Search results

From Blue Gold Program Wiki
  • In the ToC, this link is explored and provides an important step towards understanding the processes involved.’ Although the benefits of the ToC and the
    29 KB (4,086 words) - 16:03, 16 December 2021
  • gained during the development of a ‘Theory of Change’ (ToC) in 2016. The 2016 Theory of Change (ToC) describes five main development pathways that comprise
    46 KB (6,223 words) - 15:49, 16 December 2021
  • key message of this section is that presently, Bangladesh does not use the full potential of participatory water management for engendering local economic
    10 KB (1,236 words) - 05:50, 19 December 2021
  • met and that they have equal access to opportunities for realizing their full potential as human beings. gender indicators Gender indicators are performance
    52 KB (7,933 words) - 10:45, 12 January 2022
  • File:WP5 - Theory of Change rev 2 25may 16.pdf (matches file content)
    Herpers, Geert Rhebergen, Guy Jones Shital Das and Proteeti Masud First full ToC WP Niels van den Berge This document is issued for the party which commissioned
    (1,240 × 1,754 (3.13 MB)) - 03:56, 24 November 2020
  • insufficient, or because the gates never achieved full closure. Some examples are provided: (a) In P55/2C, the flap gates were installed on the country-side
    44 KB (4,821 words) - 06:00, 19 December 2021
  • Management Organisations (79%) and Labour Contracting Societies (13%). A full listing of all capacity building courses is also provided (see note 2 to
    24 KB (2,655 words) - 15:51, 16 December 2021
  • submit full proposals (two for climate smart adaptation agri-technologies and four for the removal of excessive water hyacinth).  Of the six full proposals
    20 KB (2,745 words) - 16:13, 16 December 2021
  • potential targets at outcome level – and actions required to move towards full achievement of the targets. Working papers WP10 use information collected
    22 KB (2,464 words) - 16:06, 16 December 2021
  • the continued serviceability of the infrastructure are currently not met in full - because O&M budgets with government organisations such as BWDB are – inevitably
    13 KB (1,815 words) - 11:26, 19 December 2021
  • standard for good practices, water management manuals (pictorial version and full-text version) have been developed, in particular for the use by the executive
    30 KB (4,038 words) - 14:56, 16 December 2021
  • polders (eg where World Bank’s CEIP-1 designs allowed for incorporation of the full effects of climate change). Go for greater flexibility – Don’t categorise
    37 KB (4,767 words) - 02:42, 7 December 2021
  • without walls”. In FFS, groups of twenty-five farmers meet regularly during one full production cycle with a facilitator, observe from the trials, discuss, ask
    70 KB (8,460 words) - 15:42, 16 December 2021
  • intermediate-scale infrastructure, there is a missing link in the process of realising the full agricultural potential of coastal polders. There are a number of organisations
    71 KB (10,547 words) - 14:33, 16 December 2021
  • project should be extended to end-December 2021 to allow for an additional full construction season in 2020/21 and to allow the subsequent processing of
    16 KB (2,029 words) - 03:32, 9 November 2021
  • projects; and execute water related projects on behalf of any public agency with full technical, administrative and financial control of the project. BWDB was
    32 KB (3,802 words) - 11:05, 19 December 2021
  • designs are prepared by the BWDB Design Circles. There are three types of full flood protection embankment aimed to prevent entry into the polder of the
    19 KB (2,179 words) - 07:36, 8 December 2021
  • bidders who offered an excellent conceptual design but which didn’t fulfil the full scope were coached to further develop their proposals to address the evaluation
    16 KB (2,332 words) - 16:23, 16 December 2021
  • collection point or organising joint transport, but remained generally short of full joint marketing due to issues of trust or real or perceived quality differences
    42 KB (5,160 words) - 11:50, 21 November 2021
  • problems independently. The activities take place in the field during one full production cycle with a facilitator, with groups of 25 farmers, who observe
    23 KB (3,334 words) - 05:54, 19 December 2021
  • to represent smallholder producers. Their priorities e.g. for timely and full drainage during and after the monsoon, are better represented than in situations
    31 KB (4,504 words) - 15:47, 16 December 2021
  • potential for scaling-up and commercialisation. While a few did indeed follow the full trajectory, most started at the feasibility stage but did not progress further
    33 KB (4,397 words) - 16:21, 16 December 2021
  • earnings reported by men and women were quite similar, i.e. about 350 BDT/full working day. Decision making on spending LCS income was usually joint, i
    47 KB (6,336 words) - 15:44, 16 December 2021
  • the designated lead technical BGP advisors to individual BGIF projects were full time employed by BGP and therefore also didn’t require additional reimbursements
    15 KB (1,101 words) - 06:49, 28 July 2020
  • allocations to be based on a volumetric basis and ensure full and transparent payment and accounting, (iv) full electrification of the pumping to reduce the operational
    76 KB (11,297 words) - 11:04, 23 November 2020
  • training (both with targets of 40,000). The staffing schedule included a full-time national gender expert and a part-time international gender expert.
    92 KB (11,673 words) - 08:08, 19 November 2021
  • met and that they have equal access to opportunities for realizing their full potential as human beings. gender indicators Gender indicators are performance
    13 bytes (7,933 words) - 11:32, 21 April 2021
  • NWPo promoted an approach including social and environmental considerations, full participation of stakeholders and affected people in planning, and institutional
    32 KB (4,632 words) - 06:53, 23 November 2020
  • File:ARM Aide Memoire 2-14oct 2016 31oct 16.pdf (matches file content)
    recommended a (modest) update of the ToC, a very intensive effort (more than expected) was undertaken. The theory of change (ToC) was updated with contributions
    (1,239 × 1,754 (4.25 MB)) - 10:54, 22 July 2020
  • The Blue Gold lessons learnt report (LLR) will be completed in full at project closure at end-December 2021. Meanwhile, in order to pass on the knowledge
    48 KB (5,884 words) - 12:21, 2 September 2021
  • File:WP9 Gender Approach v1 19sep 16.pdf (matches file content)
    in Blue Gold strategies and approaches (e.g. the CWM strategy and revised ToC) and commented on numerous documents, such as Innovation Fund concept notes
    (1,239 × 1,754 (984 KB)) - 19:50, 16 December 2020
  • File:PP TA ARM Discussion Paper 2016 1oct 16.pdf (matches file content)
    thin the polders –  so that BWDB and DAE field staff and LGIs can play a full role in polder planning and implementation  processes – and thus sustain
    (1,239 × 1,754 (812 KB)) - 09:40, 2 July 2020
  • File:ARM Aide Memoire 27Sep-13Oct 2015.pdf (matches file content)
     full  development  trajectory  from   concept  note  through  scoping,  feasibility,  demonstration,  piloting  to  full  scale
    (1,240 × 1,753 (6.1 MB)) - 06:55, 15 April 2020
  • File:WP6 MRL Plan 31aug 16.pdf (matches file content)
    of reflection and reassessing the ToC is not an MRLteam-only responsible, but shall be owned and supported by the full BGP TA and key partners. The Theory
    (1,239 × 1,754 (940 KB)) - 13:20, 20 April 2021
  • File:Bgp-llr-printable-edition-20211219.pdf (matches file content)
    Qty Qty Total Qty Qty (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) 2.80 63.42 220.88
    (1,240 × 1,753 (20.78 MB)) - 06:04, 20 December 2021
  • NWPo promoted an approach including social and environmental considerations, full participation of stakeholders and affected people in planning, and institutional
    41 KB (6,021 words) - 17:46, 21 November 2020
  • File:TR27 Impact of Blue Gold Program draft final 24apr 21.pdf (matches file content)
    developed on a comprehensive framework/development pathway/theory of change (ToC). This comprehensive framework enabled continuous assessment of the performance
    (1,240 × 1,754 (3.04 MB)) - 08:46, 11 May 2021
  • File:PR jul dec 2015 HPR-Half-Yearly Progress Report Jul-Dec 2015.Final.pdf (matches file content)
    FTR 29 C4 to Khulna C3 to Khulna C1 to Khulna C4 to Patuakhali C3 to Patuakhali C1+C5 to Patuakhali C5 to Patuakhali C1 + C5 to Patuakhali C1 + C2 + BWDB
    (1,240 × 1,754 (3.83 MB)) - 19:25, 8 July 2020
  • File:GoN Program Document BGP 28Aug12.pdf (matches file content)
    Gold at least 200 cooperatives will operate as an effective enterprise in full support of their member’s objectives of higher income. 7 Blue Gold: Program
    (1,239 × 1,754 (3.77 MB)) - 19:23, 8 July 2020
  • File:PR jan jun 2016 HYPR Jan-Jun 2016 9sep 16.pdf (matches file content)
    FTR 01 C4 to Khulna FTR 02 C3 to Khulna FTR 03 C1 to Khulna FTR 04 C4 to Patuakhali FTR 05 C3 to Patuakhali FTR 06 C1+C5 to Patuakhali FTR 07 C5 to Patuakhali
    (1,240 × 1,754 (3.36 MB)) - 10:40, 22 July 2020
  • File:BGP 4 pager IPWM v3.pdf (matches file content)
    infrastructure (SSWMI-fund) has been initiated under BGP. WMGs and WMAs get full responsibility for planning and construction of the infrastructure, to ensure
    (1,240 × 1,753 (7.56 MB)) - 11:11, 15 March 2021
  • File:IR Inception Report, revised March 2014.pdf (matches file content)
    for IPSWAM Polders & Full course for other Polders RT for IPSWAM Polders & Full course for other Polders RT for IPSWAM Polders & Full course for other Polders
    (1,275 × 1,650 (4.35 MB)) - 10:48, 22 July 2020
  • File:GoB BWDB PWMR 2014 (english) 11feb 14.pdf (matches file content)
    Name of the member: 2. Name of father/ husband: 3. Name of mother…………………… 4. Full address…………………… 5. Membership member according to the Member Register ……………………
    (1,240 × 1,754 (998 KB)) - 12:39, 8 July 2020
  • File:BGIF15 Just Farming - Increasing Quality in Mungbean Production 23oct 17.pdf (matches file content)
    unfavorable weather conditions. • While Just Farming could not establish a full relationship with premium clients, a small margin from selling the mungbean
    (1,239 × 1,754 (640 KB)) - 10:57, 22 July 2020
  • File:BGIF26C 23jun 20 SWIFT Phase III Final Report United Purpose.pdf
    BGIF26C 23jun_20 SWIFT Phase III Final Report United Purpose.pdf SWIFT Phase III Final Report BGIF26C
    (1,240 × 1,754 (2.58 MB)) - 19:42, 9 December 2020
  • File:BGIF11 Deltares - Water App tool for water management decision making in P43 2B Jan2017.pdf (matches file content)
    3.05 0.17 0.02 4.88 4.88 4964.78 part. full flow part. full flow full flow part. full flow part. full flow full flow ok ok ok ok ok too small Figure
    (1,240 × 1,754 (5.39 MB)) - 10:57, 22 July 2020
  • File:ARM Aide Memoire 25Nov-4Dec 2017 26feb 18.pdf (matches file content)
    connection between agriculture and water management that the DAE remains a full partner in the BGP. There are two options: (1) extend the DAE DPP till December
    (1,240 × 1,754 (1.43 MB)) - 10:54, 22 July 2020
  • File:TR14 Phase 1 Baseline Survey Report.pdf (matches file content)
    Baseline Survey Report 3. Team Structure Please refer to Work-plan details for full breakdown on team structure and team profiles. A brief outline of the general
    (1,240 × 1,754 (4.44 MB)) - 04:15, 10 March 2021
  • File:BGIF10 Nice Foundation - Improved Pig Hygiene in Kawra Community 13nov 16.pdf (matches file content)
    week Temperature 28.9°C Piglet for a month Piglet for two month 35°C 20-27.8°C Adult pigs weighing 90 kg or above 17.8-22.2°C Reproduction of pigs
    (1,240 × 1,754 (2.93 MB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19 edited.pdf (matches file content)
    project. BGP should also make every effort to ensure that sluices are under the full control of WMGs. (b) Aquaculture ghers: with paddy production now significantly
    (1,240 × 1,754 (3.77 MB)) - 08:20, 18 May 2021
  • File:BGIF07 World Fish - Ecopond Project - Women-Headed Small Household Ponds 28Dec2015.pdf (matches file content)
    25 & 26 27 & 28 29, 30 & 31 Contents Photos (1) Small homestead pond full with aquatic weeds (2) Small pond with high content of organic matters and
    (1,275 × 1,650 (4.3 MB)) - 10:57, 22 July 2020
  • File:TR25 Outcomes report WMG survey 2018 29oct 18.pdf (matches file content)
    higher increase in c.i. Both sources of data show that polder 30 only had a small increase in c.i. and here 45% of WMG reported a decline in c.i. with another
    (1,240 × 1,754 (1.76 MB)) - 10:37, 22 July 2020
  • File:TR29 outcomes report 2021 11nov 21.pdf (matches file content)
    to Table C1.1, if no, pls go to C2] [িথ্য সংগ্রকািীি েনয শনাে: যরদ C1 েযাাঁ েয় িােহল শেরবল C1.1 এি িথ্য সংগ্রে করুন, যরদ C1 না েহল দয়া কহি C2 িহল যান]
    (1,240 × 1,754 (4.6 MB)) - 08:27, 15 December 2021
  • File:TR24 2018 2019 CAWM Strategic Plan 16sep 18.pdf (matches file content)
    43/1A 43/2F 55/2A 55/2C 47/4 Name of CAWM/WMGs Giala Badhon Danga Kaikhali Fulbari Marichap Gosh Khali Hazi Khali Chalar Beal Full Bari Gopepagla Sener
    (1,240 × 1,754 (1.1 MB)) - 02:06, 12 July 2020
  • File:GoB WARPO Bangladesh Water Act 2013 (English).pdf (matches file content)
    of any other law for the time being in force, the Council may, for giving full effect to the cooperation mentioned under sub-section (2), give advice to
    (1,240 × 1,754 (432 KB)) - 05:48, 28 June 2020
  • File:BGIF24 Moringa Ltd - Moringa Business Plan 11feb 18.pdf (matches file content)
    strategy for us is a preliminary process to enter into the market with our full potential. It helps us to develop a way to maintain a work flow. The main
    (1,240 × 1,753 (1.43 MB)) - 10:57, 22 July 2020
  • File:BGIF05 CDI WUR - Opportunities for development of the Moringa sector Jul2015.pdf (matches file content)
    Leader, C-4 Investment Specialist, C-4 Deputy Component Leader, C-3 Business Development Coordinator, C-4 Business Development Coordinator, C-4 Agriculturist
    (1,240 × 1,753 (1.54 MB)) - 10:58, 22 July 2020
  • File:BGIF13 MarGen - Promoting Natural Cold Store mar 17.pdf (matches file content)
    Respondent’s full name (or name by which he/she is locally know): __________________________________________ FI2. Respondent’s Father’s/Husband’s full name (or
    (1,240 × 1,753 (3.71 MB)) - 10:57, 22 July 2020
  • File:PP TA ARM position paper 2018 3nov 18.pdf (matches file content)
    be used in calculating payments; (c) To be eligible for full payment, all earthwork sections must be achieved in full – including the height of embankment
    (1,240 × 1,754 (31.43 MB)) - 09:52, 2 July 2020
  • File:GoB MoWR National Water Policy January 1999.pdf (matches file content)
    through local consensus. c. For the Government will regulate the extraction of water in the identified sc~'rCI:tv zones with full public knowledge. d.
    (1,240 × 1,758 (6.9 MB)) - 19:41, 8 July 2020
  • File:2jun 20 LCS report Final Formatted.pdf (matches file content)
    rate for shrimp) 2 Full day 400 (and food) /500 (without food) 3 Full day 500/600 (and food) 300/400 (and food) 1.5 Full day/ hourly 400 (and
    (1,240 × 1,754 (1.54 MB)) - 11:52, 9 March 2021
  • File:TR20 2016 17 CAWM Strategic Plan 22 Sep 16.pdf (matches file content)
    to ensure a mind-set change. This starts with active communication how a full year cycle of successful cropping and water management can be realised and
    (1,239 × 1,754 (1.25 MB)) - 10:59, 22 July 2020
  • File:BGIF04 Groenemeijer WUR - Baseline P30 Community Water Management Pilot 28feb 15.pdf (matches file content)
    the livelihoods of the polder citizens. In their efforts to make use of the full potential of the polder system a community water management pilot project
    (1,240 × 1,754 (6.13 MB)) - 07:05, 12 July 2020
  • File:A2-2.1 Savings and Credit Management (Piloting).pdf (matches file content)
    the performance of that specific point found satisfactory then it will get full 3 point and Fair and Poor is 2 and 1 respectively. Around 26 numbers observation
    (1,275 × 1,650 (1.26 MB)) - 05:27, 19 April 2021
  • File:D-1 Training on Value chain & efficient magt of agri macheneries (for COs).pdf (matches file content)
    organizers to the workshop. She expressed that component one (1) will give full support for the workshop and also expressed her gratitude to the component
    (1,275 × 1,650 (1.4 MB)) - 09:45, 20 April 2021
  • File:A3-1.3 MAM Training Evaluation Report Khulna & Patuakhali.pdf (matches file content)
    as because it was all about technical. Part one need not to be part of a full flagged training. It could be covered within a general meeting but though
    (1,275 × 1,650 (1.4 MB)) - 05:34, 19 April 2021
  • File:G-2.2 UZ orientation Brief Note-Kalapara UZP.pdf (matches file content)
    Program especially the community involvement and gave his commitment and full support from Upazila Parishad to implement the Blue Gold Program. Conclusion
    (1,275 × 1,650 (770 KB)) - 05:49, 21 April 2021
  • File:PP TA ARM position paper 2017 18nov 17.pdf (matches file content)
    2018-2019 Plan for 2019-2020 Qty Full MBDT Qty Full Qty Part MBDT Qty Full Qty Part MBDT Qty Full Qty Part MBDT Qty Full Qty Part MBDT 360.00 546.72 210
    (1,240 × 1,754 (9.32 MB)) - 09:45, 2 July 2020
  • File:Research 2014 Imposition of Participation dewan buisson mukherji.pdf (matches file content)
    participatory water management and was implemented in nine out of 123 polders.1 Full-time socio-economists and community organisers spent 18 months mobilising
    (1,240 × 1,754 (921 KB)) - 19:40, 16 December 2020
  • File:BGIF09 nhc FRERMIP - Final report Emergency protection works P29 23jun 18.pdf (category NhC/FRERMIP) (matches file content)
    cross sections were surveyed in the first and second survey cycle. To get a full cross section, the above water part of the bank was surveyed with a RTK GPS
    (1,240 × 1,754 (7.01 MB)) - 10:57, 22 July 2020
  • File:BGIF28 BSMRAU P2 Pen Culture mar 18.pdf (matches file content)
    potential of pen culture in waterlogged conditions, but they failed to get the full benefit of fish culture due to either of shut down the fish culture for unexpected
    (1,275 × 1,650 (1.58 MB)) - 10:57, 22 July 2020
  • File:BGIF33 17aug 20 FINAL PROJECT REPORT BG CAMASMA CIMMYT BD.pdf (matches file content)
    briefed them about the project activities. Briefings were used to encourage full participation of DAE staff (see ‘ANNEX 2: October 2018 Progress Report’)
    (1,275 × 1,650 (2.06 MB)) - 19:54, 9 December 2020
  • File:F-1 Training on Water Management Org Apr 7-16 2014.pdf (matches file content)
    Apr 7-16, 2014 4 Duration of Training Course The course was designed for full of 6 days from April 7-16 2014. Everyday the training session was started
    (1,240 × 1,753 (975 KB)) - 19:21, 20 April 2021
  • File:PR jul dec 2017 BGP HYPR July-Dec 2017.pdf (matches file content)
    Achievements 2.1 Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (1.89 MB)) - 10:41, 22 July 2020
  • File:A1-4 Crash Training Program on BGP UA Jan15 2017.pdf (matches file content)
    implemented under the umbrella of WMG towards the goal of Blue Gold Program and its full or partly benefits distributed to all the members of this WMG, will be acknowledged
    (1,240 × 1,754 (2.49 MB)) - 08:02, 18 March 2021
  • File:WP03 Building organisation 2jun 16.pdf (matches file content)
    22, 2016 Blue Gold Program NDPD NoC NGO O&M PCD PD PDP PF PMC PSC SAAO SAE SDE SO SSSWRDSP SWAIWRPMP TA TL TNA ToC TOT UAO UDMC UP UZ VAP VC VCA VCD VCS
    (1,239 × 1,754 (1.31 MB)) - 10:59, 22 July 2020
  • File:BGIF27A Innovision - Feasibility Study Pangasius aquaculture 21may 18.pdf (matches file content)
    ……………………… 1.8 gvQ Pv‡l †Kvb cÖKvi cÖvwZôvwbK mn‡hvwMZv (cÖwkÿY/Avw_©K) jvf K‡i‡Qb (grm¨ Awa`ßi/weGdAviAvB/ GbwRI/ mwgwZ/cÖKí? 2. cyKz‡ii Z_¨ welq cyKz‡ii
    (1,275 × 1,650 (1,004 KB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19.pdf (matches file content)
    project. BGP should also make every effort to ensure that sluices are under the full control of WMGs. (b) Aquaculture ghers: with paddy production now significantly
    (1,240 × 1,754 (1.86 MB)) - 10:37, 22 July 2020
  • File:AWP 2018 19 Annual Work Plan 2018-2019 1aug 18.pdf (matches file content)
    km 50.87 km full & 17.93 km part 2 Embankment Retirement 15.50 km 4.00 km full & 11.50 km part 3 Canal Re-excavation 227.23 km full & 231.46 km
    (1,240 × 1,754 (2.84 MB)) - 10:53, 22 July 2020
  • File:C-4 ToT for FFS organizer on Bief Fateining - Khulna (1-5 June 14).pdf (matches file content)
    Deputy Component leader C3 thanked C4 expert for their orientation conduction with nice presentation. He said that C3 and C4 are like two brothers. So
    (1,240 × 1,754 (2.16 MB)) - 05:39, 20 April 2021
  • File:A1-5 Workshop on Refocussing WMG Capacity Building.pdf (matches file content)
    organization Communication skill Effective and Efficient Plan Preparation Meaning full relation with UP/ (Partnership Development) Team Work Knowledge on Agricultural
    (1,240 × 1,754 (1.5 MB)) - 05:14, 19 April 2021
  • File:BGIF20 WorldFish - Ecopond and Empowerment Project II 8jan 18.pdf (matches file content)
    Director, Department of Fisheries, Khulna Division pointed expressed his full cooperation in implementation of the Blue Gold Program in collaboration with
    (1,275 × 1,650 (2.19 MB)) - 10:57, 22 July 2020
  • File:BGIF18 Consiglieri - Renewable Energy-Based Solutions 8aug 16.pdf (matches file content)
    Installing solar module may require cutting some branches of trees to get full sunlight. This might be the single environmental consideration for SHS. It
    (1,275 × 1,650 (2.37 MB)) - 10:57, 22 July 2020
  • File:C-5 Orientation cum ToT on Homestead Poultry, Nutrition Module.pdf (matches file content)
    to understand whole modules and component 3 will start it field work with full strength. After that the main activities of the orientation cum ToT were
    (1,275 × 1,650 (568 KB)) - 05:40, 20 April 2021
  • File:BGIF26A United Purpose - Feasibility study SWIFT 17apr 18.pdf (matches file content)
    life cycle of the project with BWDB and DAE representatives demonstrating full cooperation and an alliance with the WMGs. Training providing by the project
    (1,240 × 1,754 (2.36 MB)) - 10:57, 22 July 2020
  • File:A3-1.1 Management of Agricultural Macheneries (MAM) Khulna.pdf (matches file content)
    welq (Subject of Evaluation) cÖwkÿ‡bi welq (Subject of Training) cÖwkÿY c×wZ I †KŠkj (Training Methods & Techniques) cÖwkÿKM‡Yi `ÿZv I †KŠkj (Knowledge
    (1,240 × 1,754 (1.61 MB)) - 05:34, 19 April 2021
  • File:BGIF32 29nov 20 Final Report BGIF-KU WH project.pdf (matches file content)
    critical comments and helpful suggestion that led to the development of a full proposal and subsequent approval by BGIF. We acknowledge the cooperation
    (1,240 × 1,754 (1.61 MB)) - 19:52, 9 December 2020
  • File:BGIF08 Acacia - Feasibility study Aquifer Recharge for Agriculture 25feb 15.pdf (matches file content)
    answered by constructing a pilot system and test its use during at least one full year 5.2 Design of the pilot scheme For the type of design of the system
    (1,240 × 1,754 (1.6 MB)) - 10:57, 22 July 2020
  • File:BGIF Procedures Manual v8 22may 18.pdf (matches file content)
    result of your submission might be a direct rejection or an invitation for a full proposal. The rejection or invitation might include a request for further
    (1,240 × 1,754 (2.41 MB)) - 09:44, 24 June 2020
  • File:TW01 Trend Watcher Issue 1 Dec 2016.pdf (matches file content)
    Re-Sectioning /Repair 551 180.98 km(full) 27.79 km (Part) Total : 208.77 km Retire Embankment Construction (Km) 4.58 2.84 (full) 1.74 (Part) Khal Re-excavation
    (1,275 × 1,650 (555 KB)) - 09:57, 1 July 2020
  • File:BGIF14 FHRC - Pilot Community Based Water Management P43 2 and P29 Sep2017.pdf (matches file content)
    ig a tio n R e s o u rc e s c a r c ity 3 . H o u s e h o ld c e n s u s nn - e co re s a n c l a is o c ia s ey rv su C o m m u n it y o r g a n is
    (1,240 × 1,754 (3.57 MB)) - 10:57, 22 July 2020
  • File:BGIF31 1jun 20 PCR Sustaining Sack Farming Practices Practical Action.pdf (matches file content)
    proportionately under two polders (number 47/3 and 47/4) for the study sample. The full data collection and analysis was completed by May 30th. The main objective
    (1,240 × 1,753 (18.16 MB)) - 19:49, 9 December 2020
  • File:P29 Deltares review of BWDB designs 30may 17.pdf (matches file content)
    et al, 1989). A.3 Bangladesh The FAP 21 project implemented and tested a full range of innovative bank protection structures along the Jamuna River in
    (1,240 × 1,754 (1.53 MB)) - 18:29, 8 July 2020
  • File:18feb 21 BGIF booklet practical innovations in CZ v4.5.pdf (matches file content)
    natural pond conditions. The two major challenges to implement the findings at full scale were: • Farmers in Bangladesh can overstock ponds and apply excessive
    (1,240 × 1,753 (26.16 MB)) - 15:51, 14 November 2021
  • File:F-3 Foundation Training Participatory Water Mgmt May 2-8 2017.pdf (matches file content)
    0……………0…………22 b. Relevant-……………………………………………………………….….0……….…….0……….….2…………21 c. Full filament your expectation-……………………………………..1……………..0…………..0………..20 3. Training
    (1,240 × 1,754 (1.27 MB)) - 19:09, 20 April 2021
  • File:PR Jan-Mar 2014 14may 14.pdf (matches file content)
    replication. C1, C2 & C3 to include gender in functionality assessments and needs assessments, and orientation for household survey; C4 includes gender
    (1,240 × 1,754 (1.89 MB)) - 10:40, 22 July 2020
  • File:TN06 Sajna (Moringa Oleifera) Cuttings 23dec 15.pdf (matches file content)
    Applications All parts of the tree can be used in a variety of ways. Sajna is full of nutrients and vitamins and is good in our food as well as in the food
    (1,239 × 1,754 (480 KB)) - 10:11, 2 July 2020
  • File:TNR int6 Multilevel Water Governance 4 15apr 2016.pdf (matches file content)
    starting line for everyone. Equity has the goal of providing everyone with the full range of opportunities and benefits – the same finish line. Gender mainstreaming
    (1,240 × 1,754 (2.34 MB)) - 05:01, 6 May 2021
  • File:WP08A participatory monitoring red 28feb 17.pdf (matches file content)
    r�development�and�to�evaluate�their�progress�(or�shortcomings)�towards�a�full� achievement.�Based�on�their�monitoring�results,�the�WMGs�can�also�make�
    (1,239 × 1,754 (5.98 MB)) - 04:46, 28 July 2020
  • File:CAWM 26mar 20 gajendrapur design report.pdf (matches file content)
    Minizing head loss Under extreme hydraulic conditions, the culvert flows full and is outlet controlled. With nomograph 15A (FHWA, Hydraulic Design of Highway
    (1,240 × 1,754 (3.72 MB)) - 20:00, 9 December 2020
  • File:BGIF00 Twynstra&Gudde - study of WMOs as cooperatives.pdf (matches file content)
    to the projects under the Bangladesh Water Development Board. Although the full implications 11| 12| CDSP IV 2013, Mission Report No 4 Field Level Institutions
    (1,275 × 1,650 (762 KB)) - 10:58, 22 July 2020
  • File:C-1.2 Curriculum Development Workshop Compilation report.pdf (matches file content)
    (minimum 150 participants). Here not that floor will be open to all for fruit full discussion and to enrich FFS activities that which will be very helpful to
    (1,240 × 1,754 (1.04 MB)) - 05:31, 20 April 2021
  • File:C-3.2 Development CPW Compilation of all curriculum.pdf (matches file content)
    (minimum 150 participants). Here not that floor will be open to all for fruit full discussion and to enrich FFS activities that which will be very helpful to
    (1,240 × 1,754 (1.04 MB)) - 05:37, 20 April 2021
  • File:Feb 15 CAWM P30 baseline pilot martina groenemeijer feb 15.pdf (matches file content)
    the livelihoods of the polder citizens. In their efforts to make use of the full potential of the polder system a community water management pilot project
    (1,240 × 1,754 (6.08 MB)) - 13:49, 20 April 2021
  • File:A2-2.2 Savings & Credit Management (Training Completion Report).pdf (matches file content)
    of the WMG members 97 WGMs keep re records transparently and member have full trust on their records provided by the WMGs concerned person (Cashier), by
    (1,240 × 1,753 (1.68 MB)) - 05:27, 19 April 2021
  • File:GoB BWDB Act 2000 (english translation).pdf (matches file content)
    water related project on behalf of any public agency, as "deposit work" with full technical, administrative and financial control of the project. 12. Functions
    (1,239 × 1,754 (54 KB)) - 05:18, 28 June 2020
  • File:EIA Report Polder 55 2C aug 20.pdf
    EIA Report - Polder 55/2C EIA Report Polder 55_2C aug_20.pdf
    (1,240 × 1,754 (8.87 MB)) - 20:29, 9 December 2020
  • File:ARM Aide Memoire 23Aug-5Sep 2014.pdf (matches file content)
    production plan O&M plan Formation of LCS Progressively taking over partial/full responsibility of water management In case of irrigation: Administrative
    (1,240 × 1,753 (1.05 MB)) - 10:04, 13 April 2020
  • File:Research 8feb 12 less noise in the household the impact of farmer field schools on gender relations.pdf (matches file content)
    interesjournals.org/JRPGD Copyright ©2012 International Research Journals Full Length Research Paper Less noise in the household: the impact of Farmer
    (1,275 × 1,650 (129 KB)) - 16:55, 10 December 2020
  • File:WP08C participatory monitoring oct nov 2017 5apr 18.pdf
    WP8C: Participatory Monitoring Oct-Nov 2017 WP08D
    (1,240 × 1,754 (1.56 MB)) - 10:59, 22 July 2020
  • File:WP10A WMA Participatory Monitoring May 2019 5aug 19.pdf (matches file content)
    targets and to evaluate their performance (progress or shortcomings) towards a full achievement of those targets. 2. The WMAs assessed their progress against10
    (1,240 × 1,754 (11.83 MB)) - 10:59, 22 July 2020
  • File:EIA P34-2 jan 20.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (9.2 MB)) - 20:20, 9 December 2020
  • File:BGIF12 MetaMeta - Roads for Water Management and Flood Protection Nov2017.pdf (matches file content)
    Of the 19 surveyed sluice gates, 10 had some defects and do not allow for full water control. Moreover, inlets and outlets should be provided with gates
    (1,753 × 1,240 (24.68 MB)) - 10:57, 22 July 2020
  • File:EIA Report Polder 25 aug 20.pdf (matches file content)
    or more from the site in any full quadrant) 26 Socio-economic Condition Figure 5.6 (a): Wind Rose for Khulna for a Full Year Figure 5.6 (b): Wind Rose
    (1,240 × 1,754 (10.03 MB)) - 20:23, 9 December 2020
  • File:WP10B WMA Participatory Monitoring Oct 2019 23dec 19 opt.pdf (matches file content)
    development and to evaluate their performance (progress or shortcomings) towards a full achievement of those targets. 2. The WMAs assessed their progress against
    (1,240 × 1,754 (12.09 MB)) - 04:46, 28 July 2020
  • File:WP08D Report on Participatory Monitoring Apr-May 2018 v1 24jul 18.pdf (matches file content)
    ent by WMGs (indicated where it differs) B C B - C - C - B - A - B - B - C B B C C B C B B - 12 July 2018 40 Blue Gold Program
    (1,240 × 1,754 (2.04 MB)) - 10:59, 22 July 2020
  • File:EIA P55 2A jan 20.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (6.86 MB)) - 20:21, 9 December 2020
  • File:EIA Report Polder 47-4 aug 20.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (7.75 MB)) - 20:27, 9 December 2020
  • File:WP08G Report on Participatory Monitoring Oct 2019 15dec 19.pdf (matches file content)
    Assessme nt (indicated where it differs) C - B - B - C - C - A B C B D - A - C - A B C - A - D - B - The progress achieved
    (1,240 × 1,754 (2 MB)) - 18:42, 8 July 2020
  • File:EIA Report Polder 47 3 aug 20.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (7.4 MB)) - 20:26, 9 December 2020
  • File:EIA P30 CEGIS Sep 15.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (14.5 MB)) - 10:49, 22 July 2020
  • File:EIA P31 part CEGIS Jun 16.pdf (matches file content)
    or more from the site in any full quadrant) 43 Environmental Baseline Figure 5.6 (a): Wind Rose for Khulna for a Full Year Figure 5.6 (b): Wind Rose
    (1,240 × 1,754 (33.56 MB)) - 10:48, 22 July 2020
  • File:P29 FRERMIP Final report Emergency protection works P29 v5 23jun 18.pdf (matches file content)
    cross sections were surveyed in the first and second survey cycle. To get a full cross section, the above water part of the bank was surveyed with a RTK GPS
    (1,240 × 1,754 (3.09 MB)) - 19:10, 8 July 2020
  • File:EIA P26 CEGIS Jun 16.pdf (matches file content)
    or more from the site in any full quadrant) 48 Environmental Baseline Figure 5.6 (a): Wind Rose for Khulna for a Full Year Figure 5.6 (b): Wind Rose
    (1,240 × 1,754 (51.83 MB)) - 09:54, 30 June 2020
  • File:EIA P27 jan 20.pdf (matches file content)
    Field EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (8.04 MB)) - 20:12, 9 December 2020
  • File:MF P43 2F 27sep 18.pdf (matches file content)
    contri bution (b) contri bution (b) contrib bution (a) bution (a) ution C=a C=a C=ax xb xb b 1 22.00 59.75 1 59.75 15.75 1 15.75 1 39.5 32.75 1 32.75 7.25
    (1,240 × 1,754 (3.37 MB)) - 13:38, 20 April 2021
  • File:DFID Conceptual Framework on Agriculture.pdf (matches file content)
    agriculture it will mean a gradual reduction in time invested in farming (from full to part-time/weekend and/or from all to just a few family members) and a
    (1,239 × 1,754 (2.51 MB)) - 05:30, 10 March 2021
  • File:EIA P22 CEGIS Sep 15.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (12.37 MB)) - 10:49, 22 July 2020
  • File:EXT Agro-Insight report v13 3may 18.pdf (matches file content)
    a Blue Gold FFS only receive training on one or a few topics, not on the full range of information that BGP has to offer. The Program uses a large set
    (1,240 × 1,754 (2.15 MB)) - 10:49, 22 July 2020
  • File:EIA P28-2 jan 20.pdf (matches file content)
    in any full quadrant) 31 Socio-economic Condition (a): for Khulna for a Full Year (b): Wind Rose for Khulna from November to February (c): Wind Rose
    (1,240 × 1,754 (8.64 MB)) - 20:16, 9 December 2020
  • File:WP02A Exit Strategy feb 16 v2.pdf (matches file content)
    a tree today! Mott Mac cDonald is committed c to integrating ssustainability y into our operational praactices and culture. c As a world lead ding consulta
    (1,239 × 1,754 (562 KB)) - 03:59, 24 November 2020
  • File:WP08F report on Participatory Monitoring Apr 2019 v1 10jul 19.pdf (matches file content)
    Selfassessm ent by WMGs D E C D C C C C C D D E D B B C D B C Polder Team’s Assessment (indicated where it differs) D C B C D C April 2019 Blue Gold Program
    (1,240 × 1,754 (2.07 MB)) - 10:59, 22 July 2020
  • File:EIA P28-1 jan 20.pdf (matches file content)
    Rhamnaceae Gramineae VC C C C VC C VC 2 1 1 1 2 2 1 Tall monocot T T T T H T CL Mimisaceae C 2 T Rutaceae C 1 T Meliaceae C 2 T Khai Babla (Pithecolobium
    (1,240 × 1,754 (8.95 MB)) - 20:15, 9 December 2020
  • File:MF P2 master file 29jul 15.pdf (matches file content)
    (others) Wage rate Male Female Half day Full day Half day Full day 200 400 150 Female Not work 150 300 150 in full day 200 400 180 150 300 150 150 300 150
    (1,240 × 1,754 (2.8 MB)) - 13:37, 20 April 2021
  • File:EIA P43 2D CEGIS Jun 15.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,753 (16.63 MB)) - 10:49, 22 July 2020
  • File:EIA P43 2A CEGIS Jun 15.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (15.37 MB)) - 10:48, 22 July 2020
  • File:EIA P43 2B CEGIS Apr 16.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (14.46 MB)) - 10:49, 22 July 2020
  • File:ARM Aide Memoire 9-20Nov 2018 11jan 19.pdf (matches file content)
    proposals.  Substantially increasing the number of WMGs receiving almost full coverage Moreover, at polder level more is happening. During the field visit
    (1,240 × 1,754 (1.2 MB)) - 10:54, 22 July 2020
  • File:WP08E Report on Participatory Monitoring Oct 2018 iss 26jan 19.pdf (matches file content)
    10255_2C106 Rohitpura Khal 10255_2C107 Madhupura-Denath Khan Khal 10255_2C201 Kalyankalash Prodhan Khal 10255_2C202 Ulashir Khal 10255_2C203 Bashabaria
    (1,240 × 1,754 (2.12 MB)) - 08:49, 24 November 2020
  • File:EIA P43 2E CEGIS Apr 16.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (9.99 MB)) - 10:49, 22 July 2020
  • File:P29 IWM Final Report polder29 red 24may 16.pdf (matches file content)
    dumping of brick bats is suggested. The semi-permeable spur is designed by full blockage of 1.5 m from top. The remaining part of the spur has 40-50% blockage
    (1,239 × 1,754 (4.02 MB)) - 19:29, 8 July 2020
  • File:PR 28jul 20 HYPR January-June 2020.pdf (matches file content)
    Achievements 2.1 Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (1.52 MB)) - 16:52, 10 December 2020
  • File:O&M Guideline v5 5jan 18.pdf (matches file content)
    Routine b) Periodic c) Emergency a) Routine b) Periodic c) Emergency a) Routine b) Periodic c) Emergency a) Routine b) Periodic c) Emergency WMG / WMA
    (1,240 × 1,754 (6.6 MB)) - 16:24, 10 December 2020
  • File:PDP P25 22mar 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (1.16 MB)) - 10:48, 22 July 2020
  • File:27feb 21 WMO unified development of WMOs.pdf (matches file content)
    participating actively in the process of implementation of Project works on a full scale. Co-operation and consultation between the WMOs and BWDB/DAE/ DoF etc
    (1,240 × 1,754 (658 KB)) - 05:46, 9 March 2021
  • File:EIA P29 CEGIS Jun 16.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (20.54 MB)) - 11:20, 1 July 2020
  • File:EIA P2 CEGIS Jun 16.pdf (matches file content)
    Cr Cr Vu Vu Vu En Vu IUCN Status C En Vu Vu Cr En En C C C En Vu Vu C C En Vu - Source: Field Survey, 2015; Here- C-common, Vu- Vulnerable, En- Endangered
    (1,240 × 1,754 (9.51 MB)) - 10:53, 22 July 2020
  • File:EIA P43 1A CEGIS Apr 16.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (12.93 MB)) - 10:49, 22 July 2020
  • File:SVC 20mar 16 Information needs of smallholder sesame farmers.pdf (matches file content)
    classification. 3.3 Sources The sources for these needs are essential to create a full understanding of the information needs and their significance in the farmers’
    (1,240 × 1,754 (2.09 MB)) - 19:42, 16 December 2020
  • File:BGIF16 Aspire-Insectsforall - Fish Feed using Insect Larvae 1nov 17.pdf (matches file content)
    Fish Several experiments have shown that pre-pupae BSF could be a partial or full substitute for fish meal in fish diets in different jurisdictions. However
    (1,239 × 1,754 (902 KB)) - 10:57, 22 July 2020
  • File:EIA P43 2F CEGIS Jun 15.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (15.27 MB)) - 10:49, 22 July 2020
  • File:AWP 2017 18 BGPAnnualPlan20172018.pdf (matches file content)
    including underlying assumptions in the Results Chain, is included in the full Theory of Change2 As can be seen in the figure above, the Results Chain has
    (1,240 × 1,754 (6.78 MB)) - 10:53, 22 July 2020
  • File:P29 Lower Bhadra IWM river survey report 23jul 17.pdf (matches file content)
    Track: 13-May 2509000 Se c Se c ¯ Legend ... ... ... ... Se c Float Track: 14-May Bank Line Se c Se c Se c Se c Runlines Se c (-8.0) to (-6.0) (-6
    (1,275 × 1,650 (8.99 MB)) - 19:46, 8 July 2020
  • File:WP7 Polder Growth & Business Development.KtJ 31aug 16.pdf (matches file content)
    generally poor and prone to disasters. It would hereby avoid the drive towards a full-membership or alternatively a taxation of literally all living in a polder
    (1,239 × 1,754 (1.39 MB)) - 19:45, 16 December 2020
  • File:TR23 Phase II Socio-Economic Baseline Survey 31may 18.pdf (matches file content)
    However, the highest percentage (13.4) of this category households reported of full male control decision making tendency, the percentage were slightly lower
    (1,275 × 1,650 (5.24 MB)) - 10:37, 22 July 2020
  • File:WP11A WMO self-monitoring Q3-2020 28dec 20.pdf (matches file content)
    development; they have been evaluating their progress (or shortcomings) towards a full achievement of those targets. As they did the PM exercise, the WMOs had BGP
    (1,240 × 1,754 (1.72 MB)) - 16:05, 20 April 2021
  • File:MF P22 master file 15jun 14.pdf (matches file content)
    16 16 16 17 17 17 17 18 Vi vii viii Ix X c. i. ii. iii. iv. v. B. I Ii Iii iv 4. 4.a 4.b 4.c 5. 6. a. b. c. d. 7. 8. 8.1 8.2 9. 10. 11. 12. Farmers Category
    (1,240 × 1,754 (2.11 MB)) - 13:28, 20 April 2021
  • File:WP11B WMO self-monitoring Q4-2020 25mar 21 opt.pdf (matches file content)
    development; they have been evaluating their progress (or shortcomings) towards a full achievement of those targets. As they did the PM exercise, the WMOs had BGP
    (1,240 × 1,754 (1.86 MB)) - 16:05, 20 April 2021
  • File:TN 04 Local Poultry Value chain Analysis.pdf (matches file content)
    as it should be. Local Poultry Value Chain The value chain describes the full range of activities which are required to bring a product or service from
    (1,240 × 1,754 (957 KB)) - 04:46, 28 July 2020
  • File:Gender 24may 19 women's workload.pdf (matches file content)
    interviews with 12 women collected detailed data on their time use on the full day before the interview (the “recall day”), for which purpose a time diary
    (1,240 × 1,754 (196 KB)) - 15:51, 10 December 2020
  • File:19dec 19 BGIF Lessons Learnt draft v3.pdf (matches file content)
    the designated lead technical BGP advisors to individual BGIF projects were full time employed by BGP and therefore also didn’t require additional reimbursements
    (1,240 × 1,754 (2.12 MB)) - 04:34, 23 February 2020
  • File:MF P43 1A master file 4aug 15.pdf (matches file content)
    farming households, their association and other market actors to capture the full benefit of this increase in polder productivity. This component seeks to
    (1,275 × 1,650 (2.51 MB)) - 13:32, 20 April 2021
  • File:TR09 WMOs Comparative Analysis 28apr 14.pdf (matches file content)
    improvement plan in consultation with WMOs. a) b) c) d) e) a) b) c) d) e) f) a) b) c) d) e) f) g) a) b) c) d) Scheme selection on analysis of scheme performance
    (1,240 × 1,754 (741 KB)) - 10:59, 22 July 2020
  • File:BGIF06 Greyshack - Feasibility study on renewable energy Dec2015.pdf (matches file content)
    girls • Providing light for reading or studying beyond daylight. complete a full course of • Creating a more child-friendly environment (access to clean
    (1,275 × 1,650 (7.82 MB)) - 10:57, 22 July 2020
  • File:PDP P43-2B 5feb 17.pdf (matches file content)
    Training C-9 Training on Savings and Credits management 2015-2016 WMG 27 done WMG 5 done Through outsourcing C-2 2.1 2.2 2.3 2.4 2.5 2.6 2.6 C-3 C-4 C-5
    (1,240 × 1,754 (2.56 MB)) - 10:48, 22 July 2020
  • File:BGIF QPR Apr-Jun 2016 2sep 16.pdf (matches file content)
    Partners Component Fund type C3 Productive  Sector Fund C3 + C4 Productive  Sector Fund C3 + C4 Productive  Sector Fund C2 Productive  Sector Fund
    (1,754 × 1,239 (234 KB)) - 09:53, 24 June 2020
  • File:PDP P55-2C 15jun 17.pdf
    Polder Development Plan for Polder 55/2C PDP
    (1,240 × 1,754 (2.61 MB)) - 10:40, 22 July 2020
  • File:BGIF QPR Apr-Jun 2018 2aug 18.pdf (matches file content)
    Action Aid to further develop their concept note on Unpaid Care Work into a full proposal (see Chapter 4). Concepts/proposals rejected Unfortunately, we
    (1,240 × 1,754 (890 KB)) - 06:07, 28 June 2020
  • File:DEM Khulna 2, 26 & 31part IWM (Jul 2015).pdf (category File used in Part C: Water Infrastructure) (matches file content)
    because of active Manga river. In order to achieve improve drainage of the full catchment by this regulator, it needs to be renovated by increased vent number
    (1,240 × 1,754 (3.48 MB)) - 10:57, 1 July 2020
  • File:BGIF QPR Oct-Dec 2016 7feb 17.pdf (matches file content)
    pared by Deltares in December  2014, a full feasibility study led by Deltares is intended to  examine the full case for intervention using pumped drainage
    (1,754 × 1,239 (300 KB)) - 10:59, 29 June 2020
  • File:OT DWA Advanced Level Design and LCC syllabus.pdf (matches file content)
    manufacturer of valves, gates, etc. Biddinghuizen Delft region Sept. 16 Full day Maintenance Planning Exercise Theory of LCC design, exercise. Wim
    (1,240 × 1,754 (694 KB)) - 04:25, 10 March 2021
  • File:WP08B participatory monitoring v4 20nov 17.pdf (matches file content)
    their development and to evaluate their progress (or shortcomings) towards a full achievement. Based on their monitoring results, the WMGs can also make their
    (1,240 × 1,754 (2.3 MB)) - 10:59, 22 July 2020
  • File:BGIF QPR Jul-Sep 2018 15Oct 18.pdf (matches file content)
    most promising. During Q3-2018, the respective organisations developed a full proposal. The proposal evaluation committee under leadership of Dr. Wais
    (1,240 × 1,754 (880 KB)) - 10:53, 29 June 2020
  • File:TR19 Improved Water Management - CWM Pilot P30 22sep 16.pdf (matches file content)
    a tree today! Mott Mac cDonald is committed c to integrating ssustainability y into our operational praactices and culture. c As a world lead ding consulta
    (1,239 × 1,754 (2.13 MB)) - 08:44, 11 May 2021
  • File:MF P29 master file 4nov 14.pdf (matches file content)
    Involvement: The objective of Business development component is;To capture the full benefit of this increase in polder productivity the farming households, their
    (1,240 × 1,754 (3.97 MB)) - 13:43, 20 April 2021
  • File:PR jan jun 2018 HYPR Jan-June 2018 26jul 18.pdf (matches file content)
    Achievements 2.1 Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (2.35 MB)) - 10:40, 22 July 2020
  • File:P29 Deltares Erik Mosselmann P29 Review of IWM study 8jan 16.pdf (matches file content)
    4 Selection of measures The selection of measures has not considered the full range of possible options. Considerations of costs are missing too. Table
    (1,240 × 1,753 (683 KB)) - 06:03, 28 June 2020
  • File:PDP P55-2A 15jun 17.pdf (matches file content)
    Continues process 2015-May 2017 2015-May 2017 C. Agricultural and Marketing Services C-1 C-2 C-3 C-4 Activities to improve crop production: a. FFS
    (1,240 × 1,754 (2.33 MB)) - 10:40, 22 July 2020
  • File:TR07 Field Trip Reports 2013 15apr 14.pdf (matches file content)
    completed IPSWAM polders. XEN also expressed his full support and cooperation in the Blue Gold activities. c. Meeting with XEN of BWDB Khulna O&M Division
    (1,275 × 1,650 (2.21 MB)) - 10:37, 22 July 2020
  • File:TR16A Field Trip Reports from 2014 5may 15.pdf (matches file content)
    the FFS as strong sides: a) Got full cooperation from the COs and WMG members, b) Could organize Community Meeting nicely, c) Farmers have given enough time
    (1,240 × 1,754 (3.05 MB)) - 10:37, 22 July 2020
  • File:EIA P34 2 BWDB Sep 19.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (7.54 MB)) - 10:49, 22 July 2020
  • File:PR jan jun 2019 Half Yearly Progress Report Jan-Jun 2019.docx.pdf (matches file content)
    & Achievements Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (2.85 MB)) - 19:06, 8 July 2020
  • File:PDP P30 5feb 17.pdf (matches file content)
    13 V1 – 22 November 2016 Blue Gold Program 4.6 4.7 C-5 C-6 6.1 6.2 6.3 C-7 C-8 C-9 C-10 C-11 Fingerling production Refresher training for contact
    (1,240 × 1,754 (2.4 MB)) - 10:48, 22 July 2020
  • File:PR Jul-Sep 2014 19nov 14.pdf (matches file content)
    FTR 01 C4 to Khulna FTR 02 C3 to Khulna FTR 03 C1 to Khulna FTR 04 C4 to Patuakhali FTR 05 C3 to Patuakhali FTR 06 C1+C5 to Patuakhali FTR 07 C5 to Patuakhali
    (1,240 × 1,754 (1.75 MB)) - 10:40, 22 July 2020
  • File:PDP P22 5feb 17.pdf (matches file content)
    November 2016 Blue Gold Program 4.2 4.3 4.4 4.5 4.6 C-5 C-6 6.1 6.2 6.3 C-7 C-8 C-9 C-10 C-11 C-12 Livestock vaccine cold chain at WMG/WMA level Community
    (1,240 × 1,754 (2.09 MB)) - 10:48, 22 July 2020
  • File:PDP P43-2F 5feb 17.pdf (matches file content)
    effective Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (1.88 MB)) - 10:41, 22 July 2020
  • File:PDP P43-2A 5feb 17.pdf (matches file content)
    Through outsourcing 2.2 2.3 2.4 2.5 2.6 2.7 C-3 3.1 3.2 3.3 3.4 3.5 3.6 3.6 3.7 C-4 4.1 4.2 4.3 4.4 C-5 C-6 C-7 T. Aman 2 Continuous process Mungbean
    (1,240 × 1,754 (2.67 MB)) - 10:48, 22 July 2020
  • File:PDP P31part 5feb 17.pdf (matches file content)
    2.1 2.2 2.3 2.4 2.5 C-3 3.1 3.2 3.3 C-4 4.1 4.2 4.3 4.4 4.5 4.6 C-5 C-6 C-7 Activities to improve crop production FFS on homestead garden (vegetables)
    (1,240 × 1,754 (2.02 MB)) - 10:48, 22 July 2020
  • File:EIA P55 2A BWDB Sep 19.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (6.23 MB)) - 10:49, 22 July 2020
  • File:BGIF QPR Jan-Mar 2018 30apr 18.pdf (matches file content)
    development, the following can be considered as high potential to develop a full proposal (For more information see Chapter 4): ■ Acacia – Pilot for Managed
    (1,240 × 1,754 (686 KB)) - 10:25, 29 June 2020
  • File:PDP P43-1A 5feb 17.pdf (matches file content)
    2016 Blue Gold Program C. Agricultural and Marketing Services C-1 C-2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 C-3 3.1 3.2 3.3 3.4 3.5 3.6 C-4 Fruit tree plantation
    (1,240 × 1,754 (2.49 MB)) - 10:48, 22 July 2020
  • File:PR jul dec 2019 HYPR jul dec19 final.pdf (matches file content)
    & Achievements Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (2.29 MB)) - 18:53, 8 July 2020
  • File:AWP 2016 AnnualPlan201617V2.pdf (matches file content)
    including underlying assumptions in the Results Chain, is included in the full Theory of Change 4. As can be seen in the figure above, the Results Chain
    (1,240 × 1,754 (9.75 MB)) - 10:53, 22 July 2020
  • File:EIA P27 BWDB Sep 19.pdf (matches file content)
    Field EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (7.81 MB)) - 10:19, 30 June 2020
  • File:PDP P43-2D 5feb 17.pdf (matches file content)
    November, 2016 Blue Gold Program C. Agricultural and Marketing Services C-1 C-2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 C-3 3.1 Fruit tree plantation at homestead
    (1,240 × 1,754 (3.22 MB)) - 10:48, 22 July 2020
  • File:PDP P26 5feb 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (2.12 MB)) - 10:48, 22 July 2020
  • File:MF P43 2B master file 7jul 15.pdf (matches file content)
    by 1 vial 100 ducks can be vaccinated (if they can buy in group then the full vial can be used). There is a scope to involve the paravet in the business
    (1,275 × 1,650 (3.47 MB)) - 13:40, 20 April 2021
  • File:PDP P29 5feb 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (2.5 MB)) - 10:48, 22 July 2020
  • File:PDP P43-2E 5feb 17.pdf (matches file content)
    preferred FFSs. C. Agricultural and Marketing Services C-1 C-2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 C-3 3.1 3.2 3.3 3.4 3.5 3.6 C-4 C-5 C-6 C-7 C-8 C-9 Fruit tree
    (1,240 × 1,754 (2.32 MB)) - 10:41, 22 July 2020
  • File:MF P43 2D master file 20apr 15.pdf (matches file content)
    Batgachhi khal 3.0 24. Nakshar khal 1.0 Most of these drainage channels are now full of weeds and water hyacinth, and re-excavation will clean these out. Moreover
    (1,240 × 1,754 (4.51 MB)) - 13:46, 20 April 2021
  • File:TR18 Improved Water Management Pilot CWM P30 11jul 16.pdf (matches file content)
    drainage negatively influence the harvest time, and thus the possibility of a full Rabi Crop cycle afterwards. Next to blockages in the khals, the tidal water
    (1,240 × 1,754 (2.51 MB)) - 10:59, 22 July 2020
  • File:EIA P28 1 BWDB Sep 19.pdf (matches file content)
    Cr Cr Vu Vu Vu En Vu IUCN Status C En Vu Vu Cr En En C C C En Vu Vu C C En Vu - Source: Field Survey, 2017; Here- C-common, Vu- Vulnerable, En- Endangered
    (1,240 × 1,754 (7.9 MB)) - 10:49, 22 July 2020
  • File:BGIF QPR Jul-Sep 2016 29sep 16.pdf (matches file content)
    energy 17/09/2015 MetaMeta Biological rodent  control  Component C2 C5 C4 C2 + C5 C2 Fund type Productive  Sector Fund Productive  Sector Fund Productive 
    (1,754 × 1,239 (277 KB)) - 10:42, 29 June 2020
  • File:PDP P47-4 27aug 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (2.57 MB)) - 10:40, 22 July 2020
  • File:23jan 21 HYPR july december 2020.pdf (matches file content)
    & 15 nos. C.O 12 nos. C.O 1 no. new 2 nos. C.O 1 no. C.O 0.09 km C.O 13.45 km C.O LS 3,518 m new & 1,314 m C.O Insignificant progress Insignificant progress
    (1,240 × 1,754 (2.03 MB)) - 08:41, 11 May 2021
  • File:PDP P47-3 27aug 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (2.11 MB)) - 10:40, 22 July 2020
  • File:AWP 2019 20 Annual Work Plan 2019-2020 10jul 19.pdf (matches file content)
    37 km c/o work 404.53 km 131 nos. 81 nos. new & 50 nos. c/o 6 nos. 6 nos. new work 24 nos. new work & 6 nos. c/o work 3 nos. new work & 3 nos. c/o work
    (1,275 × 1,650 (3.06 MB)) - 10:53, 22 July 2020
  • File:PR Jan-Mar 2015.pdf (matches file content)
    Finalize Training Module on S&C Participate in organizing dry-run on S&C Piloting of S&C in Khulna and Patuakhali Organize S&C training at the WMG level
    (1,240 × 1,754 (3.6 MB)) - 10:40, 22 July 2020
  • File:MF P30 master file 15oct 14.pdf (matches file content)
    annual average temperature of 26.3 °C (79.3 °F) and monthly means varying between 12.4 °C (54.3 °F) in January and 34.3 °C (93.7 °F) in May. Annual average
    (1,240 × 1,754 (3.82 MB)) - 13:41, 20 April 2021
  • File:TW02 Trend Watcher 2 17oct 17.pdf (matches file content)
    common scenario in Bangladesh. But very few women able to convert this into a full-fledged business. That is what Mrs. Ruma did. Organic Process Of Producing
    (1,238 × 1,754 (974 KB)) - 11:26, 8 July 2020
  • File:PDP P34-2part 20aug 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (2.48 MB)) - 10:48, 22 July 2020
  • File:TR16B Field Trip Reports from 2014 5may 15.pdf (matches file content)
    Moury, RE (C-2)  Mainul Islam, CE(C-2)  Md. Azizur Rahman, Sr.QCE (C-2)  Md. Aman Ullah, SAE (C-2)  Md. Jashim Uddin, Socio-economist (C-1)  Umme Asma
    (1,240 × 1,754 (3.83 MB)) - 10:37, 22 July 2020
  • File:EIA P28 2 BWDB Sep 19.pdf (matches file content)
    EHS* Monitor of Consultant Field EHS Expert of Contractor (Full Name & Signature) (Full Name & Signature) *EHS- Environment Health & Safety *RE – Resident
    (1,240 × 1,754 (7.01 MB)) - 10:53, 22 July 2020
  • File:PDP P27-2 15jun 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (1.93 MB)) - 10:48, 22 July 2020
  • File:PR Oct-Dec 2014.pdf (matches file content)
    FTR 27 C4 to Khulna C3 to Khulna C1 to Khulna C4 to Patuakhali C3 to Patuakhali C1+C5 to Patuakhali C5 to Patuakhali C1 + C5 to Patuakhali C1 + C2 + BWDB
    (1,240 × 1,754 (3.24 MB)) - 10:40, 22 July 2020
  • File:PR jul dec 2018 BGP HYPR Jul-Dec 2018 final opt.pdf (matches file content)
    & Achievements Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (2.81 MB)) - 10:40, 22 July 2020
  • File:PDP P27-1 22mar 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (1.17 MB)) - 10:48, 22 July 2020
  • File:PDP P28-1 22mar 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (1.16 MB)) - 10:48, 22 July 2020
  • File:PR jan jun 2017 HYPR jan jun 2017 FINAL.pdf (matches file content)
    their development and to evaluate their progress (or shortcomings) towards full achievement. In PSA, WMGs assess their own performance on indicators related
    (1,240 × 1,754 (2.37 MB)) - 10:40, 22 July 2020
  • File:17sep 20 Annual Work Plan 2020-21.pdf (matches file content)
    including underlying assumptions in the Results Chain, is included in the full Theory of Change 2 As can be seen in the Figure 1, the Results Chain has
    (1,275 × 1,650 (4.01 MB)) - 08:42, 11 May 2021
  • File:BGIF QPR Apr-Jun 2017 9aug 17.pdf (matches file content)
    1st of October 2017, the shortlisted applicants will be invited to submit a full-fledged project proposal. The deadline for submission is 1st December 2017
    (1,754 × 1,240 (616 KB)) - 06:03, 28 June 2020
  • File:Riverbank protection oberhagemann 27oct 20.pdf (matches file content)
    (or unloading at the toe). Subsoil investigations often do not provide a full picture of the variability of the soil due to a limited number of boreholes
    (1,240 × 1,753 (6.9 MB)) - 08:48, 11 May 2021
  • File:OT DWA Mission Report - Reconnaissance mission Bangladesh - 16-28 January 2015 ....pdf (matches file content)
    farming households, their association and other market actors to capture the full benefit of this increase in polder productivity. This component seeks to
    (1,239 × 1,754 (486 KB)) - 05:32, 10 March 2021
  • File:BGIF booklet 29may 18.pdf (matches file content)
    Challenges and opportunities The two major challenges to implement the findings at full scale are: Upscaling potential 1. The farmers in Bangladesh have a tendency
    (1,240 × 1,754 (10.28 MB)) - 11:31, 12 July 2020
  • File:TR12 Partnership Strategy 2014-2019 11jan 15.pdf (matches file content)
    District and Upazila offices of DoC. Close cooperation between DoC and Blue Gold is needed. But these responsibilities of DoC have been shifted to BWDB through
    (1,240 × 1,754 (329 KB)) - 01:54, 12 July 2020
  • File:PR Apr-Jun 2015 5aug 15.pdf (matches file content)
    on S&C for WMG Participate in organizing dry-run on S&C in Patuakhali and Khulna Piloting of S&C in Khulna and Patuakhali Organize orientation on S&C Training
    (1,240 × 1,754 (4.11 MB)) - 10:40, 22 July 2020
  • File:GoB National Agricultural Extension Policy (NAEP) 2012.pdf (matches file content)
    • Temperature max. 34º C, min. 12º C. • Seasonally shallowly flooded by rain water. 2790 mm. • Temperature max. 34º C, min. 12º C. • Seasonally shallowly
    (1,275 × 1,722 (3.04 MB)) - 16:16, 10 December 2020
  • File:WP11C WMO self-monitoring Q1 2021 30may 21.pdf
    Working Paper 11C Self-monitoring of WMOs: a monitoring system for the future WP11C
    (1,240 × 1,754 (1.68 MB)) - 02:58, 19 October 2021
  • File:PR jul dec 2016 HYPR July to Dec 2016.04Aprl 17.pdf (matches file content)
    December 2016 C3 to Patuakhali C1+C5 to Patuakhali C5 to Patuakhali C1 + C5 to Patuakhali C1 + C2 + BWDB to Khulna and Patuakhali (TOT for LCS) C1 + C2 LCS Training
    (1,240 × 1,754 (5.05 MB)) - 10:40, 22 July 2020
  • File:TR 15 Communications Strategy 2015.pdf (matches file content)
    through various activities. In Dhaka the central Blue Gold office houses 33 full time staff functions and several part time consultants. The project has a
    (1,240 × 1,754 (724 KB)) - 10:37, 22 July 2020
  • File:TR05 Inventory Geoinformation Dec2013.pdf (matches file content)
    configuration and further requirements of the web-based system will be described in full detail in a proposal for implementation of a Lizard MIS and Information Portal
    (1,240 × 1,754 (1.29 MB)) - 02:08, 12 July 2020
  • File:PDP P28-2 15jun 17.pdf (matches file content)
    effective. Market transaction The exchange between demand and supply is at full market price (the price at which suppliers are prepared to sell and consumers
    (1,240 × 1,754 (2.14 MB)) - 10:48, 22 July 2020
  • File:OT Hague Academy Multi-Level Water Governance 4-15Apr2016.pdf (matches file content)
    starting line for everyone. Equity has the goal of providing everyone with the full range of opportunities and benefits – the same finish line. Gender mainstreaming
    (1,240 × 1,753 (1.41 MB)) - 10:48, 22 July 2020
  • File:PR Oct-Dec 2013 26feb 14.pdf (matches file content)
    Promotion & Planning) DoC Department of Cooperatives (DoC) BWDB b) Nityananda Chakravorty Deputy Team Leader Water Cell (PSSWRSP), DoC SWAIWRPMP (South West
    (1,240 × 1,754 (2.06 MB)) - 10:40, 22 July 2020
  • File:BGP women's empowerment case studies 25oct 21.pdf (matches file content)
    30/6/2018. They have completed the work with quality and timely, so they got the full payment through three installment, including the 10% security payment. However
    (1,275 × 1,650 (5.52 MB)) - 08:14, 16 November 2021
  • File:TR 13 BlueGold WMG LGI cooperation Report 05.pdf (matches file content)
    The intervention has effect: In half the WMGs activities are now back in full swing; whereas conflicts reduced significantly for the remaining WMGs, and
    (1,240 × 1,754 (1.17 MB)) - 03:58, 24 November 2020
  • File:TN20 FFS Cycle 9 May-Nov 2017 4apr 18.pdf (matches file content)
    Budharampur Khal 55_2c Alipura Doshmina Basar 521 Kamarkhali Khal 55_2c Bokulbaria Golachipa Basar 522 Rahitpura Khal 55_2C Alipura Doshmina
    (1,240 × 1,754 (2.32 MB)) - 04:47, 28 July 2020
  • File:TR04 Introduction to ME manual 11dec 13.pdf (matches file content)
    X C3 District X X C2 C1.1 C1.2 C1.3 C1.4 C1.5 C1.6 C1.7 C1.8 C1.9 C2.1 C2.2 C2.3 C2.4 C2.5 C2.6 C3.1 C3.2 C3.3 C3.4 C3.5 C3.6 C.7 C3.9 C3.10 C3.11
    (1,240 × 1,754 (934 KB)) - 10:37, 22 July 2020
  • File:PR Apr-Jun 2014 4aug 14.pdf (matches file content)
    2014 FTR 05 C3 to Patuakhali 27-31 Jan, 2014 FTR 06 C1+C5 to Patuakhali FTR 07 C5 to Patuakhali 10-13 Feb, 2014 FTR 08 C1 + C5 to Patuakhali
    (1,275 × 1,650 (1.06 MB)) - 10:40, 22 July 2020
  • File:TR28 Agricultural Changes 2013 20 v 23sep 21.pdf (matches file content)
    use in a different way. Because cropping intensity alone does not give the full picture, land that is converted to gher is also intensively used. • Vegetable
    (1,240 × 1,754 (1.98 MB)) - 04:59, 10 October 2021
  • File:UN nov 15 Satkhira Waterlogging Meta-Review Report.pdf (matches file content)
    discharge changes due to years. (proper algorithms in a computer model, the full spectrum of current and future and accurate water input/land-water climate
    (1,275 × 1,650 (2.65 MB)) - 17:05, 10 December 2020