Search results

From Blue Gold Program Wiki
  • not tell much about the quality of work delivered. Although attractive reports can mask the reality of poor execution, they cannot fully prove that all
    16 KB (2,332 words) - 16:23, 16 December 2021
  • the studies conducted through the Blue Gold Program, and the studies and reports which were the main sources of information for Section B. This leads to
    20 KB (2,385 words) - 11:49, 14 December 2021
  • survey of 2020, as reported upon in Technical Report 27, complemented with data from the household survey 2021 reported in Technical Report 29. 1 General features
    67 KB (5,353 words) - 11:24, 19 December 2021
  • five FGDs reported an increase in goats of between 10% and 55%, and six FGD reported a decrease of 20% to 70%. In Satkhira one FGD reported a 20% increase
    32 KB (3,385 words) - 11:19, 19 December 2021
  • Cooperation (refer to Section G Chapter 31 Vocational Training). The Inception Report of the TA team (approved in March 2014) summarised the work plan and budget
    46 KB (6,223 words) - 15:49, 16 December 2021
  • varieties to modern HYVs and hybrids (Tables 6.7 and 6.8). There are no reports of cultivation of local varieties of boro (these seem to have disappeared
    44 KB (4,611 words) - 08:48, 14 December 2021
  • agriculture Acacia 23-Jun-18 BGIF09 Final Report Emergency Protection Polder 29, Khulna (see also other reports under P29) nhC/FRERMIP 13-Nov-16 BGIF10 Improved
    6 KB (0 words) - 04:17, 30 May 2021
  • 5650 participants in total, BGP spent a total of BDT 10,626,520. The M&E reports show that meat production per head of cattle increased by 64 kgs on average
    70 KB (8,460 words) - 15:42, 16 December 2021
  • estimate, and a photographic record showing construction activities. Both reports are available in the File Library. A short case study (in Bangla) is available
    71 KB (10,547 words) - 14:33, 16 December 2021
  • timesheets, etc. do not tell much about the quality of work delivered. Also, reports can be beautiful, but cannot fully proof if all activities have been undertaken
    15 KB (2,269 words) - 06:11, 27 April 2020
  • Blue Gold Program Technical Report 03: Benchmark Report on Mung Bean MFS. September 2015. Blue Gold Program Technical Report 06: Sajna (Moringa Oleifera)
    35 KB (4,537 words) - 15:07, 16 December 2021
  • Apart from delayed procedures and practical problems as reported above, field staff reported that saving LCS income for productive investments was not
    47 KB (6,336 words) - 15:44, 16 December 2021
  • ownership, with over 20% of the landless households reporting shortages. The proportion of households reporting food shortages in the 2017 baseline survey was
    27 KB (4,162 words) - 11:15, 19 December 2021
  • Extension. November 2013. Blue Gold Program: Household Survey Report (PDF). Technical Report No. 6. Euroconsult Mott MacDonald, Bangladesh Water Development
    41 KB (5,154 words) - 15:00, 16 December 2021
  • Context Overview Water management for development Purpose of the Report Structure of this report Executive Authorities Implementing Agencies Other public sector
    8 KB (665 words) - 10:59, 19 December 2021
  • their original allocated schedules. This was mostly due to revising final reports. The BGIF features two funding windows; the water fund and the productive
    30 KB (1,418 words) - 06:11, 27 April 2020
  • The Executive Summary of the Lessons Learnt Report of the Blue Gold Program (BGP), is written with the aim of assisting its intended readership of policy
    29 KB (2,725 words) - 05:38, 16 September 2021
  • irrigation systems. Research by Professor J.Th. Thijsse from Delft resulted in “Report on hydrology of East Pakistan” (published in 1964) which concluded that
    10 KB (1,237 words) - 08:57, 14 December 2021
  • are therefore dedicated to initiating debate, rather than to the mere reporting of achievements. The policy review is organised under the umbrella of the
    5 KB (554 words) - 14:58, 16 December 2021
  • loosely based on the PWMR and explicitly expressed in the TA  Inception Report, is that the scope of responsibility of the WMO is operation and routine
    30 KB (4,038 words) - 14:56, 16 December 2021

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)