-1 Accounts Keeping & Audit System Jun 2016.pdf 1,275 × 1,650, 4 pages; 674 KB
- A2-2.2 Savings & Credit Management (Training Completion Report).pdf 1,240 × 1,753, 40 pages; 1.68 MB
- A2-2.1 Savings and Credit Management (Piloting).pdf 1,275 × 1,650, 11 pages; 1.26 MB
- A3-1.1 Management of Agricultural Macheneries (MAM) Khulna.pdf 1,240 × 1,754, 26 pages; 1.61 MB
- A3-1.2 Management of Agricultural Macheneries (MAM) Patuakhali.pdf 1,240 × 1,754, 26 pages; 1.62 MB
- A3-1.3 MAM Training Evaluation Report Khulna & Patuakhali.pdf 1,275 × 1,650, 22 pages; 1.4 MB
- B-1 LCS Training Report Patuakhali.pdf 1,275 × 1,650, 17 pages; 1.77 MB
- B-2.1 ToT on Const Mgmt for LCS Patuakhali 20-21 Jan 2014.pdf 1,275 × 1,650, 10 pages; 618 KB
- B-2.2 ToT on Const Magt for LCS Khulna 22-23 Jan 2014.pdf 1,275 × 1,650, 10 pages; 824 KB
- B-3 ToT on CM&QC 2014.pdf 1,275 × 1,650, 7 pages; 597 KB
- B-5.1 PDP Workshop Agenda Dhaka Mar 10, 2014.pdf 1,275 × 1,650; 362 KB
- B-5.2 PDP workshop Polder 43 2F May 20 2014.pdf 1,240 × 1,753, 7 pages; 359 KB
- B-5.3 PDP Polder 22 April 23, 2014.pdf 1,240 × 1,754, 83 pages; 3.51 MB
- B-6 Training on CM&QC May 2015.pdf 1,275 × 1,650, 3 pages; 802 KB
- CII overview 7apr 21.pdf 1,753 × 1,240; 263 KB
- Input provider overview 7apr 21.pdf 2,480 × 1,753; 551 KB
- SW overview 7apr 21.pdf 1,753 × 2,480; 540 KB
- FT overview 4apr 21.pdf 2,480 × 1,753; 546 KB
- BGP overview polders districts upazilas roads 7apr 21.pdf 2,480 × 1,753; 551 KB
- FFS overview map 7apr 21.pdf 2,480 × 1,753; 555 KB
- Upazila union on 4 overview maps 7apr 21.pdf 1,753 × 2,480, 4 pages; 1.11 MB
- BGIF overview 7apr 21.pdf 4,966 × 3,507, 2 pages; 2.3 MB
- CAHW overview 4apr 21.pdf 1,753 × 1,240; 2.78 MB
- Unions mouzas at polder level 4apr 21.pdf 1,753 × 2,480, 22 pages; 3.58 MB
- Input providers at polder level 7apr 21.pdf 1,753 × 2,480, 18 pages; 4.71 MB
- CAHW polder maps 4apr 21.pdf 1,753 × 2,480, 20 pages; 6.1 MB
- FT polder maps 4apr 21.pdf 1,753 × 2,480, 22 pages; 6.18 MB
- WMGs at polder level 6apr 21.pdf 2,480 × 3,507, 22 pages; 6.28 MB
- Resource farmers by polder 7apr 21.pdf 1,753 × 2,480, 21 pages; 7.27 MB
- FFS polder maps 7apr 21.pdf 1,753 × 2,480, 22 pages; 8.5 MB
- Market growth centre polder maps 4apr 21.pdf 2,480 × 3,507, 22 pages; 8.86 MB
- Infra rehab maps by polder 7apr 21.pdf 2,480 × 3,507, 22 pages; 9.52 MB
- Catchment maps at polder level 7apr 21.pdf 1,753 × 2,480, 76 pages; 22.99 MB
- C-1.1 Curriculum Dev. Workshop (30-10-2013).pdf 1,275 × 1,650, 17 pages; 339 KB
- C-1.2 Curriculum Development Workshop Compilation report.pdf 1,240 × 1,754, 40 pages; 1.04 MB
- C-2 Curriculum Development Workshop on BGP for DAE.pdf 1,240 × 1,754, 33 pages; 612 KB
- C-3.1 Draft Training report for CPW (January 13 to 24, 2019 ) at Khulna & Patuakhali.pdf 1,240 × 1,754, 29 pages; 2.24 MB
- C-3.2 Development CPW Compilation of all curriculum.pdf 1,240 × 1,754, 40 pages; 1.04 MB
- C-4 ToT for FFS organizer on Bief Fateining - Khulna (1-5 June 14).pdf 1,240 × 1,754, 35 pages; 2.16 MB
- C-5 Orientation cum ToT on Homestead Poultry, Nutrition Module.pdf 1,275 × 1,650, 74 pages; 568 KB
- C-7 Development CLW Training 22-27 Feb 2018.pdf 1,240 × 1,754, 23 pages; 1.73 MB
- C-6 Curriculum Development Workshop on vaccination Feb 22-27, 2018.pdf 1,240 × 1,754, 23 pages; 1.73 MB
- C-8 Training Fruit Tree Management ( Nuresery owner+FO).pdf 1,275 × 1,650, 2 pages; 337 KB
- C-9.1 Water and Land use Workshop P 55-2A.pdf 1,240 × 1,754, 24 pages; 2.78 MB
- C-9.2 Water and Land Use Workshop P 55-2C.pdf 1,240 × 1,754, 35 pages; 4.77 MB
- C-10 ToT forr FFS organizer on Dairy Module Sathkira 04.05.16.pdf 1,275 × 1,650, 24 pages; 472 KB
- C-11 District Level Workshop for DoF & DLS officials.pdf 1,275 × 1,650; 144 KB
- C-12 ToT on Bief Fattening-Fish Nutrition with Market Orientation.pdf 1,275 × 1,650, 3 pages; 215 KB
- C-13.1 2nd batch training report FT-Khulna-Final-SL-18.1.pdf 1,240 × 1,754, 43 pages; 1.65 MB
- C-13.2 3rd batch training report FT-Patuakhali -12.11.17.pdf 1,240 × 1,754, 33 pages; 1.52 MB
- C-13.3 4th batch training info FT Khulna V02-Final (12.11.17).pdf 1,240 × 1,754, 15 pages; 1.44 MB
- D-1 Training on Value chain & efficient magt of agri macheneries (for COs).pdf 1,275 × 1,650, 19 pages; 1.4 MB
- D-4 TOT for Producer Group Facilitators on MFS.pdf 1,240 × 1,753, 52 pages; 3.9 MB
- D-6 Refresher Trg on Market Orientation for PFs.pdf 1,275 × 1,650, 12 pages; 972 KB
- D-5 Training on Market Orientated FFS (10 days).pdf 1,275 × 1,650, 37 pages; 2.36 MB
- D-7 Training on Market Orientation for DAE FFS Facilitators.pdf 1,240 × 1,753, 18 pages; 883 KB
- D-8.1 Krishi upokoron Bebohar Retailors Training - Khulna.pdf 1,275 × 1,650, 6 pages; 779 KB
- D-8.2 Krishi Upokoron Bebohar Retailors Training - Patuakhali.pdf 1,240 × 1,753, 5 pages; 572 KB
- D-9 Experience sharing & coordination workshop Barguna.pdf 1,240 × 1,753, 7 pages; 593 KB
- D-10.1 2nd batch training report -FT-Khulna-Final.pdf 1,240 × 1,754, 41 pages; 1.65 MB
- D-10.2 3rd batch training report -FT-Patuakhali -12.11.17.pdf 1,240 × 1,754, 32 pages; 1.52 MB
- D-10.3 4th batch training info -FT-Khulna-V02-Final-(12.11.17).pdf 1,240 × 1,754, 14 pages; 1.44 MB
- D-11 Vagetable Post harvest value chain...skill dev training.pdf 1,275 × 1,650, 11 pages; 919 KB
- D-13 Strengthening Value Chain Strategic Workshop.pdf 1,275 × 1,650, 8 pages; 263 KB
- D-15 Vegetables Post Harvest Handling, Management and Business Skill Development Training.pdf 1,275 × 1,650, 4 pages; 828 KB
- D-16 Training on Knowledge Improvement of Mango Farmers Satkhira.pdf 1,240 × 1,753, 3 pages; 180 KB
- D-17 Knowledge improvement training for ...climate resilient at Satkhira.pdf 1,240 × 1,754, 3 pages; 841 KB
- D-18 Linkage building workshop between WMA-Public Private Sector.pdf 1,275 × 1,650, 2 pages; 353 KB
- D-19.1 Seminar for promotion of Bashak leaves supply chain development.pdf 1,275 × 1,650, 8 pages; 798 KB
- D-19.2 Seminar on Promotion of Bashak leaves supply chain development.pdf 1,240 × 1,753, 2 pages; 632 KB
- E-1.1 CAWM Orientation Pat Khu 30-31 May & 4-5 Jun 2016.pdf 1,240 × 1,754, 18 pages; 1.18 MB
- E-1.2 CAWM Orientation Patuakhali 16-17 Jul 2017.pdf 1,275 × 1,650, 16 pages; 1.37 MB
- WP6 MRL Plan 31aug 16.pdf 1,239 × 1,754, 34 pages; 940 KB
- MRL messages associated with polder dashboard 30sep 19 eng.pdf 1,240 × 1,754, 10 pages; 1.18 MB
- MRL polder dashboard with analysis 30sep 19 eng.pdf 1,240 × 1,754, 10 pages; 1.18 MB
- WMG tracker mPower presentation 25oct 17.pdf 1,754 × 1,240, 7 pages; 1.33 MB
- WP9A WMG Tracker Report without annexes to June 2017 23nov 17.pdf 1,240 × 1,754, 23 pages; 1.6 MB
- WP11A WMO self-monitoring Q3-2020 28dec 20.pdf 1,240 × 1,754, 43 pages; 1.72 MB
- WP11B WMO self-monitoring Q4-2020 25mar 21 opt.pdf 1,240 × 1,754, 46 pages; 1.86 MB
- MF P26 master file 30sep 15.pdf 1,240 × 1,754, 68 pages; 2.1 MB