Search results

From Blue Gold Program Wiki
  • In the ToC, this link is explored and provides an important step towards understanding the processes involved.’ Although the benefits of the ToC and the
    29 KB (4,086 words) - 16:03, 16 December 2021
  • gained during the development of a ‘Theory of Change’ (ToC) in 2016. The 2016 Theory of Change (ToC) describes five main development pathways that comprise
    46 KB (6,223 words) - 15:49, 16 December 2021
  • key message of this section is that presently, Bangladesh does not use the full potential of participatory water management for engendering local economic
    10 KB (1,236 words) - 05:50, 19 December 2021
  • met and that they have equal access to opportunities for realizing their full potential as human beings. gender indicators Gender indicators are performance
    52 KB (7,933 words) - 10:45, 12 January 2022
  • File:WP5 - Theory of Change rev 2 25may 16.pdf (matches file content)
    Herpers, Geert Rhebergen, Guy Jones Shital Das and Proteeti Masud First full ToC WP Niels van den Berge This document is issued for the party which commissioned
    (1,240 × 1,754 (3.13 MB)) - 03:56, 24 November 2020
  • insufficient, or because the gates never achieved full closure. Some examples are provided: (a) In P55/2C, the flap gates were installed on the country-side
    44 KB (4,821 words) - 06:00, 19 December 2021
  • Management Organisations (79%) and Labour Contracting Societies (13%). A full listing of all capacity building courses is also provided (see note 2 to
    24 KB (2,655 words) - 15:51, 16 December 2021
  • submit full proposals (two for climate smart adaptation agri-technologies and four for the removal of excessive water hyacinth).  Of the six full proposals
    20 KB (2,745 words) - 16:13, 16 December 2021
  • potential targets at outcome level – and actions required to move towards full achievement of the targets. Working papers WP10 use information collected
    22 KB (2,464 words) - 16:06, 16 December 2021
  • the continued serviceability of the infrastructure are currently not met in full - because O&M budgets with government organisations such as BWDB are – inevitably
    13 KB (1,815 words) - 11:26, 19 December 2021
  • standard for good practices, water management manuals (pictorial version and full-text version) have been developed, in particular for the use by the executive
    30 KB (4,038 words) - 14:56, 16 December 2021
  • polders (eg where World Bank’s CEIP-1 designs allowed for incorporation of the full effects of climate change). Go for greater flexibility – Don’t categorise
    37 KB (4,767 words) - 02:42, 7 December 2021
  • without walls”. In FFS, groups of twenty-five farmers meet regularly during one full production cycle with a facilitator, observe from the trials, discuss, ask
    70 KB (8,460 words) - 15:42, 16 December 2021
  • intermediate-scale infrastructure, there is a missing link in the process of realising the full agricultural potential of coastal polders. There are a number of organisations
    71 KB (10,547 words) - 14:33, 16 December 2021
  • project should be extended to end-December 2021 to allow for an additional full construction season in 2020/21 and to allow the subsequent processing of
    16 KB (2,029 words) - 03:32, 9 November 2021
  • projects; and execute water related projects on behalf of any public agency with full technical, administrative and financial control of the project. BWDB was
    32 KB (3,802 words) - 11:05, 19 December 2021
  • designs are prepared by the BWDB Design Circles. There are three types of full flood protection embankment aimed to prevent entry into the polder of the
    19 KB (2,179 words) - 07:36, 8 December 2021
  • bidders who offered an excellent conceptual design but which didn’t fulfil the full scope were coached to further develop their proposals to address the evaluation
    16 KB (2,332 words) - 16:23, 16 December 2021
  • collection point or organising joint transport, but remained generally short of full joint marketing due to issues of trust or real or perceived quality differences
    42 KB (5,160 words) - 11:50, 21 November 2021
  • problems independently. The activities take place in the field during one full production cycle with a facilitator, with groups of 25 farmers, who observe
    23 KB (3,334 words) - 05:54, 19 December 2021
  • to represent smallholder producers. Their priorities e.g. for timely and full drainage during and after the monsoon, are better represented than in situations
    31 KB (4,504 words) - 15:47, 16 December 2021
  • potential for scaling-up and commercialisation. While a few did indeed follow the full trajectory, most started at the feasibility stage but did not progress further
    33 KB (4,397 words) - 16:21, 16 December 2021
  • earnings reported by men and women were quite similar, i.e. about 350 BDT/full working day. Decision making on spending LCS income was usually joint, i
    47 KB (6,336 words) - 15:44, 16 December 2021
  • the designated lead technical BGP advisors to individual BGIF projects were full time employed by BGP and therefore also didn’t require additional reimbursements
    15 KB (1,101 words) - 06:49, 28 July 2020
  • allocations to be based on a volumetric basis and ensure full and transparent payment and accounting, (iv) full electrification of the pumping to reduce the operational
    76 KB (11,297 words) - 11:04, 23 November 2020
  • training (both with targets of 40,000). The staffing schedule included a full-time national gender expert and a part-time international gender expert.
    92 KB (11,673 words) - 08:08, 19 November 2021
  • met and that they have equal access to opportunities for realizing their full potential as human beings. gender indicators Gender indicators are performance
    13 bytes (7,933 words) - 11:32, 21 April 2021
  • NWPo promoted an approach including social and environmental considerations, full participation of stakeholders and affected people in planning, and institutional
    32 KB (4,632 words) - 06:53, 23 November 2020
  • File:ARM Aide Memoire 2-14oct 2016 31oct 16.pdf (matches file content)
    recommended a (modest) update of the ToC, a very intensive effort (more than expected) was undertaken. The theory of change (ToC) was updated with contributions
    (1,239 × 1,754 (4.25 MB)) - 10:54, 22 July 2020
  • The Blue Gold lessons learnt report (LLR) will be completed in full at project closure at end-December 2021. Meanwhile, in order to pass on the knowledge
    48 KB (5,884 words) - 12:21, 2 September 2021
  • File:WP9 Gender Approach v1 19sep 16.pdf (matches file content)
    in Blue Gold strategies and approaches (e.g. the CWM strategy and revised ToC) and commented on numerous documents, such as Innovation Fund concept notes
    (1,239 × 1,754 (984 KB)) - 19:50, 16 December 2020
  • File:PP TA ARM Discussion Paper 2016 1oct 16.pdf (matches file content)
    thin the polders –  so that BWDB and DAE field staff and LGIs can play a full role in polder planning and implementation  processes – and thus sustain
    (1,239 × 1,754 (812 KB)) - 09:40, 2 July 2020
  • File:ARM Aide Memoire 27Sep-13Oct 2015.pdf (matches file content)
     full  development  trajectory  from   concept  note  through  scoping,  feasibility,  demonstration,  piloting  to  full  scale
    (1,240 × 1,753 (6.1 MB)) - 06:55, 15 April 2020
  • File:WP6 MRL Plan 31aug 16.pdf (matches file content)
    of reflection and reassessing the ToC is not an MRLteam-only responsible, but shall be owned and supported by the full BGP TA and key partners. The Theory
    (1,239 × 1,754 (940 KB)) - 13:20, 20 April 2021
  • File:Bgp-llr-printable-edition-20211219.pdf (matches file content)
    Qty Qty Total Qty Qty (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) Cost (Full) (Part) 2.80 63.42 220.88
    (1,240 × 1,753 (20.78 MB)) - 06:04, 20 December 2021
  • NWPo promoted an approach including social and environmental considerations, full participation of stakeholders and affected people in planning, and institutional
    41 KB (6,021 words) - 17:46, 21 November 2020
  • File:TR27 Impact of Blue Gold Program draft final 24apr 21.pdf (matches file content)
    developed on a comprehensive framework/development pathway/theory of change (ToC). This comprehensive framework enabled continuous assessment of the performance
    (1,240 × 1,754 (3.04 MB)) - 08:46, 11 May 2021
  • File:PR jul dec 2015 HPR-Half-Yearly Progress Report Jul-Dec 2015.Final.pdf (matches file content)
    FTR 29 C4 to Khulna C3 to Khulna C1 to Khulna C4 to Patuakhali C3 to Patuakhali C1+C5 to Patuakhali C5 to Patuakhali C1 + C5 to Patuakhali C1 + C2 + BWDB
    (1,240 × 1,754 (3.83 MB)) - 19:25, 8 July 2020
  • File:GoN Program Document BGP 28Aug12.pdf (matches file content)
    Gold at least 200 cooperatives will operate as an effective enterprise in full support of their member’s objectives of higher income. 7 Blue Gold: Program
    (1,239 × 1,754 (3.77 MB)) - 19:23, 8 July 2020
  • File:PR jan jun 2016 HYPR Jan-Jun 2016 9sep 16.pdf (matches file content)
    FTR 01 C4 to Khulna FTR 02 C3 to Khulna FTR 03 C1 to Khulna FTR 04 C4 to Patuakhali FTR 05 C3 to Patuakhali FTR 06 C1+C5 to Patuakhali FTR 07 C5 to Patuakhali
    (1,240 × 1,754 (3.36 MB)) - 10:40, 22 July 2020
  • File:BGP 4 pager IPWM v3.pdf (matches file content)
    infrastructure (SSWMI-fund) has been initiated under BGP. WMGs and WMAs get full responsibility for planning and construction of the infrastructure, to ensure
    (1,240 × 1,753 (7.56 MB)) - 11:11, 15 March 2021
  • File:IR Inception Report, revised March 2014.pdf (matches file content)
    for IPSWAM Polders & Full course for other Polders RT for IPSWAM Polders & Full course for other Polders RT for IPSWAM Polders & Full course for other Polders
    (1,275 × 1,650 (4.35 MB)) - 10:48, 22 July 2020
  • File:GoB BWDB PWMR 2014 (english) 11feb 14.pdf (matches file content)
    Name of the member: 2. Name of father/ husband: 3. Name of mother…………………… 4. Full address…………………… 5. Membership member according to the Member Register ……………………
    (1,240 × 1,754 (998 KB)) - 12:39, 8 July 2020
  • File:BGIF15 Just Farming - Increasing Quality in Mungbean Production 23oct 17.pdf (matches file content)
    unfavorable weather conditions. • While Just Farming could not establish a full relationship with premium clients, a small margin from selling the mungbean
    (1,239 × 1,754 (640 KB)) - 10:57, 22 July 2020
  • File:BGIF26C 23jun 20 SWIFT Phase III Final Report United Purpose.pdf
    BGIF26C 23jun_20 SWIFT Phase III Final Report United Purpose.pdf SWIFT Phase III Final Report BGIF26C
    (1,240 × 1,754 (2.58 MB)) - 19:42, 9 December 2020
  • File:BGIF11 Deltares - Water App tool for water management decision making in P43 2B Jan2017.pdf (matches file content)
    3.05 0.17 0.02 4.88 4.88 4964.78 part. full flow part. full flow full flow part. full flow part. full flow full flow ok ok ok ok ok too small Figure
    (1,240 × 1,754 (5.39 MB)) - 10:57, 22 July 2020
  • File:ARM Aide Memoire 25Nov-4Dec 2017 26feb 18.pdf (matches file content)
    connection between agriculture and water management that the DAE remains a full partner in the BGP. There are two options: (1) extend the DAE DPP till December
    (1,240 × 1,754 (1.43 MB)) - 10:54, 22 July 2020
  • File:TR14 Phase 1 Baseline Survey Report.pdf (matches file content)
    Baseline Survey Report 3. Team Structure Please refer to Work-plan details for full breakdown on team structure and team profiles. A brief outline of the general
    (1,240 × 1,754 (4.44 MB)) - 04:15, 10 March 2021
  • File:BGIF10 Nice Foundation - Improved Pig Hygiene in Kawra Community 13nov 16.pdf (matches file content)
    week Temperature 28.9°C Piglet for a month Piglet for two month 35°C 20-27.8°C Adult pigs weighing 90 kg or above 17.8-22.2°C Reproduction of pigs
    (1,240 × 1,754 (2.93 MB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19 edited.pdf (matches file content)
    project. BGP should also make every effort to ensure that sluices are under the full control of WMGs. (b) Aquaculture ghers: with paddy production now significantly
    (1,240 × 1,754 (3.77 MB)) - 08:20, 18 May 2021
  • File:BGIF07 World Fish - Ecopond Project - Women-Headed Small Household Ponds 28Dec2015.pdf (matches file content)
    25 & 26 27 & 28 29, 30 & 31 Contents Photos (1) Small homestead pond full with aquatic weeds (2) Small pond with high content of organic matters and
    (1,275 × 1,650 (4.3 MB)) - 10:57, 22 July 2020
  • File:TR25 Outcomes report WMG survey 2018 29oct 18.pdf (matches file content)
    higher increase in c.i. Both sources of data show that polder 30 only had a small increase in c.i. and here 45% of WMG reported a decline in c.i. with another
    (1,240 × 1,754 (1.76 MB)) - 10:37, 22 July 2020
  • File:TR29 outcomes report 2021 11nov 21.pdf (matches file content)
    to Table C1.1, if no, pls go to C2] [িথ্য সংগ্রকািীি েনয শনাে: যরদ C1 েযাাঁ েয় িােহল শেরবল C1.1 এি িথ্য সংগ্রে করুন, যরদ C1 না েহল দয়া কহি C2 িহল যান]
    (1,240 × 1,754 (4.6 MB)) - 08:27, 15 December 2021
  • File:TR24 2018 2019 CAWM Strategic Plan 16sep 18.pdf (matches file content)
    43/1A 43/2F 55/2A 55/2C 47/4 Name of CAWM/WMGs Giala Badhon Danga Kaikhali Fulbari Marichap Gosh Khali Hazi Khali Chalar Beal Full Bari Gopepagla Sener
    (1,240 × 1,754 (1.1 MB)) - 02:06, 12 July 2020
  • File:GoB WARPO Bangladesh Water Act 2013 (English).pdf (matches file content)
    of any other law for the time being in force, the Council may, for giving full effect to the cooperation mentioned under sub-section (2), give advice to
    (1,240 × 1,754 (432 KB)) - 05:48, 28 June 2020
  • File:BGIF24 Moringa Ltd - Moringa Business Plan 11feb 18.pdf (matches file content)
    strategy for us is a preliminary process to enter into the market with our full potential. It helps us to develop a way to maintain a work flow. The main
    (1,240 × 1,753 (1.43 MB)) - 10:57, 22 July 2020
  • File:BGIF05 CDI WUR - Opportunities for development of the Moringa sector Jul2015.pdf (matches file content)
    Leader, C-4 Investment Specialist, C-4 Deputy Component Leader, C-3 Business Development Coordinator, C-4 Business Development Coordinator, C-4 Agriculturist
    (1,240 × 1,753 (1.54 MB)) - 10:58, 22 July 2020
  • File:BGIF13 MarGen - Promoting Natural Cold Store mar 17.pdf (matches file content)
    Respondent’s full name (or name by which he/she is locally know): __________________________________________ FI2. Respondent’s Father’s/Husband’s full name (or
    (1,240 × 1,753 (3.71 MB)) - 10:57, 22 July 2020
  • File:PP TA ARM position paper 2018 3nov 18.pdf (matches file content)
    be used in calculating payments; (c) To be eligible for full payment, all earthwork sections must be achieved in full – including the height of embankment
    (1,240 × 1,754 (31.43 MB)) - 09:52, 2 July 2020
  • File:GoB MoWR National Water Policy January 1999.pdf (matches file content)
    through local consensus. c. For the Government will regulate the extraction of water in the identified sc~'rCI:tv zones with full public knowledge. d.
    (1,240 × 1,758 (6.9 MB)) - 19:41, 8 July 2020
  • File:2jun 20 LCS report Final Formatted.pdf (matches file content)
    rate for shrimp) 2 Full day 400 (and food) /500 (without food) 3 Full day 500/600 (and food) 300/400 (and food) 1.5 Full day/ hourly 400 (and
    (1,240 × 1,754 (1.54 MB)) - 11:52, 9 March 2021
  • File:TR20 2016 17 CAWM Strategic Plan 22 Sep 16.pdf (matches file content)
    to ensure a mind-set change. This starts with active communication how a full year cycle of successful cropping and water management can be realised and
    (1,239 × 1,754 (1.25 MB)) - 10:59, 22 July 2020
  • File:BGIF04 Groenemeijer WUR - Baseline P30 Community Water Management Pilot 28feb 15.pdf (matches file content)
    the livelihoods of the polder citizens. In their efforts to make use of the full potential of the polder system a community water management pilot project
    (1,240 × 1,754 (6.13 MB)) - 07:05, 12 July 2020
  • File:A2-2.1 Savings and Credit Management (Piloting).pdf (matches file content)
    the performance of that specific point found satisfactory then it will get full 3 point and Fair and Poor is 2 and 1 respectively. Around 26 numbers observation
    (1,275 × 1,650 (1.26 MB)) - 05:27, 19 April 2021
  • File:D-1 Training on Value chain & efficient magt of agri macheneries (for COs).pdf (matches file content)
    organizers to the workshop. She expressed that component one (1) will give full support for the workshop and also expressed her gratitude to the component
    (1,275 × 1,650 (1.4 MB)) - 09:45, 20 April 2021
  • File:A3-1.3 MAM Training Evaluation Report Khulna & Patuakhali.pdf (matches file content)
    as because it was all about technical. Part one need not to be part of a full flagged training. It could be covered within a general meeting but though
    (1,275 × 1,650 (1.4 MB)) - 05:34, 19 April 2021
  • File:G-2.2 UZ orientation Brief Note-Kalapara UZP.pdf (matches file content)
    Program especially the community involvement and gave his commitment and full support from Upazila Parishad to implement the Blue Gold Program. Conclusion
    (1,275 × 1,650 (770 KB)) - 05:49, 21 April 2021
  • File:PP TA ARM position paper 2017 18nov 17.pdf (matches file content)
    2018-2019 Plan for 2019-2020 Qty Full MBDT Qty Full Qty Part MBDT Qty Full Qty Part MBDT Qty Full Qty Part MBDT Qty Full Qty Part MBDT 360.00 546.72 210
    (1,240 × 1,754 (9.32 MB)) - 09:45, 2 July 2020
  • File:Research 2014 Imposition of Participation dewan buisson mukherji.pdf (matches file content)
    participatory water management and was implemented in nine out of 123 polders.1 Full-time socio-economists and community organisers spent 18 months mobilising
    (1,240 × 1,754 (921 KB)) - 19:40, 16 December 2020
  • File:BGIF09 nhc FRERMIP - Final report Emergency protection works P29 23jun 18.pdf (category NhC/FRERMIP) (matches file content)
    cross sections were surveyed in the first and second survey cycle. To get a full cross section, the above water part of the bank was surveyed with a RTK GPS
    (1,240 × 1,754 (7.01 MB)) - 10:57, 22 July 2020
  • File:BGIF28 BSMRAU P2 Pen Culture mar 18.pdf (matches file content)
    potential of pen culture in waterlogged conditions, but they failed to get the full benefit of fish culture due to either of shut down the fish culture for unexpected
    (1,275 × 1,650 (1.58 MB)) - 10:57, 22 July 2020
  • File:BGIF33 17aug 20 FINAL PROJECT REPORT BG CAMASMA CIMMYT BD.pdf (matches file content)
    briefed them about the project activities. Briefings were used to encourage full participation of DAE staff (see ‘ANNEX 2: October 2018 Progress Report’)
    (1,275 × 1,650 (2.06 MB)) - 19:54, 9 December 2020
  • File:F-1 Training on Water Management Org Apr 7-16 2014.pdf (matches file content)
    Apr 7-16, 2014 4 Duration of Training Course The course was designed for full of 6 days from April 7-16 2014. Everyday the training session was started
    (1,240 × 1,753 (975 KB)) - 19:21, 20 April 2021
  • File:PR jul dec 2017 BGP HYPR July-Dec 2017.pdf (matches file content)
    Achievements 2.1 Households Reached & Area Covered BGP is working with its full efforts in all the selected polders (22), covering an estimated 199,326 households
    (1,240 × 1,754 (1.89 MB)) - 10:41, 22 July 2020
  • File:A1-4 Crash Training Program on BGP UA Jan15 2017.pdf (matches file content)
    implemented under the umbrella of WMG towards the goal of Blue Gold Program and its full or partly benefits distributed to all the members of this WMG, will be acknowledged
    (1,240 × 1,754 (2.49 MB)) - 08:02, 18 March 2021
  • File:WP03 Building organisation 2jun 16.pdf (matches file content)
    22, 2016 Blue Gold Program NDPD NoC NGO O&M PCD PD PDP PF PMC PSC SAAO SAE SDE SO SSSWRDSP SWAIWRPMP TA TL TNA ToC TOT UAO UDMC UP UZ VAP VC VCA VCD VCS
    (1,239 × 1,754 (1.31 MB)) - 10:59, 22 July 2020
  • File:BGIF27A Innovision - Feasibility Study Pangasius aquaculture 21may 18.pdf (matches file content)
    ……………………… 1.8 gvQ Pv‡l †Kvb cÖKvi cÖvwZôvwbK mn‡hvwMZv (cÖwkÿY/Avw_©K) jvf K‡i‡Qb (grm¨ Awa`ßi/weGdAviAvB/ GbwRI/ mwgwZ/cÖKí? 2. cyKz‡ii Z_¨ welq cyKz‡ii
    (1,275 × 1,650 (1,004 KB)) - 10:57, 22 July 2020
  • File:TR26 outcomes report WMG survey 2019 final 18nov 19.pdf (matches file content)
    project. BGP should also make every effort to ensure that sluices are under the full control of WMGs. (b) Aquaculture ghers: with paddy production now significantly
    (1,240 × 1,754 (1.86 MB)) - 10:37, 22 July 2020
  • File:AWP 2018 19 Annual Work Plan 2018-2019 1aug 18.pdf (matches file content)
    km 50.87 km full & 17.93 km part 2 Embankment Retirement 15.50 km 4.00 km full & 11.50 km part 3 Canal Re-excavation 227.23 km full & 231.46 km
    (1,240 × 1,754 (2.84 MB)) - 10:53, 22 July 2020
  • File:C-4 ToT for FFS organizer on Bief Fateining - Khulna (1-5 June 14).pdf (matches file content)
    Deputy Component leader C3 thanked C4 expert for their orientation conduction with nice presentation. He said that C3 and C4 are like two brothers. So
    (1,240 × 1,754 (2.16 MB)) - 05:39, 20 April 2021
  • File:A1-5 Workshop on Refocussing WMG Capacity Building.pdf (matches file content)
    organization Communication skill Effective and Efficient Plan Preparation Meaning full relation with UP/ (Partnership Development) Team Work Knowledge on Agricultural
    (1,240 × 1,754 (1.5 MB)) - 05:14, 19 April 2021
  • File:BGIF20 WorldFish - Ecopond and Empowerment Project II 8jan 18.pdf (matches file content)
    Director, Department of Fisheries, Khulna Division pointed expressed his full cooperation in implementation of the Blue Gold Program in collaboration with
    (1,275 × 1,650 (2.19 MB)) - 10:57, 22 July 2020
  • File:BGIF18 Consiglieri - Renewable Energy-Based Solutions 8aug 16.pdf (matches file content)
    Installing solar module may require cutting some branches of trees to get full sunlight. This might be the single environmental consideration for SHS. It
    (1,275 × 1,650 (2.37 MB)) - 10:57, 22 July 2020
  • File:C-5 Orientation cum ToT on Homestead Poultry, Nutrition Module.pdf (matches file content)
    to understand whole modules and component 3 will start it field work with full strength. After that the main activities of the orientation cum ToT were
    (1,275 × 1,650 (568 KB)) - 05:40, 20 April 2021
  • File:BGIF26A United Purpose - Feasibility study SWIFT 17apr 18.pdf (matches file content)
    life cycle of the project with BWDB and DAE representatives demonstrating full cooperation and an alliance with the WMGs. Training providing by the project
    (1,240 × 1,754 (2.36 MB)) - 10:57, 22 July 2020
  • File:A3-1.1 Management of Agricultural Macheneries (MAM) Khulna.pdf (matches file content)
    welq (Subject of Evaluation) cÖwkÿ‡bi welq (Subject of Training) cÖwkÿY c×wZ I †KŠkj (Training Methods & Techniques) cÖwkÿKM‡Yi `ÿZv I †KŠkj (Knowledge
    (1,240 × 1,754 (1.61 MB)) - 05:34, 19 April 2021
  • File:BGIF32 29nov 20 Final Report BGIF-KU WH project.pdf (matches file content)
    critical comments and helpful suggestion that led to the development of a full proposal and subsequent approval by BGIF. We acknowledge the cooperation
    (1,240 × 1,754 (1.61 MB)) - 19:52, 9 December 2020
  • File:BGIF08 Acacia - Feasibility study Aquifer Recharge for Agriculture 25feb 15.pdf (matches file content)
    answered by constructing a pilot system and test its use during at least one full year 5.2 Design of the pilot scheme For the type of design of the system
    (1,240 × 1,754 (1.6 MB)) - 10:57, 22 July 2020
  • File:BGIF Procedures Manual v8 22may 18.pdf (matches file content)
    result of your submission might be a direct rejection or an invitation for a full proposal. The rejection or invitation might include a request for further
    (1,240 × 1,754 (2.41 MB)) - 09:44, 24 June 2020
  • File:TW01 Trend Watcher Issue 1 Dec 2016.pdf (matches file content)
    Re-Sectioning /Repair 551 180.98 km(full) 27.79 km (Part) Total : 208.77 km Retire Embankment Construction (Km) 4.58 2.84 (full) 1.74 (Part) Khal Re-excavation
    (1,275 × 1,650 (555 KB)) - 09:57, 1 July 2020
  • File:BGIF14 FHRC - Pilot Community Based Water Management P43 2 and P29 Sep2017.pdf (matches file content)
    ig a tio n R e s o u rc e s c a r c ity 3 . H o u s e h o ld c e n s u s nn - e co re s a n c l a is o c ia s ey rv su C o m m u n it y o r g a n is
    (1,240 × 1,754 (3.57 MB)) - 10:57, 22 July 2020
  • File:BGIF31 1jun 20 PCR Sustaining Sack Farming Practices Practical Action.pdf (matches file content)
    proportionately under two polders (number 47/3 and 47/4) for the study sample. The full data collection and analysis was completed by May 30th. The main objective
    (1,240 × 1,753 (18.16 MB)) - 19:49, 9 December 2020
  • File:P29 Deltares review of BWDB designs 30may 17.pdf (matches file content)
    et al, 1989). A.3 Bangladesh The FAP 21 project implemented and tested a full range of innovative bank protection structures along the Jamuna River in
    (1,240 × 1,754 (1.53 MB)) - 18:29, 8 July 2020
  • File:18feb 21 BGIF booklet practical innovations in CZ v4.5.pdf (matches file content)
    natural pond conditions. The two major challenges to implement the findings at full scale were: • Farmers in Bangladesh can overstock ponds and apply excessive
    (1,240 × 1,753 (26.16 MB)) - 15:51, 14 November 2021
  • File:F-3 Foundation Training Participatory Water Mgmt May 2-8 2017.pdf (matches file content)
    0……………0…………22 b. Relevant-……………………………………………………………….….0……….…….0……….….2…………21 c. Full filament your expectation-……………………………………..1……………..0…………..0………..20 3. Training
    (1,240 × 1,754 (1.27 MB)) - 19:09, 20 April 2021
  • File:PR Jan-Mar 2014 14may 14.pdf (matches file content)
    replication. C1, C2 & C3 to include gender in functionality assessments and needs assessments, and orientation for household survey; C4 includes gender
    (1,240 × 1,754 (1.89 MB)) - 10:40, 22 July 2020
  • File:TN06 Sajna (Moringa Oleifera) Cuttings 23dec 15.pdf (matches file content)
    Applications All parts of the tree can be used in a variety of ways. Sajna is full of nutrients and vitamins and is good in our food as well as in the food
    (1,239 × 1,754 (480 KB)) - 10:11, 2 July 2020
  • File:TNR int6 Multilevel Water Governance 4 15apr 2016.pdf (matches file content)
    starting line for everyone. Equity has the goal of providing everyone with the full range of opportunities and benefits – the same finish line. Gender mainstreaming
    (1,240 × 1,754 (2.34 MB)) - 05:01, 6 May 2021
  • File:WP08A participatory monitoring red 28feb 17.pdf (matches file content)
    r�development�and�to�evaluate�their�progress�(or�shortcomings)�towards�a�full� achievement.�Based�on�their�monitoring�results,�the�WMGs�can�also�make�
    (1,239 × 1,754 (5.98 MB)) - 04:46, 28 July 2020
  • File:CAWM 26mar 20 gajendrapur design report.pdf (matches file content)
    Minizing head loss Under extreme hydraulic conditions, the culvert flows full and is outlet controlled. With nomograph 15A (FHWA, Hydraulic Design of Highway
    (1,240 × 1,754 (3.72 MB)) - 20:00, 9 December 2020

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)