  • been adequately rehabilitated so that the primary flood defences and the main drainage networks are ready to deal with flood and rainfall extremes that
    31 KB (4,504 words) - 15:47, 16 December 2021
  • under ghers has more than doubled since the start of BGP. There are three main categories of land use in the BGP area – paddy, non-rice crops and fish produced
    27 KB (4,162 words) - 11:15, 19 December 2021
  • of the polder area. The siltation of the Betna and Morichap river is the main reason for such drainage congestion. Water logging at the north and middle
    72 KB (7,650 words) - 11:09, 19 December 2021
  • cooperatives, as driver for economic development, and the productive sector as the main basis for the economic development envisaged. For some stakeholders, the
    30 KB (4,038 words) - 14:56, 16 December 2021
  • Finally, it set out to harmonise a value chain approach with the current main stance of providing extension, namely by FFS. The development of a Market
    41 KB (5,154 words) - 15:00, 16 December 2021
  • just over half of cultivable land to 85% in this season. Prior to BGP, the main non-rice crop used to be keshari, a local pulse crop, which had almost disappeared
    35 KB (4,537 words) - 15:07, 16 December 2021
  • development: complementing rehabilitation works on embankments, sluices and main drainage channels with small-scale works within the polders’ internal water
    8 KB (665 words) - 10:59, 19 December 2021
  • embankment, to reduce the risk of loss of lives and crops; maintenance of main khals to remove water from the fields, or to store water for supplementary
    33 KB (4,397 words) - 16:21, 16 December 2021
  • Self-assessment of WMG performance 12 Notes 13 References 14 See more The original main purpose of monitoring and evaluation (M&E) in Blue Gold was to monitor and
    22 KB (2,464 words) - 16:06, 16 December 2021
  • adopted in which water safety is improved by repair and rehabilitation of main polder-level water management infrastructure, and water productivity and
    12 KB (1,467 words) - 11:01, 19 December 2021
  • March 2013 to December 2021. Blue Gold has rehabilitated and improved the main water infrastructure in 22 coastal polders in south-west Bangladesh and built
    8 KB (1,291 words) - 09:06, 20 December 2021
  • In the kharif-1 (early monsoon) season fish ghers were, and still are, the main land use in Khulna, with the area now significantly increased. This, along
    44 KB (4,611 words) - 08:48, 14 December 2021
  • development and water security already: Dhaka City – being the country’s main economic hub – is protected against severe floods, whereas lower levels of
    29 KB (2,725 words) - 05:38, 16 September 2021
  • embankments alongside these rivers before adequate knowledge had been gathered. A main concern was that sedimentation between embankments would lead to the rising
    10 KB (1,237 words) - 08:57, 14 December 2021
  • obstructions in primary khals) was an important objective of the extension. A main aim of the September 2020 re-adjustment was to make transfers (of from 20%
    37 KB (4,767 words) - 02:42, 7 December 2021
  • increased demand for wage labour, as for many of them such wage labour is a main income source. Roughly the upper half of this group (i.e. 15% of the total
    70 KB (8,460 words) - 15:42, 16 December 2021
  • itself to achieve the 30% quota for women in WMO executive committees. The main challenge, however, would be ensuring the active and meaningful participation
    12 KB (1,648 words) - 14:38, 16 December 2021
  • the changes in the project concept. While the two separate plans for the main implementing agencies existed throughout the project duration; the TA team
    7 KB (979 words) - 05:57, 19 December 2021
  • fifteen main work items defined in RDPP in Table 12.1 as well as to BWDB's Mechanical Engineering (ME) Division. For each of the fifteen main RDPP work
    44 KB (4,821 words) - 06:00, 19 December 2021