Search results

From Blue Gold Program Wiki
  • File:TR14 Phase 1 Baseline Survey Report.pdf (matches file content)
    country owning a few chickens / ducks for eggs, this is not a surprising finding.  The fact that more households own a cow / buffalo than a goat or sheep
    (1,240 × 1,754 (4.44 MB)) - 04:15, 10 March 2021
  • File:IR Inception Report, revised March 2014.pdf (matches file content)
    Catering for a variety of market aspirations: The members of the WMG constitute a homogeneous group vis-à-vis their water safety concerns but a heterogeneous
    (1,275 × 1,650 (4.35 MB)) - 10:48, 22 July 2020
  • File:ARM Aide Memoire 2-14oct 2016 31oct 16.pdf (matches file content)
    Lately it was known that the TA has a WMO tracker system. This should be converted to a dashboard type MIS with target setting that is open access. Quarterly
    (1,239 × 1,754 (4.25 MB)) - 10:54, 22 July 2020
  • File:ARM Aide Memoire 25Nov-4Dec 2017 26feb 18.pdf (matches file content)
    Besides that the PWMR focuses much on fund collection as a panacea for sustained maintenance by the WMG; there is no evidence that this suffices. Such a review
    (1,240 × 1,754 (1.43 MB)) - 10:54, 22 July 2020
  • File:Bgp-llr-printable-edition-20211219.pdf (matches file content)
    xxvii Section A: Background and context� 1 Section A: Summary� 3 01 02 03 04 A.1 The project: the Blue Gold Program� 3 A.2 Setting:
    (1,240 × 1,753 (20.78 MB)) - 06:04, 20 December 2021
  • File:WP9 Gender Approach v1 19sep 16.pdf (matches file content)
    is curious that the IOB survey found that in 0% of the households domestic violence is a social problem. Initially this seems to suggest that there is no
    (1,239 × 1,754 (984 KB)) - 19:50, 16 December 2020
  • File:ARM Aide Memoire 9-20Nov 2018 11jan 19.pdf (matches file content)
    there was a unanimous decision for a no-cost extension of up to 2-years for the completion of the infrastructure. The field offices opined that a no-cost
    (1,240 × 1,754 (1.2 MB)) - 10:54, 22 July 2020
  • File:PP TA ARM position paper 2017 18nov 17.pdf (matches file content)
    (Planning). A copy of the PCD’s presentation to the PEC is included as Annex D(ii). The RDPP was approved at this meeting, with a proviso that a list of 25
    (1,240 × 1,754 (9.32 MB)) - 09:45, 2 July 2020
  • File:BGIF07 World Fish - Ecopond Project - Women-Headed Small Household Ponds 28Dec2015.pdf (matches file content)
    establishing a LC in each community is to create a place with a good learning environment where women to come, sit and share their knowledge. It is a different
    (1,275 × 1,650 (4.3 MB)) - 10:57, 22 July 2020
  • File:PP TA ARM position paper 2018 3nov 18.pdf (matches file content)
    2018 PLAN START TASK DESCRIPTION PLAN END 2019 2020 A S O N D J F M A M J J A S O N D J F M A M J J Phase 1 + 2 Polders (phase out 2018+2019) Orientation
    (1,240 × 1,754 (31.43 MB)) - 09:52, 2 July 2020
  • File:BGIF18 Consiglieri - Renewable Energy-Based Solutions 8aug 16.pdf (matches file content)
    even offers refinancing options 4. Companies that manufacture solar modules or those that use solar modules to contribute solar power to the national grid
    (1,275 × 1,650 (2.37 MB)) - 10:57, 22 July 2020
  • File:TR27 Impact of Blue Gold Program draft final 24apr 21.pdf (matches file content)
    respondents reported that, over a longer time-frame, there had been a large increase in vegetable production. Poultry: although respondents said that poultry production
    (1,240 × 1,754 (3.04 MB)) - 08:46, 11 May 2021
  • File:WP09G WMG Tracker Report up to MARCH 2019 v3 16 05 2019 SKD.pdf (category WMG tracker)
    WP9G: WMG Tracker Report to March 2019 WP09G
    (1,240 × 1,754 (3.15 MB)) - 10:37, 22 July 2020
  • File:WP09F WMG Tracker Report to Dec 2018 iss 20feb 19 opt.pdf (category WMG tracker)
    WP9F: WMG Tracker Report to December 2018 WP09F
    (1,240 × 1,754 (2.96 MB)) - 10:37, 22 July 2020
  • File:P29 Lower Bhadra IWM river survey report 23jul 17.pdf (matches file content)
    ....9 Table 5: Float Tracking Log during May 13-14, 2017 on the Lower Bhadra River ....................19 Table 6: Float Tracking Log during May 27-28
    (1,275 × 1,650 (8.99 MB)) - 19:46, 8 July 2020
  • File:MF P29 master file 4nov 14.pdf (matches file content)
    area. Dumuria Bhanderpara Sahos Sarafpur A B A C A B1 A Surkhali A Sources; IPSWAM planning study 2005 A=All village B= Nalghona, Ghona taltala,
    (1,240 × 1,754 (3.97 MB)) - 13:43, 20 April 2021
  • File:MF P43 2D master file 20apr 15.pdf (matches file content)
    Bangladesh as a means to increase income. It is a highly lucrative and profitable business with high profit margins. For a 15 decimal sized pond, a farmer can
    (1,240 × 1,754 (4.51 MB)) - 13:46, 20 April 2021
  • File:MF P43 2F 27sep 18.pdf (matches file content)
    ght ed (b) contri bution (b) contri bution (b) contrib bution (a) bution (a) ution C=a C=a C=ax xb xb b 1 22.00 59.75 1 59.75 15.75 1 15.75 1 39.5 32.75
    (1,240 × 1,754 (3.37 MB)) - 13:38, 20 April 2021
  • File:AWP 2019 20 Annual Work Plan 2019-2020 10jul 19.pdf (matches file content)
    contribution to a reexcavation of a khal, or the uptake in the annual planning of BADC of a khal). • WMAs need to be introduced at a higher level than
    (1,275 × 1,650 (3.06 MB)) - 10:53, 22 July 2020
  • File:PR jul dec 2018 BGP HYPR Jul-Dec 2018 final opt.pdf (matches file content)
    27/2  A WMG repaired a sluice gate that cost BDT 4700 and about 40-45 acre of land was benefited.  2 WMGs cleaned the field channel that improved water
    (1,240 × 1,754 (2.81 MB)) - 10:40, 22 July 2020

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)