10 Coastal Infrastructure

From Blue Gold Program Wiki

Coastal Zone[edit | edit source]

Briefing Materials
Ico sl-tb-cs.png
The following materials illustrate concepts, interventions, outcomes and lessons learnt, including through stories from community members.
Thematic brochures
Videos

The coastal zone in Bangladesh has a complex agro-ecology, with low lying land and huge tidal rivers. To provide protection to agricultural land from tidal and monsoonal flooding and saline water intrusion, around 1.2 million hectares are now enclosed in 139 polders, whose construction started from the 1960s and 1970s. Now, the polders are home to about ten million people.

The tidal rivers draining the coastal zone carry flood flows during the monsoon season but are highly saline during the dry season when outflows in the tidal rivers are at their lowest. The rivers cause greatest damage to polder infrastructure during times of flood and cyclonic storms – compounded during high water spring tides - when the erosive power of the rivers can damage and even breach the polder embankments. The consequence of a breach can have enormous social and economic impact, resulting in loss of life in severe cases; immediate loss of economic production - crops, fish, livestock, and businesses;  damage to infrastructure – roads, utilities, homes, shops, schools; and longer term impacts on the productivity of agricultural lands. These problems will be increasingly exacerbated by climate change and sea-level rise over time.

During the monsoon, polder farmers are keen to capture and store the non-saline floodwaters in the khals or drainage channels. For this purpose, the new regulators constructed under Blue Gold are provided with a lifting frame (also known as ‘goal posts’) with a pulley and chain so that the flap gates on the river-side of the regulators can be lifted at high tide to admit freshwater (within BWDB these regulators are known as ‘flushing sluices’).

This chapter provides background to the development of infrastructure in the coastal zone as a result of Dutch/Bangladesh cooperation.

Background to Dutch-Bangladesh cooperation in the coastal region[Notes 1][edit | edit source]

During the 1950s and 1960s, two Dutch water engineers contributed to the mitigation of the impact of flooding in Bangladesh: Professor J.Th. Thijsse and Professor Willem Johan van Blommestein.

From 1951 to 1959, the Dutch water engineer, Professor Willem Johan van Blommestein, was posted to East Pakistan (now Bangladesh) by the Food and Agriculture Organisation (FAO). During this time, he prepared a series of plans to protect the country from storms, cyclones and floods: including  a plan for the Brahmaputra-Ganges delta which consisted of a moveable weir in the Brahmaputra with horizontal hydropower turbines, a channel between the Brahmaputra and Ganges, sea dykes with weirs and locks, pumping stations, polders and large-scale irrigation systems.

Research by Professor J.Th. Thijsse from Delft resulted in “Report on hydrology of East Pakistan” (published in 1964) which concluded that the regulation of large and unstable rivers with massive discharges, such as the Ganges and the Brahmaputra, was impossible. The Thijsse report advised the government against the construction of embankments alongside these rivers before adequate knowledge had been gathered. A main concern was that sedimentation between embankments would lead to the rising of river-beds and flood levels, but he was also apprehensive about the potentially catastrophic consequences of embankment failure, given the deceptive sense of security felt by those living inside the ‘protected’ areas.  

After the large-scale flooding of Bangladesh in 1954/55, a United Nations’ mission (the Krug Mission) mobilised in 1956-1957 to advise the government about water and flood dynamics in East Pakistan. The Krug Mission Report of 1957 recommended Inter alia the setting up of a Department of Waterways (modelled after Rijkswaterstaat: the Dutch agency for public works and water management) – which resulted in the establishment of the East Pakistan Water and Power Development Authority (EPWAPDA).[Notes 2]

In December 1964, a Master Plan prepared by EPWAPDA, assisted by the International Engineering Company (IECO) of San Francisco, California USA, recommended large-scale flood control, drainage and irrigation projects.

Starting from the early-1960s, many polders and embankments were constructed in coastal areas, to protect coastal communities from salinity intrusion, daily tidal movement and occasional surges, and to support the population engaged in farming and aquaculture activities. The Coastal Embankment Project (CEP) was the first comprehensive plan for providing protection against flood and saline water intrusion in the coastal area. CEP constructed more than 4,000 km of embankment and 1,039 drainage sluices in fourteen coastal Districts between 1961 and 1978 in two phases: Phase I included 92 polders and provided protection to one million ha of land; and Phase II consisted of 16 polders covering another 0.40 million ha.

Throughout the 1970s, Dutch-Bangladesh cooperation focused on transport, water management and industry, reflecting the need to reboot the economy of a war-ravaged country.  In 1972, an agreement was signed between the Netherlands and Bangladesh to carry out dredging activities in Bangladesh. The Early Implementation Project (EIP 1975-1997) introduced people’s participation into the project development cycles through sub-project identification, feasibility, planning, design and implementation.

The construction of two cross-dams over branches of the river Meghna on the coast of the Noakhali District during 1957 and 1963 showed the positive potential of settling accreted land. During 1976, encouraged by the tremendous accretion, the Government of Bangladesh requested the Netherlands Government for technical assistance in land reclamation. Based on the Identification Mission Report, the Land Reclamation Project (LRP) began to function in late 1977 and continued to 1991.

Building on the earlier success of the Early Implementation Project (EIP), the Netherlands supported the participatory water management (PWM) approach and, with IFAD, jointly funded the Local Government Engineering Department’s (LGED) Small-Scale Project Water Resources Management Project (<1,000ha) from 1996 to 2002. SSWRMP successfully demonstrated people’s active participation in taking responsibility for operation (100%) and routine maintenance of small-scale water infrastructure works.

Based on the positive outcome of the Land Reclamation Project (LRP), the Char Development and Settlement Project[6] (CDSP 1994-2022) was designed to facilitate settlement of government (khash) lands by the landless in Noakhali District; integrated development of reclaimed (khash) lands settled by the landless, including the construction of climate resilient infrastructure; poverty alleviation through livelihood improvement for the new land (char) dwellers; and a contribution to the accumulation and dissemination of data and knowledge on the coastal areas, including Integrated Coastal Zone Management (ICZM). In order to address all these aspects, a multi-sectoral and multi-institutional approach was employed.

Integrated Planning for Sustainable Water Management (IPSWAM 2002-2011) led to the rehabilitation of nine polders in the coastal zone and improved the lives of many thousands. The Guidelines on Participatory Water Management (GPWM) was published in in April 2001, bringing together and harmonising a number of project-level approaches. IPSWAM was the first project to adopt GPWM and put the principles into practice. Between 2006 and 2015 a renewed, a more practical and sustainable model of participatory water management was implemented with Dutch support through the South West Area Integrated Water Resources Planning and Management Project (SWAIWRPMP 2006-2022).  The Blue Gold Program (2013-2021) was then designed on the back of this cumulative experience to empower rural communities to be the driving force for change.


Notes[edit | edit source]

  1. This section supplements the discussion under ‘Previous History’ in Section A Chapter 4
  2. The present Bangladesh Water Development Board was established in 1972 under presidential order no. 59 of 1972, when the former EPWAPDA was split into two organisations: BWDB dealing with water and the Power Development Board (PDB) dealing with power.

See more[edit | edit source]

Previous chapter:
Chapter 09: The Overall Outcomes and Impacts on the Livelihoods of Coastal Communities in Blue Gold Polders
Blue Gold Lessons Learnt Wiki
Section C: Water Infrastructure
Next chapter:
Chapter 11: Investments for Polder Safety and Water Management
Section C: Water Infrastructure
Chapter 10: Coastal Infrastructure Chapter 11: Investments for Polder Safety and Water Management Chapter 12: Survey, Design and Procurement
  1. Coastal Zone
  2. Background to Dutch-Bangladesh cooperation in the coastal region
  1. Polder Investments
  2. Revisions to Polder Infrastructure Investments
  3. Investments by Polder and by BWDB Division
  4. Emergency Repairs
  1. Survey and design data collection
  2. Design
Chapter 13: Construction: Progress, Modalities and Lessons Learnt
  1. Analysis of Progress
  2. Nature of Works
  3. Contractors
  4. Construction quality
Blue Gold Wiki
Executive summary: A Call for Action
Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure


Summary


Summary and Introduction


Summary

Section D: BGP Interventions: Participatory Water Management Section E: Agricultural Development Section F: Responsible Development: Inclusion and Sustainability


Summary



Summary


Summary

Section G: Project Management Section H: Innovation Fund Files and others


Summary


Summary