Search results

From Blue Gold Program Wiki
  • In the ToC, this link is explored and provides an important step towards understanding the processes involved.’ Although the benefits of the ToC and the
    29 KB (4,086 words) - 16:03, 16 December 2021
  • gained during the development of a ‘Theory of Change’ (ToC) in 2016. The 2016 Theory of Change (ToC) describes five main development pathways that comprise
    46 KB (6,223 words) - 15:49, 16 December 2021
  • key message of this section is that presently, Bangladesh does not use the full potential of participatory water management for engendering local economic
    10 KB (1,236 words) - 05:50, 19 December 2021
  • met and that they have equal access to opportunities for realizing their full potential as human beings. gender indicators Gender indicators are performance
    52 KB (7,933 words) - 10:45, 12 January 2022
  • File:WP5 - Theory of Change rev 2 25may 16.pdf (matches file content)
    Herpers, Geert Rhebergen, Guy Jones Shital Das and Proteeti Masud First full ToC WP Niels van den Berge This document is issued for the party which commissioned
    (1,240 × 1,754 (3.13 MB)) - 03:56, 24 November 2020
  • insufficient, or because the gates never achieved full closure. Some examples are provided: (a) In P55/2C, the flap gates were installed on the country-side
    44 KB (4,821 words) - 06:00, 19 December 2021
  • Management Organisations (79%) and Labour Contracting Societies (13%). A full listing of all capacity building courses is also provided (see note 2 to
    24 KB (2,655 words) - 15:51, 16 December 2021
  • submit full proposals (two for climate smart adaptation agri-technologies and four for the removal of excessive water hyacinth).  Of the six full proposals
    20 KB (2,745 words) - 16:13, 16 December 2021
  • potential targets at outcome level – and actions required to move towards full achievement of the targets. Working papers WP10 use information collected
    22 KB (2,464 words) - 16:06, 16 December 2021
  • the continued serviceability of the infrastructure are currently not met in full - because O&M budgets with government organisations such as BWDB are – inevitably
    13 KB (1,815 words) - 11:26, 19 December 2021
  • standard for good practices, water management manuals (pictorial version and full-text version) have been developed, in particular for the use by the executive
    30 KB (4,038 words) - 14:56, 16 December 2021
  • polders (eg where World Bank’s CEIP-1 designs allowed for incorporation of the full effects of climate change). Go for greater flexibility – Don’t categorise
    37 KB (4,767 words) - 02:42, 7 December 2021
  • without walls”. In FFS, groups of twenty-five farmers meet regularly during one full production cycle with a facilitator, observe from the trials, discuss, ask
    70 KB (8,460 words) - 15:42, 16 December 2021
  • intermediate-scale infrastructure, there is a missing link in the process of realising the full agricultural potential of coastal polders. There are a number of organisations
    71 KB (10,547 words) - 14:33, 16 December 2021
  • project should be extended to end-December 2021 to allow for an additional full construction season in 2020/21 and to allow the subsequent processing of
    16 KB (2,029 words) - 03:32, 9 November 2021
  • projects; and execute water related projects on behalf of any public agency with full technical, administrative and financial control of the project. BWDB was
    32 KB (3,802 words) - 11:05, 19 December 2021
  • designs are prepared by the BWDB Design Circles. There are three types of full flood protection embankment aimed to prevent entry into the polder of the
    19 KB (2,179 words) - 07:36, 8 December 2021
  • bidders who offered an excellent conceptual design but which didn’t fulfil the full scope were coached to further develop their proposals to address the evaluation
    16 KB (2,332 words) - 16:23, 16 December 2021
  • collection point or organising joint transport, but remained generally short of full joint marketing due to issues of trust or real or perceived quality differences
    42 KB (5,160 words) - 11:50, 21 November 2021
  • problems independently. The activities take place in the field during one full production cycle with a facilitator, with groups of 25 farmers, who observe
    23 KB (3,334 words) - 05:54, 19 December 2021
  • to represent smallholder producers. Their priorities e.g. for timely and full drainage during and after the monsoon, are better represented than in situations
    31 KB (4,504 words) - 15:47, 16 December 2021
  • potential for scaling-up and commercialisation. While a few did indeed follow the full trajectory, most started at the feasibility stage but did not progress further
    33 KB (4,397 words) - 16:21, 16 December 2021
  • earnings reported by men and women were quite similar, i.e. about 350 BDT/full working day. Decision making on spending LCS income was usually joint, i
    47 KB (6,336 words) - 15:44, 16 December 2021
  • the designated lead technical BGP advisors to individual BGIF projects were full time employed by BGP and therefore also didn’t require additional reimbursements
    15 KB (1,101 words) - 06:49, 28 July 2020
  • allocations to be based on a volumetric basis and ensure full and transparent payment and accounting, (iv) full electrification of the pumping to reduce the operational
    76 KB (11,297 words) - 11:04, 23 November 2020
  • training (both with targets of 40,000). The staffing schedule included a full-time national gender expert and a part-time international gender expert.
    92 KB (11,673 words) - 08:08, 19 November 2021
  • met and that they have equal access to opportunities for realizing their full potential as human beings. gender indicators Gender indicators are performance
    13 bytes (7,933 words) - 11:32, 21 April 2021
  • NWPo promoted an approach including social and environmental considerations, full participation of stakeholders and affected people in planning, and institutional
    32 KB (4,632 words) - 06:53, 23 November 2020
  • File:ARM Aide Memoire 2-14oct 2016 31oct 16.pdf (matches file content)
    recommended a (modest) update of the ToC, a very intensive effort (more than expected) was undertaken. The theory of change (ToC) was updated with contributions
    (1,239 × 1,754 (4.25 MB)) - 10:54, 22 July 2020
  • The Blue Gold lessons learnt report (LLR) will be completed in full at project closure at end-December 2021. Meanwhile, in order to pass on the knowledge
    48 KB (5,884 words) - 12:21, 2 September 2021
  • File:WP9 Gender Approach v1 19sep 16.pdf (matches file content)
    in Blue Gold strategies and approaches (e.g. the CWM strategy and revised ToC) and commented on numerous documents, such as Innovation Fund concept notes
    (1,239 × 1,754 (984 KB)) - 19:50, 16 December 2020
  • File:PP TA ARM Discussion Paper 2016 1oct 16.pdf (matches file content)
    thin the polders –  so that BWDB and DAE field staff and LGIs can play a full role in polder planning and implementation  processes – and thus sustain
    (1,239 × 1,754 (812 KB)) - 09:40, 2 July 2020
  • File:ARM Aide Memoire 27Sep-13Oct 2015.pdf (matches file content)
     full  development  trajectory  from   concept  note  through  scoping,  feasibility,  demonstration,  piloting  to  full  scale
    (1,240 × 1,753 (6.1 MB)) - 06:55, 15 April 2020
  • File:WP6 MRL Plan 31aug 16.pdf (matches file content)
    of reflection and reassessing the ToC is not an MRLteam-only responsible, but shall be owned and supported by the full BGP TA and key partners. The Theory
    (1,239 × 1,754 (940 KB)) - 13:20, 20 April 2021
  • File:Bgp-llr-printable-edition-20211219.pdf (matches file content)
    Qty Qty Total Qty Qty (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) 2.80 63.42 220.88
    (1,240 × 1,753 (20.78 MB)) - 06:04, 20 December 2021
  • NWPo promoted an approach including social and environmental considerations, full participation of stakeholders and affected people in planning, and institutional
    41 KB (6,021 words) - 17:46, 21 November 2020
  • File:TR27 Impact of Blue Gold Program draft final 24apr 21.pdf (matches file content)
    developed on a comprehensive framework/development pathway/theory of change (ToC). This comprehensive framework enabled continuous assessment of the performance
    (1,240 × 1,754 (3.04 MB)) - 08:46, 11 May 2021
  • File:PR jul dec 2015 HPR-Half-Yearly Progress Report Jul-Dec 2015.Final.pdf (matches file content)
    FTR 29 C4 to Khulna C3 to Khulna C1 to Khulna C4 to Patuakhali C3 to Patuakhali C1+C5 to Patuakhali C5 to Patuakhali C1 + C5 to Patuakhali C1 + C2 + BWDB
    (1,240 × 1,754 (3.83 MB)) - 19:25, 8 July 2020
  • File:GoN Program Document BGP 28Aug12.pdf (matches file content)
    Gold at least 200 cooperatives will operate as an effective enterprise in full support of their member’s objectives of higher income. 7 Blue Gold: Program
    (1,239 × 1,754 (3.77 MB)) - 19:23, 8 July 2020
  • File:PR jan jun 2016 HYPR Jan-Jun 2016 9sep 16.pdf (matches file content)
    FTR 01 C4 to Khulna FTR 02 C3 to Khulna FTR 03 C1 to Khulna FTR 04 C4 to Patuakhali FTR 05 C3 to Patuakhali FTR 06 C1+C5 to Patuakhali FTR 07 C5 to Patuakhali
    (1,240 × 1,754 (3.36 MB)) - 10:40, 22 July 2020
  • File:BGP 4 pager IPWM v3.pdf (matches file content)
    infrastructure (SSWMI-fund) has been initiated under BGP. WMGs and WMAs get full responsibility for planning and construction of the infrastructure, to ensure
    (1,240 × 1,753 (7.56 MB)) - 11:11, 15 March 2021
  • File:IR Inception Report, revised March 2014.pdf (matches file content)
    for IPSWAM Polders & Full course for other Polders RT for IPSWAM Polders & Full course for other Polders RT for IPSWAM Polders & Full course for other Polders
    (1,275 × 1,650 (4.35 MB)) - 10:48, 22 July 2020
  • File:GoB BWDB PWMR 2014 (english) 11feb 14.pdf (matches file content)
    Name of the member: 2. Name of father/ husband: 3. Name of mother…………………… 4. Full address…………………… 5. Membership member according to the Member Register ……………………
    (1,240 × 1,754 (998 KB)) - 12:39, 8 July 2020
  • File:BGIF15 Just Farming - Increasing Quality in Mungbean Production 23oct 17.pdf (matches file content)
    unfavorable weather conditions. • While Just Farming could not establish a full relationship with premium clients, a small margin from selling the mungbean
    (1,239 × 1,754 (640 KB)) - 10:57, 22 July 2020
  • File:BGIF26C 23jun 20 SWIFT Phase III Final Report United Purpose.pdf
    BGIF26C 23jun_20 SWIFT Phase III Final Report United Purpose.pdf SWIFT Phase III Final Report BGIF26C
    (1,240 × 1,754 (2.58 MB)) - 19:42, 9 December 2020
  • File:BGIF11 Deltares - Water App tool for water management decision making in P43 2B Jan2017.pdf (matches file content)
    3.05 0.17 0.02 4.88 4.88 4964.78 part. full flow part. full flow full flow part. full flow part. full flow full flow ok ok ok ok ok too small Figure
    (1,240 × 1,754 (5.39 MB)) - 10:57, 22 July 2020
  • File:ARM Aide Memoire 25Nov-4Dec 2017 26feb 18.pdf (matches file content)
    connection between agriculture and water management that the DAE remains a full partner in the BGP. There are two options: (1) extend the DAE DPP till December
    (1,240 × 1,754 (1.43 MB)) - 10:54, 22 July 2020
  • File:TR14 Phase 1 Baseline Survey Report.pdf (matches file content)
    Baseline Survey Report 3. Team Structure Please refer to Work-plan details for full breakdown on team structure and team profiles. A brief outline of the general
    (1,240 × 1,754 (4.44 MB)) - 04:15, 10 March 2021
  • File:BGIF10 Nice Foundation - Improved Pig Hygiene in Kawra Community 13nov 16.pdf (matches file content)
    week Temperature 28.9°C Piglet for a month Piglet for two month 35°C 20-27.8°C Adult pigs weighing 90 kg or above 17.8-22.2°C Reproduction of pigs
    (1,240 × 1,754 (2.93 MB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19 edited.pdf (matches file content)
    project. BGP should also make every effort to ensure that sluices are under the full control of WMGs. (b) Aquaculture ghers: with paddy production now significantly
    (1,240 × 1,754 (3.77 MB)) - 08:20, 18 May 2021

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)