Views
Actions
Search results
From Blue Gold Program Wiki
- been adequately rehabilitated so that the primary flood defences and the main drainage networks are ready to deal with flood and rainfall extremes that31 KB (4,504 words) - 15:47, 16 December 2021
- under ghers has more than doubled since the start of BGP. There are three main categories of land use in the BGP area – paddy, non-rice crops and fish produced27 KB (4,162 words) - 11:15, 19 December 2021
- of the polder area. The siltation of the Betna and Morichap river is the main reason for such drainage congestion. Water logging at the north and middle72 KB (7,650 words) - 11:09, 19 December 2021
- cooperatives, as driver for economic development, and the productive sector as the main basis for the economic development envisaged. For some stakeholders, the30 KB (4,038 words) - 14:56, 16 December 2021
- Finally, it set out to harmonise a value chain approach with the current main stance of providing extension, namely by FFS. The development of a Market41 KB (5,154 words) - 15:00, 16 December 2021
- just over half of cultivable land to 85% in this season. Prior to BGP, the main non-rice crop used to be keshari, a local pulse crop, which had almost disappeared35 KB (4,537 words) - 15:07, 16 December 2021
- development: complementing rehabilitation works on embankments, sluices and main drainage channels with small-scale works within the polders’ internal water8 KB (665 words) - 10:59, 19 December 2021
- embankment, to reduce the risk of loss of lives and crops; maintenance of main khals to remove water from the fields, or to store water for supplementary33 KB (4,397 words) - 16:21, 16 December 2021
- Self-assessment of WMG performance 12 Notes 13 References 14 See more The original main purpose of monitoring and evaluation (M&E) in Blue Gold was to monitor and22 KB (2,464 words) - 16:06, 16 December 2021
- adopted in which water safety is improved by repair and rehabilitation of main polder-level water management infrastructure, and water productivity and12 KB (1,467 words) - 11:01, 19 December 2021
- March 2013 to December 2021. Blue Gold has rehabilitated and improved the main water infrastructure in 22 coastal polders in south-west Bangladesh and built8 KB (1,291 words) - 09:06, 20 December 2021
- In the kharif-1 (early monsoon) season fish ghers were, and still are, the main land use in Khulna, with the area now significantly increased. This, along44 KB (4,611 words) - 08:48, 14 December 2021
- development and water security already: Dhaka City – being the country’s main economic hub – is protected against severe floods, whereas lower levels of29 KB (2,725 words) - 05:38, 16 September 2021
- embankments alongside these rivers before adequate knowledge had been gathered. A main concern was that sedimentation between embankments would lead to the rising10 KB (1,237 words) - 08:57, 14 December 2021
- obstructions in primary khals) was an important objective of the extension. A main aim of the September 2020 re-adjustment was to make transfers (of from 20%37 KB (4,767 words) - 02:42, 7 December 2021
- increased demand for wage labour, as for many of them such wage labour is a main income source. Roughly the upper half of this group (i.e. 15% of the total70 KB (8,460 words) - 15:42, 16 December 2021
- itself to achieve the 30% quota for women in WMO executive committees. The main challenge, however, would be ensuring the active and meaningful participation12 KB (1,648 words) - 14:38, 16 December 2021
- the changes in the project concept. While the two separate plans for the main implementing agencies existed throughout the project duration; the TA team7 KB (979 words) - 05:57, 19 December 2021
- fifteen main work items defined in RDPP in Table 12.1 as well as to BWDB's Mechanical Engineering (ME) Division. For each of the fifteen main RDPP work44 KB (4,821 words) - 06:00, 19 December 2021